| {{#Wiki_filter:Fermi2Power-FlowMap101020203030404050506060707080809090100100110110101020203030404050506060707080809090100100110110ScramRegion-IFOPRMisINOPExitRegion-IFOPRMisINOPRROscillation(49.0%to54.0%Speed)MELLL-100%RL-90%RL-80%RL-70%RL-81%FlowNatCirc(Approx)MinSpeedICFRegionPercentCoreFlow(basedonProcessComputerpoint)Approvedby:Supervisor,ReactorEngineering/Date P e r c e n tP o w e r Form 78.000.09 Att 3 P1/1 082905 IP: I DTC: TGCHEM File: 1327.01 OFFGAS LOG RADIATION MONITORS CONVERSION FACTORS FOR TECHNICAL SPECIFICATIONS Date Time 1. Obtain the following information from Attachment 1: | | {{#Wiki_filter:Fermi2Power-FlowMap101020203030404050506060707080809090100100110110101020203030404050506060707080809090100100110110ScramRegion-IFOPRMisINOPExitRegion-IFOPRMisINOPRROscillation(49.0%to54.0%Speed)MELLL-100%RL-90%RL-80%RL-70%RL-81%FlowNatCirc(Approx)MinSpeedICFRegionPercentCoreFlow(basedonProcessComputerpoint)Approvedby:Supervisor,ReactorEngineering/Date P e r c e n tP o w e r Form 78.000.09 Att 3 P1/1 082905 IP: I DTC: TGCHEM File: 1327.01 OFFGAS LOG RADIATION MONITORS CONVERSION FACTORS FOR TECHNICAL SPECIFICATIONS Date Time 1. Obtain the following information from Attachment 1: |
| : a. Radioactivity Rate (Step 5): mCi/sec b. Offgas Flow Rate (Step 1c): cfm c. Rad Monitor Readings (Step 1b) D11-K601A mr/hr D11-K601B mr/hr 2. Perform the following conve rsion factor calculations: | | : a. Radioactivity Rate (Step 5): mCi/sec b. Offgas Flow Rate (Step 1c): cfm c. Rad Monitor Readings (Step 1b) D11-K601A mr/hr D11-K601B mr/hr 2. Perform the following conve rsion factor calculations: |
| D11-K601A Conversion Factor Offgas D11-K601A mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr) | | D11-K601A Conversion Factor Offgas D11-K601A mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr) |
Revision as of 23:28, 29 April 2019
Similar Documents at Fermi |
---|
Category:License-Operator
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21326A1532021-06-16016 June 2021 ES-401-1 and ES-401-3_Initial ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A4252021-06-16016 June 2021 ES-403-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A0922021-06-16016 June 2021 ES-301-6 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 2024-07-09
[Table view] |
Text
Fermi2Power-FlowMap101020203030404050506060707080809090100100110110101020203030404050506060707080809090100100110110ScramRegion-IFOPRMisINOPExitRegion-IFOPRMisINOPRROscillation(49.0%to54.0%Speed)MELLL-100%RL-90%RL-80%RL-70%RL-81%FlowNatCirc(Approx)MinSpeedICFRegionPercentCoreFlow(basedonProcessComputerpoint)Approvedby:Supervisor,ReactorEngineering/Date P e r c e n tP o w e r Form 78.000.09 Att 3 P1/1 082905 IP: I DTC: TGCHEM File: 1327.01 OFFGAS LOG RADIATION MONITORS CONVERSION FACTORS FOR TECHNICAL SPECIFICATIONS Date Time 1. Obtain the following information from Attachment 1:
- a. Radioactivity Rate (Step 5): mCi/sec b. Offgas Flow Rate (Step 1c): cfm c. Rad Monitor Readings (Step 1b) D11-K601A mr/hr D11-K601B mr/hr 2. Perform the following conve rsion factor calculations:
D11-K601A Conversion Factor Offgas D11-K601A mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr)
= / ( x )
D11-K601B Conversion Factor Offgas D11-K601B mCi/sec Radioactivity Flow Rate Reading mr/hr x cfm = Rate (mCi/sec) / (cfm) x (mr/hr)
= / ( x )
Detach bottom portion and post on Control Room Panel H11-P601 next to Offgas Log Radiation Monitors Recorder D11-R601.
CONVERSION FACTOR l mCi/sec l mCi/sec Rad Monitor l mr/hr x cfm Rad Monitor lmr/hr x cfm D11-K601A l D11-K601B l THESE CONVERSION FACTORS ARE TO BE USED TO OBTAIN A mCi/sec RELEASE RATE FROM OFFGAS LOG RADIATION MONITORS.
TO USE CONVERSION FACTORS, MULTIPLY FACTOR BY CURRENT OFFGAS LOG RADIATION MONITOR READING (mr/hr) AND CURRENT OFFGAS FLOW RATE (cfm): mCi/sec = FACTOR x MONITOR READING x OFFGAS FLOW*
- Flow as read from N62-R808, O/G Outlet Flow Rec pen labeled Charcoal Unit 1-6.
Performed By Date Approved By Date Chemist/designee Noted By Date SM DC Sources-Operating 3.8.4 3.8 ELECTRICAL POWER SYSTEMS 3.8.4 DC Sources-Operating LCO 3.8.4 The Division I and Division II DC electrical power subsystems shall be OPERABLE.APPLICABILITY:
MODES 1, 2. and 3.ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One battery charger A.1 Restore battery 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> inoperable, charger to OPERABLE status.B. One DC electrical B.1 Restore DC electrical 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> power subsystem power subsystem to inoperable for reasons OPERABLE status.other than Condition A.C. Required Action and C.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Associated Completion Time not met. AND C.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> FERMI UNIT 2 3.8-16 Amendment No. 134 DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is 7 days 125.7 V on float charge.SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.
OR Verify each battery cell-to-cell and terminal connection resistance is 5 1.5E-4 ohm.SR 3.8.4.3 Verify battery cells, cell plates, and 18 months racks show no visual indication of physical damage or abnormal deterioration that could degrade battery performance.
SR 3.8.4.4 Remove visible corrosion and verify battery 18 months cell to cell and terminal connections are coated with anti-corrosion material.SR 3.8.4.5 Verify each battery cell-to-cell and 18 months terminal connection resistance is< 1.5E-4 ohm.SR 3.8.4.6 Verify each required battery charger 18 months supplies 2 100 amps at 124.7 V for> 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.(continued)
FERMI -UNIT 2 3.8-17 Amendment No. lgl, 136 DC Sources- Operating 3.8.4 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.8.4.7 ------------------.
NOTE--------------
The performance discharge test in SR 3.8.4.8 may be performed in lieu of the service test in SR 3.8.4.7 once per 60 months.---------------------------------
Verify battery capacity is adequate to 18 months supply, and maintain in OPERABLE status, the actual or simulated emergency loads for the design duty cycle when subjected to a battery service test.SR 3.8.4.8 -------------------
NOTE--------------
-. ..-This Surveillance shall not be performed in MODE 1, 2, or 3. However, credit may be taken for unplanned events that satisfy this SR.--------------
Verify battery capacity is M 80% of the 60 months manufacturer's rating when subjected to a performance discharge test. AND 18 months when battery shows degradation or has reached 85%of expected life FERMI UNIT 2 3.8-18 Amendment No. 134