IR 05000263/2019011: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 22: Line 22:


Mr. Christopher Church Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362
Mr. Christopher Church Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362
-9637
-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
 
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT
-INFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE INSPECTION; INSPECTION REPORT 05000263/2019011 Dear Mr. Church
-INFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE INSPECTION; INSPECTION REPORT 05000263/2019011 Dear Mr. Church
: On June 3, 2019
: On June 3, 2019

Revision as of 19:08, 14 May 2019

Ltr. 03/15/19 Monticello Nuclear Generating Plant - Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000263/2019011 (DRS-D.Szwarc)
ML19074A304
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/15/2019
From: Dariusz Szwarc
Engineering Branch 3
To: Church C
Northern States Power Company, Minnesota
References
IR 2019011
Download: ML19074A304 (6)


Text

March 15, 2019

Mr. Christopher Church Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362

-9637 SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT

-INFORMATION REQUEST FOR NRC TRIENNIAL EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS (50.59) BASELINE INSPECTION; INSPECTION REPORT 05000263/2019011 Dear Mr. Church

On June 3, 2019

, the U.S. Nuclear Regulatory Commission (NRC) will begin a 50.59 baseline inspection at the Monticello Nuclear Generating Plan This inspection will be performed in accordance with the NRC baseline Inspection Procedure 71111.17 The onsit e portion of th e inspection will take place during the week of June 3, 2019

. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staf In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspectio These documents have been divided into three group The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspectio This information should be made available via compact disc and delivered to the regional office no later than April 15, 201 The inspection team will review this information and, by April 29, 2019, will request specific items that should be provided for review in the regional office by May 13, 201 The second group of requested documents contains additional items that the team will review, or need access to, during the inspectio Certain documents contained within Group II (i.e., Item (1)), will be requested for review in the regional office prior to the inspection by May 13, 2019, as identified abov The remaining documents should be available by the first day of the onsite inspection, June 3, 201 The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspectio It is requested that this information be provided to the lead inspector as the information is generated during the inspectio It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspectio C. Church -2- The lead inspector for this inspection is Mr. Dariusz Szwar We understand that our regulatory contact for this inspection is Mr. Stephen Sollom of your organizatio If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov

. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150

-001 The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Numbe This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading

-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Sincerely,

/RA/ Dariusz Szwarc, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety Docket No. 50

-263 License No. DPR

-22 Enclosure:

Document Request for Baseline 5