Line 26: |
Line 26: |
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| Energy Northwest is herewith requesting the cancellation of Licensee Event Report No. 2016-005-00 submitted by referenced correspondence. Upon further evaluation of the event, Energy Northwest has concluded that neither the High Pressure Core Spray (HPCS) system nor the Primary Containment was made inoperable by the reported event. The technical bases for this assertion are as follows: (1) the magnitude of the reported leak in the HPCS Minimum Flow Line and the subsequent accumulation of water in the HPCS Room would not have impacted the capability of HPCS to fulfill any of its designated safety functions, had the system received a start signal for mitigation of an emergency during this event; and (2) the HPCS Minimum Flow return line discharge elevation in the Suppression Pool is located below Suppression Pool water level; therefore, submergence of the HPCS Minimum Flow Line discharge point would have prevented any gaseous flow from the Suppression Pool air space from reaching the location of the leaking flange. Although this condition indicated a degraded Primary Containment, the leakage did not result and would not have resulted in dose above limits or any other significant safety consequence. There are no commitments being made to the NRC by this letter. If you have any questions or require additional information, please contact Ms. D.M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792. | | Energy Northwest is herewith requesting the cancellation of Licensee Event Report No. 2016-005-00 submitted by referenced correspondence. Upon further evaluation of the event, Energy Northwest has concluded that neither the High Pressure Core Spray (HPCS) system nor the Primary Containment was made inoperable by the reported event. The technical bases for this assertion are as follows: (1) the magnitude of the reported leak in the HPCS Minimum Flow Line and the subsequent accumulation of water in the HPCS Room would not have impacted the capability of HPCS to fulfill any of its designated safety functions, had the system received a start signal for mitigation of an emergency during this event; and (2) the HPCS Minimum Flow return line discharge elevation in the Suppression Pool is located below Suppression Pool water level; therefore, submergence of the HPCS Minimum Flow Line discharge point would have prevented any gaseous flow from the Suppression Pool air space from reaching the location of the leaking flange. Although this condition indicated a degraded Primary Containment, the leakage did not result and would not have resulted in dose above limits or any other significant safety consequence. There are no commitments being made to the NRC by this letter. If you have any questions or require additional information, please contact Ms. D.M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792. |
| G02-17-088 Page 2 of 2 Executed this of May, 2017 Respectfully, W. G. Hettel Vice President, Operations cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident lnspector/988C CD Sonoda-BPA/1399 WA Horin -Winston & Strawn}} | | G02-17-088 Page 2 of 2 Executed this of May , 2017 Respectfully, W. G. Hettel Vice President, Operations cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident lnspector/988C CD Sonoda-BPA/1399 WA Horin -Winston & Strawn}} |
Revision as of 20:29, 7 July 2018
|
---|
Category:Letter
MONTHYEARIR 05000397/20240032024-11-12012 November 2024 Integrated Inspection Report 05000397/2024003 ML24298A2092024-11-0606 November 2024 – Alternative Requests 5IST-01 (RP01), 5IST-02 (RP02), and 5IST-03 (RP03) – Fifth Interval Inservice Testing Program ML24234A0292024-11-0505 November 2024 Environmental Assessment and Finding of No Significant Impact Related to License Amendment Request to Revise Emergency Plan (EPID L-2024-LLA-0011) - Letter GO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations GO2-24-100, Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing2024-11-0404 November 2024 Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information 2024-09-24
[Table view] |
Text
William G. Hettel Vice President, Operations P.O. Box 968, Mail Drop PE23 Richland, WA 99352-0968 Ph. 509-377-2425 F. 509-377-4674 wghettel@energy-northwest.com May 24, 2017 GO2-17-088 10 CFR 50.73 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397, CANCELLATION OF LICENSEE EVENT REPORT NO. 2016-005-00
Reference:
Letter GO2-17-047 from W. G. Hettel (Energy Northwest) to U.S Nuclear 50-397, Licensee Event Report No. 2016-005- 2017.
Dear Sir or Madam:
Energy Northwest is herewith requesting the cancellation of Licensee Event Report No. 2016-005-00 submitted by referenced correspondence. Upon further evaluation of the event, Energy Northwest has concluded that neither the High Pressure Core Spray (HPCS) system nor the Primary Containment was made inoperable by the reported event. The technical bases for this assertion are as follows: (1) the magnitude of the reported leak in the HPCS Minimum Flow Line and the subsequent accumulation of water in the HPCS Room would not have impacted the capability of HPCS to fulfill any of its designated safety functions, had the system received a start signal for mitigation of an emergency during this event; and (2) the HPCS Minimum Flow return line discharge elevation in the Suppression Pool is located below Suppression Pool water level; therefore, submergence of the HPCS Minimum Flow Line discharge point would have prevented any gaseous flow from the Suppression Pool air space from reaching the location of the leaking flange. Although this condition indicated a degraded Primary Containment, the leakage did not result and would not have resulted in dose above limits or any other significant safety consequence. There are no commitments being made to the NRC by this letter. If you have any questions or require additional information, please contact Ms. D.M. Wolfgramm, Regulatory Compliance Supervisor, at (509) 377-4792.
G02-17-088 Page 2 of 2 Executed this of May , 2017 Respectfully, W. G. Hettel Vice President, Operations cc: NRC Region IV Administrator NRC NRR Project Manager NRC Sr. Resident lnspector/988C CD Sonoda-BPA/1399 WA Horin -Winston & Strawn