| ==Dear Mr. Hanson:== | | ==Dear Mr. Hanson:== |
| By application dated February 10, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17045A006), Exelon Generation Company, LLC (EGC, the licensee), requested to adopt Technical Specifications Task Force (TSTF) Traveler (TSTF-542), "Reactor Pressure Vessel [RPV] Water Inventory Control [WIC]," Revision 2, which would change the technical specifications (TSs) for Dresden Nuclear Power Station, Units 2 and 3. TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML 16343B008). The proposed would replace the existing requirements in the TSs related to "operations with the potential to drain the reactor pressure vessel" with revised TSs providing an alternative for RPV WIC. These alternative requirements would protect Safety Limit 2.1.1.3, which requires RPV water level to be greater than the top of active fuel. During the NRC staff review it was determined that additional information is required to complete the staff's safety evaluation. The specific request for additional information (RAI) is addressed in the enclosure to this letter. On June 28, 2017, a draft set of these R.Als was emailed to Mr. Mitch Mathews of your staff for review. In a follow-up phone conversation with NRC staff on July 7, 2017, Mr. Mathews stated that EGC did not require any clarifications to the RAls. He agreed to provide the NRC with EGC's responses no later than August 7, 2017. The NRC staff considers that timely responses to the RAls ensures sufficient time is available for staff review and to contribute toward the NRC's goal of efficient and effective use of staff resources. | | By application dated February 10, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17045A006), Exelon Generation Company, LLC (EGC, the licensee), requested to adopt Technical Specifications Task Force (TSTF) Traveler (TSTF-542), "Reactor Pressure Vessel [RPV] Water Inventory Control [WIC]," Revision 2, which would change the technical specifications (TSs) for Dresden Nuclear Power Station, Units 2 and 3. TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML 16343B008). The proposed would replace the existing requirements in the TSs related to "operations with the potential to drain the reactor pressure vessel" with revised TSs providing an alternative for RPV WIC. These alternative requirements would protect Safety Limit 2.1.1.3, which requires RPV water level to be greater than the top of active fuel. During the NRC staff review it was determined that additional information is required to complete the staff's safety evaluation. The specific request for additional information (RAI) is addressed in the enclosure to this letter. On June 28, 2017, a draft set of these R.Als was emailed to Mr. Mitch Mathews of your staff for review. In a follow-up phone conversation with NRC staff on July 7, 2017, Mr. Mathews stated that EGC did not require any clarifications to the RAls. He agreed to provide the NRC with EGC's responses no later than August 7, 2017. The NRC staff considers that timely responses to the RAls ensures sufficient time is available for staff review and to contribute toward the NRC's goal of efficient and effective use of staff resources. |
| B. Hanson -2-If circumstances result in the need to revise the requested response contact me at (301) 415-1129, or by email at Russell.Haskell@nrc.gov. Docket Nos. 50-237 and 50-249 | | B. Hanson If circumstances result in the need to revise the requested response contact me at (301) 415-1129, or by email at Russell.Haskell@nrc.gov. Docket Nos. 50-237 and 50-249 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
Line 40: |
Line 40: |
|
| |
|
| ==Background:== | | ==Background:== |
| In Attachment 2 (of the submittal), the NRC staff identified a discrepancy. SR 3.8.2.1 (note 2) has not been revised to show the new title for LCO 3.5.2. Request: Please correct the proposed TS markup as appropriate. 2 | | In Attachment 2 (of the submittal), the NRC staff identified a discrepancy. SR 3.8.2.1 (note 2) has not been revised to show the new title for LCO 3.5.2. Request: Please correct the proposed TS markup as appropriate. 2 |
| -3-
| |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 -REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TECHNICAL SPECIFICATION TASK FORCE TRAVELER-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9295 AND MF9296) DATED: JULY 11, 2017. DISTRIBUTION: PUBLIC LPL3 R/F RidsNrrDorlLpl3 Resource RidsNrrPMDresden Resource RidsNrrLASRohrer Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No.: ML 17191A258 RidsRgn3MailCenter Resource RidsNRRDssStsb Resource RidsNRRDssSrxb Resource , RidsNRRDeEicb Resource RidsNrrDorlDpr Resource LWheeler, NRR OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC , DORL/LPL3/PM NAME RHaskell SRohrer DWrona RHaskell DATE 7/10/2017 7/10/2017 7/11/2017 7/11/2017 OFFICIAL RECORD COPY | | DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 -REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TECHNICAL SPECIFICATION TASK FORCE TRAVELER-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9295 AND MF9296) DATED: JULY 11, 2017. DISTRIBUTION: PUBLIC LPL3 R/F RidsNrrDorlLpl3 Resource RidsNrrPMDresden Resource RidsNrrLASRohrer Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No.: ML 17191A258 RidsRgn3MailCenter Resource RidsNRRDssStsb Resource RidsNRRDssSrxb Resource , RidsNRRDeEicb Resource RidsNrrDorlDpr Resource LWheeler, NRR OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC , DORL/LPL3/PM NAME RHaskell SRohrer DWrona RHaskell DATE 7/10/2017 7/10/2017 7/11/2017 7/11/2017 OFFICIAL RECORD COPY |
| }} | | }} |
Letter Sequence RAI |
---|
|
|
MONTHYEARRS-17-029, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-02-10010 February 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. Project stage: Request ML17076A0212017-03-16016 March 2017 NRR E-mail Capture - Acceptance Review - Dresden, Units 2 & 3 - License Amendment Request to Adopt TSTF-542 - OPDRVs (CAC Nos. MF9295/MF9296) Project stage: Acceptance Review ML17191A2582017-07-11011 July 2017 RAI Related to License Amendment Request to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler-542, Revision 2 (CAC NOS.MF9295 and MF9296) Project stage: RAI RS-17-086, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-07-13013 July 2017 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. Project stage: Supplement RS-17-173, Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-12-20020 December 2017 Supplement to Dresden Nuclear Power Station, Units 2 and 3 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Project stage: Supplement RS-17-174, Additional Supplement to Dresden Nuclear Power Station, Units 2 and 3 - Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-12-21021 December 2017 Additional Supplement to Dresden Nuclear Power Station, Units 2 and 3 - Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Project stage: Supplement ML17272A7832018-01-0808 January 2018 Issuance of Amendments to Adopt TSTF-542 TS Changes (CAC Nos. MF9295 and MF9296; EPID L-2017-LLA-0176) Project stage: Approval 2017-03-16
[Table View] |
|
---|
Category:Letter
MONTHYEARML24303A0712024-11-0404 November 2024 Letter to K. Meshigaud, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0692024-11-0101 November 2024 Letter to J.A. Crawford, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0302024-11-0101 November 2024 Letter to D.G. Lankford, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station RS-24-104, Nuclear Radiological Emergency Plan Document Revision2024-11-0101 November 2024 Nuclear Radiological Emergency Plan Document Revision ML24303A0492024-11-0101 November 2024 Letter G. Kakkak, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0552024-11-0101 November 2024 Letter to J. Keys, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station IR 05000237/20254012024-11-0101 November 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000237/2025401 05000249/2025401 ML24303A1462024-11-0101 November 2024 Letter to W. Gravelle, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0992024-11-0101 November 2024 Lett to R. Carter, Principal Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0242024-11-0101 November 2024 Letter to D. Kaskaske, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1422024-11-0101 November 2024 Letter to V. Jefferson, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0252024-11-0101 November 2024 Letter to R. Blanchard Tribal Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0272024-11-0101 November 2024 Letter to D. Rios, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0532024-11-0101 November 2024 Letter to J. Greendeer, President Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0432024-11-0101 November 2024 Letter to E. Elizondo, Sr. Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0512024-11-0101 November 2024 Letter to J. Barrett, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0472024-11-0101 November 2024 Letter to G. Cheatham, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0892024-11-0101 November 2024 Letter to M. J. Wesaw, Chair Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0152024-11-0101 November 2024 Letter to C. Harper, Chief Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1442024-11-0101 November 2024 Letter to V. Kitcheyna, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1342024-11-0101 November 2024 Letter to T. Carnes, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1102024-11-0101 November 2024 Letter to R. Gasco, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0132024-11-0101 November 2024 Letter to B. Barnes, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0202024-11-0101 November 2024 Letter to C. Chavers, Chairwoman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0172024-11-0101 November 2024 Letter to B. Peters, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0642024-11-0101 November 2024 Letter to J. Rupnick, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1352024-11-0101 November 2024 Letter to T. Rhodd, Chairperson Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A1172024-11-0101 November 2024 Letter to R. Yob, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24303A0602024-11-0101 November 2024 Letter to J. R. Shotton, Chairman Request to Initiate Section 106 Consultation for SLR of DNP Station ML24291A0202024-10-31031 October 2024 NRC Letter to J. Loichinger Achp Request for Comments Concerning the Environmental Review of DNPS Units 2 and 3 Subsequent License Renewal Application ML24291A0272024-10-31031 October 2024 NRC Letter to C. Mayer Illinois SHPO Request to Initiate Section 106 Consultation for Subsequent License Renewal of Units 2 and 3 IR 05000237/20240032024-10-29029 October 2024 Integrated Inspection Report 05000237/2024003 and 05000249/2024003 RS-24-102, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-5912024-10-21021 October 2024 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b, and TSTF-591 RS-24-103, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-10-21021 October 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-24-080, Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in .2024-10-16016 October 2024 Request to Replace Formerly Submitted Documents Available in the Agency Documents Access and Management System (ADAMS) with Documents Redacted in . RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24225A2132024-09-26026 September 2024 Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval ML24253A0942024-09-23023 September 2024 License Renewal Regulatory Audit Regarding the Environmental Review of the License Renewal Application (EPID L-2024-Sle-0002) (Docket Numbers: 50-237 and 50-249) SVPLTR 24-0030, ISFSI Annual Effluent Release Report2024-09-20020 September 2024 ISFSI Annual Effluent Release Report ML24270A0332024-09-20020 September 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000237/20244022024-09-19019 September 2024 – Security Baseline Inspection Report 05000237/2024402 and 05000249/2024402 - (Public) ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24215A2912024-08-14014 August 2024 Request for Withholding Information from Public Disclosure Alternative Schedule to Complete Decommissioning Beyond 60-Years of Permanent Cessation of Operations IR 05000237/20240022024-08-14014 August 2024 Integrated Inspection Report 05000237/2024002 and 05000249/2024002 IR 05000237/20240102024-08-0909 August 2024 NRC Age-Related Degradation Inspection Report 05000237/2024010 and 05000249/2024010 2024-09-06
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes ML24066A0872024-03-0404 March 2024 NRR E-mail Capture - Dresden 2 and 3 - Request for Additional Information for Alternative Request I5R-22 ML24067A1242024-03-0101 March 2024 Email to Christian Williams: Request for Additional Information Regarding Dresden Relief Request Dated February 23, 2024 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23052A0652023-02-21021 February 2023 NRR E-mail Capture - Dresden Units 2 and 3 - Request for Additional Information for Alternative Request RV-23H ML23037A9192023-02-0707 February 2023 Request for Information for the NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000237/2023011 and 05000249/2023011 ML23019A0132023-01-12012 January 2023 NRR E-mail Capture - Final RAI Dresden 2 and 3 - License Amendment Pertaining to GNF3 Fuel Transition ML22290A0842022-10-13013 October 2022 NRR E-mail Capture - Dresden 2 and 3 - RAI License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies ML22270A1032022-09-27027 September 2022 Notification of NRC Baseline Inspection and Request for Information (05000249/2022004) ML22203A0442022-07-21021 July 2022 Request for Additional Information (RAI) ML22199A2422022-07-13013 July 2022 NRR E-mail Capture - Draft RAI Dresden 2 and 3 Proposed Alternative Related to Sblc Nozzle Inspection for the Sixth Inservice Inspection Interval ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21244A4012021-08-10010 August 2021 (Final) Request for Information (RAI) Dresden, Units 1, 2, 3, and ISFSI Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50 Appendix E ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21097A2602021-04-0808 April 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21096A1752021-04-0606 April 2021 Notification of NRC Fire Protection Team Inspection Request for Information: Inspection Report 05000237/2021011; 05000249/2021011 ML21063A3202021-03-0202 March 2021 RAIs for Dresden, Units 2 and 3, Proposed Defueled Technical Specifications and Revised License Conditions for Permanently Defueled Condition (EPID L-2020-LLA-0239) (E-mail) ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML20337A4242020-12-0202 December 2020 Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000237/2021401 and 05000249/2021401 ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20231A7432020-08-18018 August 2020 Request for Additional Information (IOLB/HFT-RAI-1) Dresden MSIV LAR ML20224A3532020-08-11011 August 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000249/2020004 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20094H0292020-03-27027 March 2020 Final: Dresden, Units 2 & 3 LAR Request for Additional Information to Modify Technical Specifications to Main Steam Isolation Valve Leakage Requirements ML20071G2242020-03-11011 March 2020 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML19330E1772019-11-25025 November 2019 RAI Dresden/Clinton Request for LAR to Modify TSs Following Adoption of TSTF-542 ML19226A3712019-08-14014 August 2019 Ltr. 08/14/19 Dresden Nuclear Power Station, Unit 2 - Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2019004 (DRS-M.Domke) ML18330A2382018-11-21021 November 2018 Initial Information Request (Part 1) for the Upcoming Phase IV License Renewal Inspection; Inspection Report 05000237(249)/2019010; E-Mailed 11/21/18 (DRS-J.Corujo-Sandin) ML18067A1482018-03-0808 March 2018 Enclosurequest for Additional Information (Letter to P. R. Simpson Request for Additional Information Regarding Exelon Generating Company, Llc'S Decommissioning Funding Plan Update for Independent Spent Fuel Storage Installation) ML17353A9492018-01-0909 January 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise Technical Specification Requirements for Secondary Containment ML18002A4572017-12-22022 December 2017 NRR E-mail Capture - (External_Sender) (External) Dresden Nuclear Power Station, Units 2 and 3 - RAIs to Support Request to Revise TS 5.5.12 Primary Containment Leakage Rate Testing Program ML17360A0082017-12-22022 December 2017 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - RAIs to Support Request to Revise TS 5.5.12 Primary Containment Leakage Rate Testing Program ML17363A4422017-12-21021 December 2017 Supplemental Request for Information for 50.59 Inspection (DRS-A.Shaikh) ML17342A7372017-12-0808 December 2017 NRR E-mail Capture - Dresden Nuclear Power Station, Units 2 and 3 - Draft RAIs to Support Request to Revise TS 5.5.12 Primary Containment Leakage Rate Testing Program ML17191A2582017-07-11011 July 2017 RAI Related to License Amendment Request to Revise Technical Specifications to Adopt Technical Specification Task Force Traveler-542, Revision 2 (CAC NOS.MF9295 and MF9296) ML17159A6292017-06-0707 June 2017 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17062A4912017-03-0303 March 2017 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative to RPV Threads in Flange Examination (CAC Nos. MF8712-MF8729) ML16308A1002016-11-10010 November 2016 Request for Additional Information Regarding License Amendment Request to Revise Secondary Containment Access Opening Requirements (Cac. No. MF7325-MF7330) ML16208A0282016-07-25025 July 2016 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000249/2016004 (LAS) ML16172A1112016-06-29029 June 2016 Request for Additional Information Regarding License Amendment Request to Revise Secondary Containment Access Opening Requirements(Cac Nos.MF7325-MF7330) ML16153A2812016-06-0808 June 2016 Request for Additional Information Related to the License Amendment Request to Increase the Minimum Required Fuel Oil in Each Standby Diesel Generator Fuel Oil Day Tank (CAC Nos. MF7158 and MF7159) ML16071A2062016-03-15015 March 2016 RAI Regarding License Amendment Request to Revise the Reactor Steam Dome Pressure in Technical Specification 2.1.1, Reactor Core Sls(Cac Nos. MF6640 & MF6644) ML15329A2462016-01-19019 January 2016 Request for Additional Information Related to the License Amendment Request to Transition to Areva Fuel ML15232A6702015-09-29029 September 2015 Request for Additional Information Related to Dresden Units 2 and 3 License Amendment Request for Spent Fuel Storage Criticality Methodology 2024-05-21
[Table view] |
Text
Mr. Bryan C. Hanson Senior Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 11, 2017 Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO) Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 -REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TECHNICAL SPECIFICATION TASK FORCE TRAVELER-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9295 AND MF9296)
Dear Mr. Hanson:
By application dated February 10, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17045A006), Exelon Generation Company, LLC (EGC, the licensee), requested to adopt Technical Specifications Task Force (TSTF) Traveler (TSTF-542), "Reactor Pressure Vessel [RPV] Water Inventory Control [WIC]," Revision 2, which would change the technical specifications (TSs) for Dresden Nuclear Power Station, Units 2 and 3. TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML 16343B008). The proposed would replace the existing requirements in the TSs related to "operations with the potential to drain the reactor pressure vessel" with revised TSs providing an alternative for RPV WIC. These alternative requirements would protect Safety Limit 2.1.1.3, which requires RPV water level to be greater than the top of active fuel. During the NRC staff review it was determined that additional information is required to complete the staff's safety evaluation. The specific request for additional information (RAI) is addressed in the enclosure to this letter. On June 28, 2017, a draft set of these R.Als was emailed to Mr. Mitch Mathews of your staff for review. In a follow-up phone conversation with NRC staff on July 7, 2017, Mr. Mathews stated that EGC did not require any clarifications to the RAls. He agreed to provide the NRC with EGC's responses no later than August 7, 2017. The NRC staff considers that timely responses to the RAls ensures sufficient time is available for staff review and to contribute toward the NRC's goal of efficient and effective use of staff resources.
B. Hanson If circumstances result in the need to revise the requested response contact me at (301) 415-1129, or by email at Russell.Haskell@nrc.gov. Docket Nos. 50-237 and 50-249
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv Russell S. Haskell, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT APPLICATION TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TECHNICAL SPECIFICATION TASK FORCE TRAVELER-542. REVISION 2. "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" EXELON GENERATION COMPANY. LLC DRESDEN NUCLEAR POWER STATION -UNITS 2 AND 3 DOCKET NOS. 50-237 AND 50-249 By application dated February 10, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17045A006), Exelon Generation Company, LLC (EGC, the licensee), requested to adopt Technical Specifications Task Force (TSTF) Traveler (TSTF-542), "Reactor Pressure Vessel [RPV] Water Inventory Control [WIC]," Revision 2, which would change the technical specifications (TSs) for Dresden Nuclear Power Station, Units 2 and 3. TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML 16343B008). The proposed changes would replace the existing requirements in the TSs related to "operations with the potential to drain the reactor pressure vessel" with revised TSs providing an alternative for RPV WIC. These alternative requirements would protect Safety Limit 2.1.1.3, which requires RPV water level to be greater than the top of active fuel. The NRC staff has reviewed the information the licensee provided that supports the proposed amendment. The staff requests the licensee to address the following issues: DNPS-RAl-1:
Background:
In Attachment 2, pg. 3.5.2-1 (of the submittal), the staff identified a discrepancy in the limiting condition for operation (LCO) 3.5.2, Applicability proposed markup. The current TS LCO consists of text not shown in the proposed LCO markup as being deleted. Specifically, there is missing text associated with the MODE 5 exception (i.e., "except with the spent fuel storage pool gates removed and water level 23 ft. over the top of the reactor pressure vessel flange"). Request: Please correct the proposed TS markup as appropriate. Enclosure DNPS-RAl-2:
Background:
In Attachment 2, pg. 3.5.2-6 (of the submittal), the NRC staff identified a discrepancy. The current TS surveillance requirement (SR) consists of text not shown in the proposed SR markup as being deleted. Specifically, SR 3.5.2.4 is missing the operafing parameter data (i.e., System, Flow Rate, Pumps, Pressure), as per TSTF-542, Revision 2. Request: Please correct the proposed TS markup as appropriate. DNPS-RAl-3:
Background:
In Attachment 2, pg. 3.5.2-6 (of the submittal), the NRC staff identified a discrepancy. The current TS SR consists of text not shown in the proposed SR markup as being deleted. Specifically, SR 3.5.2.5 is missing from the proposed markup page. Request: Please correct the proposed TS markup as appropriate. DNPS-RAl-4:
Background:
In Attachment 2 (of the submittal), the NRC staff identified a discrepancy. SR 3.8.2.1 (note 2) has not been revised to show the new title for LCO 3.5.2. Request: Please correct the proposed TS markup as appropriate. 2
SUBJECT:
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 -REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TECHNICAL SPECIFICATION TASK FORCE TRAVELER-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9295 AND MF9296) DATED: JULY 11, 2017. DISTRIBUTION: PUBLIC LPL3 R/F RidsNrrDorlLpl3 Resource RidsNrrPMDresden Resource RidsNrrLASRohrer Resource RidsAcrsAcnw_MailCTR Resource ADAMS Accession No.: ML 17191A258 RidsRgn3MailCenter Resource RidsNRRDssStsb Resource RidsNRRDssSrxb Resource , RidsNRRDeEicb Resource RidsNrrDorlDpr Resource LWheeler, NRR OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC , DORL/LPL3/PM NAME RHaskell SRohrer DWrona RHaskell DATE 7/10/2017 7/10/2017 7/11/2017 7/11/2017 OFFICIAL RECORD COPY