ENS 56645: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 9: Line 9:
| unit = 1
| unit = 1
| utype = W-4-LP
| utype = W-4-LP
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| cfr = 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A)
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 07/30/2023 18:20
| notification date = 07/30/2023 18:20

Latest revision as of 14:57, 4 January 2024

ENS 56645 +/-
Where
Seabrook NextEra Energy icon.png
New Hampshire (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.1 h-0.0458 days <br />-0.00655 weeks <br />-0.00151 months <br />)
Opened: Andrew Ferraioli
18:20 Jul 30, 2023
NRC Officer: Adam Koziol
Last Updated: Jul 30, 2023
56645 - NRC Website
Loading map...