=Text= | =Text= | ||
{{#Wiki_filter:NextEra Approach to Resolution of Tornado Missile Protection Point Beach Nuclear Plant Units 1 & 2 May 1, 2018 | {{#Wiki_filter:NextEra Approach to Resolution of Tornado Missile Protection Point Beach Nuclear Plant Units 1 & 2 May 1, 2018 2 AGENDA*Introductions | ||
*Current Status | *Current Status | ||
*Compensatory Measures | *Compensatory Measures | ||
*Resolution Strategy | *Resolution Strategy | ||
*Conclusion | *Conclusion 3 INTRODUCTIONS | ||
*NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager | *NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager | ||
-Eric Schultz, PB Licensing Manager | -Eric Schultz, PB Licensing Manager | ||
Line 26: | Line 26: | ||
*Background | *Background | ||
*Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping | *Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping | ||
*Extent of Condition (U1 & U2)-TDAFPs for unprotected turbine exhaust stacks-Main Steam Isolation Valves, Main Steam Safety Valves, Atmospheric Dump Valves-Emergency Diesel Generator (EDG) Fuel Oil Storage Tank T-175B*4Station implemented enforcement discretion guidance documentsEGM 15-002 and DSS-ISG-2016-01 | *Extent of Condition (U1 & U2)-TDAFPs for unprotected turbine exhaust stacks-Main Steam Isolation Valves, Main Steam Safety Valves, Atmospheric Dump Valves-Emergency Diesel Generator (EDG) Fuel Oil Storage Tank T-175B*4Station implemented enforcement discretion guidance documentsEGM 15-002 and DSS-ISG-2016-01 5 COMPENSATORY MEASURES | ||
*Immediate Compensatory Measures-Per DSS-ISG-2016-01 guidance | *Immediate Compensatory Measures-Per DSS-ISG-2016-01 guidance | ||
*Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing | *Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing | ||
*Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis) | *Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis) | ||
*5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event | *5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event 6 RESOLUTION STRATEGY | ||
*The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances | *The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances | ||
*Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2) | *Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2) | ||
*Selected Option -Site-specific High Winds PRA (RG 1.200, Rev. 2) | *Selected Option -Site-specific High Winds PRA (RG 1.200, Rev. 2) | ||
*6License Amendment Request will screen out tornado missile as a significant hazard for the site | *6License Amendment Request will screen out tornado missile as a significant hazard for the site 7 RESOLUTION STRATEGY | ||
*Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant | *Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant | ||
*7Site-specific High Winds PRA is peer-reviewed to ASME Standard and Regulatory Guide 1.200, Revision 2 | *7Site-specific High Winds PRA is peer-reviewed to ASME Standard and Regulatory Guide 1.200, Revision 2 8 CONCLUSION | ||
*Entered Enforcement Discretion Process per EGM 2015-002 | *Entered Enforcement Discretion Process per EGM 2015-002 | ||
*License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard | *License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard | ||
*Plan to submit LAR in second half of 2018 | *Plan to submit LAR in second half of 2018 | ||
*8License Amendment Request will screen out tornado missile as a significant hazard for the site}} | *8License Amendment Request will screen out tornado missile as a significant hazard for the site}} |
Revision as of 00:22, 6 July 2018
ML18108A015 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 05/01/2018 |
From: | Point Beach |
To: | Division of Operating Reactor Licensing |
Chawla M L, NRR/DORL/LPLIII, 415-8371 | |
References | |
Download: ML18108A015 (8) | |
Text
NextEra Approach to Resolution of Tornado Missile Protection Point Beach Nuclear Plant Units 1 & 2 May 1, 2018 2 AGENDA*Introductions
- Current Status
- Compensatory Measures
- Resolution Strategy
- Conclusion 3 INTRODUCTIONS
- NRC*NextEra Point Beach Team-Steve Catron, Fleet Licensing Manager-Anil Julka, Reliability & Risk Manager
-Eric Schultz, PB Licensing Manager
-Lori Christensen, PB Licensing Project Manager
- 3 4CURRENT STATUS
- Background
- Initial Nonconformance Declaration (U1 & U2)-Turbine Driven Auxiliary Feedwater Pumps (TDAFPs) for unprotected steam supply piping
- Extent of Condition (U1 & U2)-TDAFPs for unprotected turbine exhaust stacks-Main Steam Isolation Valves, Main Steam Safety Valves, Atmospheric Dump Valves-Emergency Diesel Generator (EDG) Fuel Oil Storage Tank T-175B*4Station implemented enforcement discretion guidance documentsEGM 15-002 and DSS-ISG-2016-01 5 COMPENSATORY MEASURES
- Immediate Compensatory Measures-Per DSS-ISG-2016-01 guidance
- Comprehensive Compensatory Measures-Procedurally controlled measures-FLEX equipment sharing
- Other Discernable Changes from Original Station Design-FLEX implementation-Station modifications (design basis and beyond design basis)
- 5Compensatory measures in place; original station design improved over time and enhanced ability to mitigate a tornado missile event 6 RESOLUTION STRATEGY
- The resolution strategy is to validate that Tornado Missile is not a significant hazard for the site-LAR submittal and approval will clear nonconformances
- Options Considered for LAR Development-TMRE (Point Beach was a pilot plant)-Site-specific High Winds PRA (RG 1.200, Rev. 2)
- Selected Option -Site-specific High Winds PRA (RG 1.200, Rev. 2)
- 6License Amendment Request will screen out tornado missile as a significant hazard for the site 7 RESOLUTION STRATEGY
- Site-specific High Winds PRA-Industry leader-Developed in 2013Updated to reflect as-built/as-operated plant
- 7Site-specific High Winds PRA is peer-reviewed to ASME Standard and Regulatory Guide 1.200, Revision 2 8 CONCLUSION
- Entered Enforcement Discretion Process per EGM 2015-002
- License Amendment Request submittal based on Site-Specific High Winds PRA-Site PRA concludes Tornado Missile is below the regulatory threshold in the Standard Review Plan and screens out as a significant hazard
- Plan to submit LAR in second half of 2018
- 8License Amendment Request will screen out tornado missile as a significant hazard for the site