ML17205A112: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301Operating Test Quality Checklist Form ES-301-3Facilitv:
{{#Wiki_filter:ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv:
PBNPDate of Examination:
PBNP Date of Examination:
Mav B - 19,2017Test Number: 2017L General Criterialnitialsab.c#a.ThesamoperatingtestconformswiththeprevrouslyapprovedoutlinchangesareconSIstentwithuirements 10cFRmdistributl4f\-{/b.There is no day{o-day repetition between this and other operating tests to be administered durithis examination
M av B - 19,2017 Test Number: 2017 L General Criteria lnitials a b.c#a.The sam ope rating test conforms with the prevrous ly a pproved outlin changes are con SI stent with uirements 1 0 c F R m distri butl 4 f\-{/b.There is no day{o-day repetition between this and other operating tests to be administered duri this examination
/rrThetest shall noticate items from theauditSection D.1.a.cálfr9/dOverlap with the written examination and between different parts of the operating test is withinlimits4TLre.It appears that the operating test will differentiate between competent and less-than-competent aicants at thenated license levelf\-r2. Walk-Thro h Criteriaa.Each JPM includes the following, as applicable:
/r r The test shall not icate items from the audit Section D.1.a.cál fr 9/d Overlap with the written examination and between different parts of the operating test is within limits 4 TL r e.It appears that the operating test will differentiate between competent and less-than-competent a icants at the nated license level f\-r 2. Walk-Thro h Criteria a.Each JPM includes the following, as applicable:
initial conditions initiating cuesreferences and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specificdesignation if deemed to be time-critical by the facilty licenseeoperationally imporlant specific performance criteria that include:detailed expected actions wth exact criteria and nomenclature system response and other examiner cuesstatements describing important observations to be made by the applicant criteria for successful completion of the taskidentification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable
initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facilty licensee operationally imporlant specific performance criteria that include: detailed expected actions wth exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable
,/-/b.Ensure that any changes from the previously approved systems and administrative walk{hrough outlines (Forms ES-301-1 and2) have not caused the test to deviatecriteria (e.9., item distribution, bank use, repetition from the last 2from any ofthe acceptance nations) specified Nonforms and Form ES-201-2./TL//3. Simulator CriteriaThe assocated simulator operating tests (scenario sets) have beenin accordance wth Form ES-301-4 and ais attached.
,/-/b.Ensure that any changes from the previously approved systems and administrative walk{hrough outlines (Forms ES-301-1 and2) have not caused the test to deviate criteria (e.9., item distribution, bank use, repetition from the last 2 from any of the acceptance nations) specified N on forms and Form ES-201-2./TL//3. Simulator Criteria The assocated simulator operating tests (scenario sets) have been in accordance wth Form ES-301-4 and a is attached.4 rL r e / Sign Date ,t/zx/t t a. Author b. Facility Reviewe(.)
4rLre / SignDate,t/zx/t ta. Authorb. Facility Reviewe(.)
: c. NRC Chief Examiner (#)üs\d. NRC Supervisor  
: c. NRC Chief Examiner  
,r*\.r"r T J¿sçc o4r s/t l').\-\¿ ) tl NOTE: . The faclity signature is not applicable for NRC-developed tests# lndependent NRC reviewer initial items in Column "c" chief examner concurrence red.}}
(#)üs\d. NRC Supervisor  
,r*\.r"r TJ¿sçco4rs/tl').\-\¿ ) tlNOTE: . The faclity signature is not applicable for NRC-developed tests# lndependent NRC reviewer initial items in Column "c"chief examner concurrence red.}}

Revision as of 18:49, 7 July 2018

2017 Point Beach Nuclear Plant Initial License Examination Form Es 301-3
ML17205A112
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/23/2017
From: Seymour J L
Operations Branch III
To:
NRC/RGN-III/DRS/OLB
Shared Package
ML16319A344 List:
References
Download: ML17205A112 (1)


Text

{{#Wiki_filter:ES-301 Operating Test Quality Checklist Form ES-301-3 Facilitv: PBNP Date of Examination: M av B - 19,2017 Test Number: 2017 L General Criteria lnitials a b.c#a.The sam ope rating test conforms with the prevrous ly a pproved outlin changes are con SI stent with uirements 1 0 c F R m distri butl 4 f\-{/b.There is no day{o-day repetition between this and other operating tests to be administered duri this examination /r r The test shall not icate items from the audit Section D.1.a.cál fr 9/d Overlap with the written examination and between different parts of the operating test is within limits 4 TL r e.It appears that the operating test will differentiate between competent and less-than-competent a icants at the nated license level f\-r 2. Walk-Thro h Criteria a.Each JPM includes the following, as applicable: initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facilty licensee operationally imporlant specific performance criteria that include: detailed expected actions wth exact criteria and nomenclature system response and other examiner cues statements describing important observations to be made by the applicant criteria for successful completion of the task identification of critical steps and their associated performance standards restrictions on the sequence of steps, if applicable ,/-/b.Ensure that any changes from the previously approved systems and administrative walk{hrough outlines (Forms ES-301-1 and2) have not caused the test to deviate criteria (e.9., item distribution, bank use, repetition from the last 2 from any of the acceptance nations) specified N on forms and Form ES-201-2./TL//3. Simulator Criteria The assocated simulator operating tests (scenario sets) have been in accordance wth Form ES-301-4 and a is attached.4 rL r e / Sign Date ,t/zx/t t a. Author b. Facility Reviewe(.)

c. NRC Chief Examiner (#)üs\d. NRC Supervisor

,r*\.r"r T J¿sçc o4r s/t l').\-\¿ ) tl NOTE: . The faclity signature is not applicable for NRC-developed tests# lndependent NRC reviewer initial items in Column "c" chief examner concurrence red.}}