ML12058A570: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Feintuch, KarlSent:Friday, February 24, 2012 4:13 PMTo:Fields, Leslie; Lain, Paul
{{#Wiki_filter:1 NRR-PMDAPEm Resource From:Feintuch, Karl Sent: Friday, February 24, 2012 4:13 PM To: Fields, Leslie; Lain, Paul


==Subject:==
==Subject:==
ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ETThe purpose of the meeting was to clarify selected items from a lists provided in a Request for Additional Information (RAI) email message dated January 31, 2012 (ADAMS Accession No. ML12031A112).
ME6818 record of Duane Arnold RAI Clarific ation Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET The purpose of the meeting was to clarify selected items from a lists provided in a Request for Additional Information (RAI) email message dated January 31, 2012 (ADAMS Accession No. ML12031A112).  
Attending the 2/22/2012 call for the NRC were: Name                          NRC/NRR affiliation Karl Feintuch              DORL/LPL3-1 Alayna Pearson          DRA/AFPB Dan O'Neal                            DRA/APLA Stephen Dinsmore      DRA/APLA Jay Robinson              DRA/AFPB Paul Lain                                DRA/AFPB Harry Barrett                          DRA/AFPB Bernard Litkett                        DRA/AFPB


Duane Arnold will provide a corresponding list of its attendees. The discussions centered on clarifying the needed information for specific RAI items and asking (by DAEC staff) for selected RAI item responses to be scheduled for 90 days, based on the planned scope of DAEC responses.
Attending the 2/22/2012 call for the NRC were: Name                          NRC/NRR affiliation Karl Feintuch              DORL/LPL3-1 Alayna Pearson          DRA/AFPB Dan O'Neal                            DRA/APLA
The NRC staff clarified: Fire Protection RAI 9 PRA RAI 2                  PRA RAI 3                  PRA RAI 12 PRA RAI 36                PRA RAI 60  
 
Stephen Dinsmore      DRA/APLA Jay Robinson              DRA/AFPB Paul Lain                                DRA/AFPB Harry Barrett                          DRA/AFPB Bernard Litkett                        DRA/AFPB
 
Duane Arnold will provide a corresponding list of its attendees.
The discussions centered on clarifying the needed information for specific RAI items and asking (by DAEC staff) for selected RAI item responses to be scheduled for 90 days, based on the planned scope of DAEC  
 
responses.
 
The NRC staff clarified:
Fire Protection RAI 9 PRA RAI 2                  PRA RAI 3                  PRA RAI 12 PRA RAI 36                PRA RAI 60  


Further, the NRC staff accepted the DAEC estimate that the following RAI items needed to be scheduled for 90 days. These items were originally scheduled for 60 days. Items PRA RAI 12 and 60  are in both the lists above and below.   
Further, the NRC staff accepted the DAEC estimate that the following RAI items needed to be scheduled for 90 days. These items were originally scheduled for 60 days. Items PRA RAI 12 and 60  are in both the lists above and below.   


Monitoring Program RAI 1 Safe Shutdown Analysis RAI 6          Safe Shutdown Analysis RAI 7 PRA RAI 6                  PRA RAI 12                PRA RAI 28                PRA RAI 35                PRA RAI 38                PRA RAI 43 PRA RAI 50                PRA RAI 60                PRA RAI 61 Fire Modeling RAI 1                            Fire Modeling RAI 2 Radioactive Release RAI 1                Radioactive Release RAI 2 Radioactive Release RAI 3 Fire Protection RAI 9 In a follow-up exchange of information between Karl Feintuch (NRC) and Browning and Swenzinski of Duane Arnold, we discussed a means of individualizing the delivery schedule of information to when it would be ready for transmittal and thus enable review work to start at the earliest practical time. For such scheduling purposes an itemized schedule of individual responses will be compiled. As an estimate, 100% of the RAI response should be available for review within May 2012, considering both the 60 and 90 day planning schedules.  
Monitoring Program RAI 1  
 
Safe Shutdown Analysis RAI 6          Safe Shutdown Analysis RAI 7 PRA RAI 6                  PRA RAI 12                PRA RAI 28                PRA RAI 35                PRA RAI 38                PRA RAI 43 PRA RAI 50                PRA RAI 60                PRA RAI 61 Fire Modeling RAI 1                            Fire Modeling RAI 2 Radioactive Release RAI 1                Radioactive Release RAI 2                
 
Radioactive Release RAI 3 Fire Protection RAI 9  
 
In a follow-up exchange of information between Karl Feintuch (NRC) and Browning and Swenzinski of Duane Arnold, we discussed a means of individualizing the delivery schedule of information to when it would be ready for transmittal and thus enable review work to start at the earliest practical time. For such scheduling purposes an itemized schedule of individual responses will be compiled. As an estimate, 100% of the RAI response should be available for review within May 2012, considering both the 60 and 90 day planning schedules.  


Karl Feintuch 2USNRC 301-415-3079  
Karl Feintuch 2USNRC 301-415-3079  


Hearing Identifier:  NRR_PMDA Email Number:  274  Mail Envelope Properties  (Karl.Feintuch@nrc.gov20120224161300)  
Hearing Identifier:  NRR_PMDA Email Number:  274  Mail Envelope Properties  (Karl.Feintuch@nrc.gov20120224161300)


==Subject:==
==Subject:==
ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET  Sent Date:  2/24/2012 4:13:03 PM  Received Date:  2/24/2012 4:13:00 PM From:    Feintuch, Karl Created By:  Karl.Feintuch@nrc.gov Recipients:    "Fields, Leslie" <Leslie.Fields@nrc.gov>  Tracking Status: None "Lain, Paul" <Paul.Lain@nrc.gov>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2515      2/24/2012 4:13:00 PM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:      
ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET  Sent Date:  2/24/2012 4:13:03 PM  Received Date:  2/24/2012 4:13:00 PM From:    Feintuch, Karl Created By:  Karl.Feintuch@nrc.gov Recipients:    "Fields, Leslie" <Leslie.Fields@nrc.gov>  Tracking Status: None "Lain, Paul" <Paul.Lain@nrc.gov>  Tracking Status: None Post Office:      Files    Size      Date & Time MESSAGE    2515      2/24/2012 4:13:00 PM
}}
 
Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:}}

Revision as of 06:51, 30 July 2018

2012/02/24 NRR E-mail Capture - ME6818 Record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET
ML12058A570
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/24/2012
From: Feintuch K
Plant Licensing Branch III
To: Fields L C, Laine P A
Office of Nuclear Reactor Regulation
References
TAC ME6818
Download: ML12058A570 (3)


Text

1 NRR-PMDAPEm Resource From:Feintuch, Karl Sent: Friday, February 24, 2012 4:13 PM To: Fields, Leslie; Lain, Paul

Subject:

ME6818 record of Duane Arnold RAI Clarific ation Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET The purpose of the meeting was to clarify selected items from a lists provided in a Request for Additional Information (RAI) email message dated January 31, 2012 (ADAMS Accession No. ML12031A112).

Attending the 2/22/2012 call for the NRC were: Name NRC/NRR affiliation Karl Feintuch DORL/LPL3-1 Alayna Pearson DRA/AFPB Dan O'Neal DRA/APLA

Stephen Dinsmore DRA/APLA Jay Robinson DRA/AFPB Paul Lain DRA/AFPB Harry Barrett DRA/AFPB Bernard Litkett DRA/AFPB

Duane Arnold will provide a corresponding list of its attendees.

The discussions centered on clarifying the needed information for specific RAI items and asking (by DAEC staff) for selected RAI item responses to be scheduled for 90 days, based on the planned scope of DAEC

responses.

The NRC staff clarified:

Fire Protection RAI 9 PRA RAI 2 PRA RAI 3 PRA RAI 12 PRA RAI 36 PRA RAI 60

Further, the NRC staff accepted the DAEC estimate that the following RAI items needed to be scheduled for 90 days. These items were originally scheduled for 60 days. Items PRA RAI 12 and 60 are in both the lists above and below.

Monitoring Program RAI 1

Safe Shutdown Analysis RAI 6 Safe Shutdown Analysis RAI 7 PRA RAI 6 PRA RAI 12 PRA RAI 28 PRA RAI 35 PRA RAI 38 PRA RAI 43 PRA RAI 50 PRA RAI 60 PRA RAI 61 Fire Modeling RAI 1 Fire Modeling RAI 2 Radioactive Release RAI 1 Radioactive Release RAI 2

Radioactive Release RAI 3 Fire Protection RAI 9

In a follow-up exchange of information between Karl Feintuch (NRC) and Browning and Swenzinski of Duane Arnold, we discussed a means of individualizing the delivery schedule of information to when it would be ready for transmittal and thus enable review work to start at the earliest practical time. For such scheduling purposes an itemized schedule of individual responses will be compiled. As an estimate, 100% of the RAI response should be available for review within May 2012, considering both the 60 and 90 day planning schedules.

Karl Feintuch 2USNRC 301-415-3079

Hearing Identifier: NRR_PMDA Email Number: 274 Mail Envelope Properties (Karl.Feintuch@nrc.gov20120224161300)

Subject:

ME6818 record of Duane Arnold RAI Clarification Call - Wednesday, February 22, 2012 2:15 PM-3:15 PM ET Sent Date: 2/24/2012 4:13:03 PM Received Date: 2/24/2012 4:13:00 PM From: Feintuch, Karl Created By: Karl.Feintuch@nrc.gov Recipients: "Fields, Leslie" <Leslie.Fields@nrc.gov> Tracking Status: None "Lain, Paul" <Paul.Lain@nrc.gov> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2515 2/24/2012 4:13:00 PM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: