ML24047A255: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:No: III-23-015                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     June 6, 2023
{{#Wiki_filter:No: III-23-015 June 6, 2023


==Contact:==
==Contact:==
Viktoria Mitlyng                                     , 630-829-9662 Prema Chandrathil                                                                                                                                                                     , 630-829-9663 NRC to Conduct Open House to Discuss 2022 Performance of Fermi Nuclear Plant
Viktoria Mitlyng, 630-829-9662 Prema Chandrathil, 630-829-9663 NRC to Conduct Open House to Discuss 2022 Performance of Fermi Nuclear Plant


Nuclear Regulatory Commission staff will discuss the 2022 safety performance of the Fermi nuclear power plant during an in-person open house                                                       scheduled for June 21. The plant, which is operated by DTE Electric Co., is located in Newport, Michigan, approximately 25 miles northeast of Toledo.
Nuclear Regulatory Commission staff will discuss the 2022 safety performance of the Fermi nuclear power plant during an in-person open house scheduled for June 21. The plant, which is operated by DTE Electric Co., is located in Newport, Michigan, approximately 25 miles northeast of Toledo.


The open house will be held from 5:30-6:30 p.m., Eastern time at the Monroe County Courthouse, 125 East Second Street, in Monroe. NRC staff responsible for plant inspection and oversight, including the resident inspectors based full-time at the site, will participate   in the discussion.
The open house will be held from 5:30-6:30 p.m., Eastern time at the Monroe County Courthouse, 125 East Second Street, in Monroe. NRC staff responsible for plant inspection and oversight, including the resident inspectors based full-time at the site, will participate in the discussion.


The NRC determined that Fermi operated safely during 2022. All inspection findings and performance indicators were green, or of very low safety significance. As a result, Fermi remains under the NRCs baseline level of oversight, which entails thousands of hours of inspection each year.
The NRC determined that Fermi operated safely during 2022. All inspection findings and performance indicators were green, or of very low safety significance. As a result, Fermi remains under the NRCs baseline level of oversight, which entails thousands of hours of inspection each year.
Line 31: Line 31:
Plant inspections are performed by two NRC resident inspectors and specialist inspectors from the agencys Region III office in Lisle, Ill.
Plant inspections are performed by two NRC resident inspectors and specialist inspectors from the agencys Region III office in Lisle, Ill.


The annual assessment letter           for Fermi is                       available on the           NRC website. Current performance information for the plant also is available on the NRC website and updated quarterly.}}
The annual assessment letter for Fermi is available on the NRC website. Current performance information for the plant also is available on the NRC website and updated quarterly.}}

Latest revision as of 14:11, 5 October 2024

News Release-III-23-015: NRC to Conduct Open House to Discuss 2022 Performance of Fermi Nuclear Plant
ML24047A255
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/06/2023
From:
Office of Public Affairs Region II
To:
References
News Release-III-23-015
Download: ML24047A255 (1)


Text

No: III-23-015 June 6, 2023

Contact:

Viktoria Mitlyng, 630-829-9662 Prema Chandrathil, 630-829-9663 NRC to Conduct Open House to Discuss 2022 Performance of Fermi Nuclear Plant

Nuclear Regulatory Commission staff will discuss the 2022 safety performance of the Fermi nuclear power plant during an in-person open house scheduled for June 21. The plant, which is operated by DTE Electric Co., is located in Newport, Michigan, approximately 25 miles northeast of Toledo.

The open house will be held from 5:30-6:30 p.m., Eastern time at the Monroe County Courthouse, 125 East Second Street, in Monroe. NRC staff responsible for plant inspection and oversight, including the resident inspectors based full-time at the site, will participate in the discussion.

The NRC determined that Fermi operated safely during 2022. All inspection findings and performance indicators were green, or of very low safety significance. As a result, Fermi remains under the NRCs baseline level of oversight, which entails thousands of hours of inspection each year.

The NRC Reactor Oversight Process uses color -coded inspection findings and indicators to measure plant performance. The colors start at green and increase to white, yellow or red, commensurate with the safety significance of the issues involved. Inspection findings or performance indicators with more than very low safety significance trigger increased NRC oversight.

Plant inspections are performed by two NRC resident inspectors and specialist inspectors from the agencys Region III office in Lisle, Ill.

The annual assessment letter for Fermi is available on the NRC website. Current performance information for the plant also is available on the NRC website and updated quarterly.