ENS 40081: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 08/16/2003 07:53 EDT
| event date = 08/16/2003 07:53 EDT
| last update date = 08/16/2003
| last update date = 08/16/2003
| title = Unit 2 Commenced A Shutdown After Entering Tech Spec 3.0.3
| title = Unit 2 Commenced a Shutdown After Entering Tech Spec 3.0.3
| event text = Both channels 1 and 3 of the FWST (Refueling Water Storage Tank) level instrumentation failed high due to an apparent lightning strike.  This placed Unit 2 in Tech Spec 3.0.3 requiring Unit 2 to be in Mode 3 within 7 hours, Mode 4 within 13 hours, and Mode 5 within 37 hours.
| event text = Both channels 1 and 3 of the FWST (Refueling Water Storage Tank) level instrumentation failed high due to an apparent lightning strike.  This placed Unit 2 in Tech Spec 3.0.3 requiring Unit 2 to be in Mode 3 within 7 hours, Mode 4 within 13 hours, and Mode 5 within 37 hours.
The licensee will inform the NRC resident inspector.
The licensee will inform the NRC resident inspector.

Latest revision as of 21:25, 1 March 2018

ENS 40081 +/-
Where
Catawba Duke Energy icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+2.48 h0.103 days <br />0.0148 weeks <br />0.0034 months <br />)
Opened: Tom Poetzsch
14:22 Aug 16, 2003
NRC Officer: Steve Sandin
Last Updated: Aug 16, 2003
40081 - NRC Website
Loading map...