| | issue date = 08/14/2008 | | | issue date = 08/14/2008 |
| | title = Memo from Gilbert Guerra to Harry Freeman, Subject: Columbia Generating Station, Allegation Closure (RIV-2007-A-0079) | | | title = Memo from Gilbert Guerra to Harry Freeman, Subject: Columbia Generating Station, Allegation Closure (RIV-2007-A-0079) |
| | author name = Guerra G L | | | author name = Guerra G |
| | author affiliation = NRC/RGN-IV/DRP/RPB-A | | | author affiliation = NRC/RGN-IV/DRP/RPB-A |
| | addressee name = Freeman H A, Walker J L | | | addressee name = Freeman H, Walker J |
| | addressee affiliation = NRC/RGN-IV | | | addressee affiliation = NRC/RGN-IV |
| | docket = 05000397 | | | docket = 05000397 |
Revision as of 03:11, 11 July 2019
|
---|
Category:Memoranda
MONTHYEARML24297A6392024-10-30030 October 2024 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station ML23156A2822023-06-0505 June 2023 Summary of Meeting with Q & a Session to Discuss the 2022 Annual Assessment of Safety Performance at CGS ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML20322A0362020-11-19019 November 2020 Summary of October 19, 2020, Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML19053A2922019-02-20020 February 2019 Memorandum to File from P. Longmire Decommissioning Funding Plans for Columbia Generating Station ML15191A2892018-10-17017 October 2018 Response to Task Interface Agreement 2014-08 - Columbia Generating Station - Assessment of the Design and Licensing Bases for the Tower Makeup System (CAC No. MF4630; EPID L-2014-LRA-0002) ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML16117A5552017-11-0303 November 2017 Response to Task Interface Agreement 2014-07, Columbia Generating Station Design and Licensing Basis for Containment Nitrogen Inerting System and Emergency Diesel Generator Fresh Air Intakes ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16230A2512016-08-0404 August 2016 Energy Northwest - Response to Volume 13- Emergency Preparedness Procedures ML16132A5122016-05-16016 May 2016 Notice Of Closed Meeting With USACE, NRC And Energy Northwest To Discuss Flood Analysis Associated With Columbia Generating Station ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML15173A2732015-06-30030 June 2015 Summary of June 4, 2015, Category 1 Public Meeting with Energy Northwest to Discussion Columbia Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1, ML14149A1012014-06-0202 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Columbia Generating Station ML14148A3392014-05-30030 May 2014 G20130776/LTR-13-0866 - Memorandum to File and Transcript of 4/30/2014 Petition Review Board Conference Call with Charles Johnson, Oregon & Washington Physicians for Social Responsibility; 2.206 Petition Seismic Hazards at Columbia ML14050A3502014-02-25025 February 2014 G20130776/LTR-13-0866 - Memorandum to File and Transcript of 2/4/2014 Petition Review Board Conference Call with Charles Johnson, Oregon & Washington Physicians for Social Responsibility; 2.206 Petition Seismic Hazards at Columbia ML14087A1642013-12-12012 December 2013 Cooling Water Intake Screen NMFS Consultation No. (I/NWR/2011/05286) ML14091A2182013-12-12012 December 2013 Cooling Water Intake Screen NMFS Consultation No. (I/NWR/2011/05286) ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13098A0642013-04-10010 April 2013 Memorandum to File, Verbal Authorization on 4/6/2013 of Relief Request ISI3-13, Temporary Non-Code Repair of Reactor Water Cleanup System Piping to Prevent Reactor Shutdown Until Start of Refueling Outage 21 ML13071A4702013-02-28028 February 2013 Response to NRC Order EA-12-051-Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation ML12278A1212012-10-0404 October 2012 Notice of Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML12102A2382012-06-13013 June 2012 Memo Conclusion of Informal Section 7 Consultation with U.S. Fish and Wildlife Service for Columbia Generating Station and Section 7 Consultation Report ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML13255A1152012-05-18018 May 2012 E-mail from B. Balsam, NRR to S. Uttal, OGC FW: Section 7 Memo ML13255A1132012-05-18018 May 2012 Memo from J. Susco, NRR to B. Holian, NRR and M. Galloway, NRR on Section 7 Consultants That Extend Beyond the Nrc'S Issuance of Renewed Operating License and ESA Section 7(D) Findings ML13255A1122012-05-17017 May 2012 Email from B. Balsam, NRR to L. Subin, OGC Et Al., on Section 7 Memo ML12101A3952012-05-0404 May 2012 Conclusion of Efh Consultation for Columbia Generating Station and Efh Consultation Report ML12058A4962012-02-27027 February 2012 License Renewal Application ML11350A0562011-12-21021 December 2011 12/15/11, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal Safety Evaluation Repo ML11348A0142011-12-16016 December 2011 Summary of Telephone Conference Call Held on 12/06/11, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal SER with Open Items ML11336A1502011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 14, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open I ML11339A0872011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 28, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Upper Shelf Energy Open Item in the Columbia License Renewal Safety Evaluation Report with O ML11291A0792011-11-0101 November 2011 09/27/2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Columbia Generating Station License Renewal Application (Tac No. ME3121) ML11273A0662011-10-0404 October 2011 Summary of the Telephone Conference Call Held on September 29, 2011, Concerning the Inspection Report Pertaining to the Columbia Generating Station, License Renewal Application ML11238A1582011-09-14014 September 2011 8/25/11 - Summary of Telephone Conference Call Between NRC and Energy Northwest Concerning Drais Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML11238A1202011-09-0707 September 2011 Notice of Forthcoming Meeting to Discuss the D-SEIS for the Lr of Columbia Generating Station ML11242A0942011-08-30030 August 2011 Advisory Committee on Reactor Safeguards Review of the Columbia Generating Station, License Renewal Application - Safety Evaluation Report with Open Items ML1117305512011-06-21021 June 2011 Notice of Forthcoming Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML1108714952011-04-0505 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between NRC and Energy Northwest, Concerning the RAI Pertaining to the Columbia Generating Station, LRA (Tac No. ME3058) ML1106704962011-03-28028 March 2011 Summary of Telephone Conference Call Held on 2/28/11 Btw the USNRC and Energy Northwest Concerning Draft Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML1102007102011-02-0303 February 2011 01/11/11 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Applicat ML1101405882011-01-31031 January 2011 01/12/11 Summary of Telephone Conference Call Held Between NRC and Energy Northwest, Concerning the Responses to RAI Pertaining to the Columbia Generating Station. License Renewal Application ML1100604382011-01-13013 January 2011 Summary of Telephone Conference Call Held on 1/5/11, Between NRC and Energy Northwesy, Concerning the RAI Pertaining to the Columbia Generating Station License Renewal Application (Tac No. ME3058) ML1100500182011-01-0606 January 2011 Summary of Telephone Conference Call Held on January 3, 2011, Between the NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application (TAC Number ME3 2024-06-28
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 August 14, 2008 MEMORANDUM TO: Harry Freeman, Senior Allegation Coordinator Judith Walker, Allegation Coordinator FROM: Gilbert L. Guerra, Senior Project Engineer, Project Branch A THRU: Claude E. Johnson, Chief, Project Branch A
SUBJECT:
REVIEW OF LICENSEE RESPONSE TO ALLEGATION (RIV-2008-A-0086)
The concerns were referred to Energy Northwest (Columbia Generating Station) for review.The NRC's Region IV Project Branch A staff's review of the licensee's response found that the licensee had substantiated the allegation.
The investigation was performed by a licensee employee who was independent of the nuclear generation organization.
The employee was well qualified to perform this investigation and the investigation was of sufficient depth and scope.Concern The protected equipment program is not being properly implemented.
Examples from the spring 2007 refueling outage (RF018) include: (1) The licensee had four different sources that listed protected equipment but all four were different;.and (2) None of the four lists matched the equipment signs in the plant.Licensee's Assessment
- 1. The licensee's investigation-into this concern included interviews with key managers and staff and a review of corrective action databases including the Plant Tracking Log, Problem Evaluation Requests, Condition Reports, and Action Requests from July 2004 through July 2008 to reveal information pertinentto this concern. Also, reviews of the controlling procedures were performed.
- 2. The licensee found two condition reports addressing this concern.'CR-2-07-04955; written on May 24, 2007'documented that Procedure PPM 1.20.3, "Outage Risk Management," and Procedure 01-49, "Protected Systems," were not in agreement with regard to when protected equipment signs were Used. Procedure 1.20.3, states that, "Areas around protected Key Safety Function Equipment and their power supplies should be controlled by 'Protected Equipment Area' signs near or at the entrance to these equipment areas." Procedure 01-49, states that, "Protected signs are normally used in the Main Control Room only. Although not normally required, protected signs may be* placed in the field as determined by the shift Manager." (Bold added for emphasis)fCR-2-07-05790, written on June 9, 2007 documented that three protected eqbipment lists from three different sources were compared and they were not in alignment.
The protected equipment information in these three sources differed on exactly what equipment was protected.
Plant equipment was also checked to see if signs were posted and this differed with what was listed in the Control Room Log.3. The licensee substantiated the concern, stating that there was ample evidence that the implementation of the protected equipment program was less than adequate.
Specifically, the operations instruction and the outage procedure were not well aligned as to which document was controlling and specifically what mechanisms would be utilized to ensure the appropriate systems were identified and the appropriate signs hung in the field. Corrective actions included aligning the procedures to state that during outage periods Procedure PPM 1.20.3,"Outage Risk Management," should be referenced for posting recommendations, and that during at power operations Procedure 01-49, "Protected Svstems," is referenced.
Additionally, a third Condition Report"R-CR 001 84225)' was opened stating that operations and outage manage ment should review the investigation report and kCls 2-07-04955 and 2-07-057915, and that corrective actions be initiated to ensure that protected equipmentists .from different sources are in alignment and that protected equipment signs are posted for all protected systems as required by PPM 1.20.3.NRC Resolution
- 1. The NRC Project Branch A staff assessed the licensee's investigation and independently reviewed the above mentioned condition reports and procedures.
The staff determined that the concern was substantiated in that the protected equipment program was not properly implemented during RFO18. The corrective action taken and proposed by the licensee appeared sufficient to address the concern.2. No enforcement action is recommended.
Specifically, procedures 01-49 and PPM 1.20.3 are not safety-related, nor required by technical specifications and as a result are not subject to enforcement.
These-procedures, which prescribe actions to take for protecting equipment during both operational and shutdown modes of operation, only recommend the posting of signs for protected equipment.
Additionally, the referenced corrective action documents provide that the concerns were self-identified and evaluated by the licensee.
The errors had no actual impact on safety equipment (i.e. no work was inadvertently performed on the protected equipment as a result of any mis-posted signs or any potential confusion caused by the differing protected equipment lists) and caused no safety consequences.
Therefore, the inspectors determined that the corrective action taken and proposed by the licensee appeared sufficient to address this concern.