ENS 42971: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/08/2006 08:05 CST
| event date = 11/08/2006 08:05 CST
| last update date = 11/17/2006
| last update date = 11/17/2006
| title = Plant Computer Down For Upgrade
| title = Plant Computer Down for Upgrade
| event text = Farley Nuclear Plant is replacing the Unit 1 plant computer with an upgraded plant computer.  The total time that the plant computer may be down is a maximum of 10 days. The functions for emergency preparedness will be completed within the first 12 hours of the outage.  During that first 12 hours a contingency plan is in place to ensure that the TSC would have the required data if an emergency was declared.  A 5054Q was written for this and was reviewed by the Region 2 NRC EP staff prior to implementation.
| event text = Farley Nuclear Plant is replacing the Unit 1 plant computer with an upgraded plant computer.  The total time that the plant computer may be down is a maximum of 10 days. The functions for emergency preparedness will be completed within the first 12 hours of the outage.  During that first 12 hours a contingency plan is in place to ensure that the TSC would have the required data if an emergency was declared.  A 5054Q was written for this and was reviewed by the Region 2 NRC EP staff prior to implementation.
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.

Latest revision as of 22:17, 1 March 2018

ENS 42971 +/-
Where
Farley Southern Nuclear icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4.77 h-0.199 days <br />-0.0284 weeks <br />-0.00653 months <br />)
Opened: Bob Vanderbye
09:19 Nov 8, 2006
NRC Officer: John Knoke
Last Updated: Nov 17, 2006
42971 - NRC Website
Loading map...