| | title = Partially Withheld Insp Rept 50-285/87-06 on 870301-31 (Ref 10CFR73.21).Violation Noted:Failure to Maintain Log of Entries Into Vital Areas.Major Areas Inspected:Operational Safety Verifications & Security Observations | | | title = Ack Receipt of 870522 & 0721 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/87-06 |
| | author name = Boardman J, Harrell P, Hunnicutt D, Hunter D | | | author name = Gagliardo J |
| | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| | addressee name = | | | addressee name = Andrews R |
| | addressee affiliation = | | | addressee affiliation = OMAHA PUBLIC POWER DISTRICT |
| | docket = 05000285 | | | docket = 05000285 |
| | license number = | | | license number = |
| | contact person = | | | contact person = |
| | document report number = 50-285-87-06, 50-285-87-6, NUDOCS 8704290355 | | | document report number = NUDOCS 8708200017 |
| | package number = ML20209D745
| | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE |
| | document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS | | | page count = 2 |
| | page count = 13 | |
| }} | | }} |
|
| |
|
Line 19: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:. . | | {{#Wiki_filter:l q. , |
| APPENDIX B U. S. NUCLEAR REGULATORY COMMISSION
| | AUG 131987 |
| | , |
| | In Reply Refer To: |
| | Docket: 50-285/87-06 Omaha Public Power District ATTN: R. L. Andrews, Division Manager- , |
| | Nuclear Production |
| | - |
| | 1623 Harney Street Omaha, Nebraska 68102 Gentlemen: |
| | Thank you for your letters of May 22 and July 21, 1987, in response to our letters and Notice of Violation dated April 22 and June 19, 1987. We have reviewed.your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective |
| | , |
| | actions during a future inspection to determine that full compliance has been achieved and will be maintained. |
|
| |
|
| ==REGION IV==
| | Sincerely, Ocne 4 , |
| ,
| | J. 2. C N .;: .._ |
| NRC Inspection Report: 50-285/87-06 License: DPR-40 Docket: 50-285
| | J. E. Gagliardo, Chief Reactor Projects Branch cc: |
| ' Licensee: Omaha Public Power District s 1623 Harney Street Omaha, Nebraska 68102 Facility Name: Fort Calhoun Station Inspection At: Fort Calhoun Station, Blair, Nebraska Inspection Conducted: March 1-31, 1987 Inspector: . Y! /y/P7 P. H. Harrell, Senior Resident Reactor Date Inspector N
| | W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq. |
| ./R. Boardman,ReactorInspector, Date erations Section, Reactor Safety Branch Approved: N/
| |
| D. M. Hunnicutt, Chief, Operations Section,
| |
| / 'W87 D8te '
| |
| Reactor Safety Branch | |
| *
| |
| 8704290353 870422 **
| |
| PDR ADOCK 05000285 G PDR Ci M D. Y Hunter, Chief, Reactor Project ds/ar Date Section B, Reactor Projects Branch Inspection Summary Inspection Conducted March 1-31, 1987 (Report 50-285/87-06)
| |
| Areas Inspected: Routine, unannounced inspection including operational safety verifications, maintenance, surveillance, plant tours, safety related system walkdown, security observations, in-office review of periodic and special reports, preparation for refueling activities, refueling activities, review of ftEMOVAL OF THE PAGES MAPXED "SACEGUAPDS INFORM ATION'
| |
| DECONTROLS THE REMA!NDER OF THIS DOCUVEN . - .- .__ ._
| |
|
| |
|
| . . .. . _ _ _ . . . . . - .. . .
| | LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 (cc cont'd next page) i |
| '
| | ! |
| . , | | :FCS PI S RIV:EP M C:EP&Sh C: SP WLFi er PHHarrell/nc RPMullikin RACALDOELL LAYandt ; |
| i
| | 08/06/87 f/1/87 @/jo/87 / |
| | fr /7 /87 l RPB j C:RP ' |
| | f DRHu r JEGagi/afdo g @ /87 g/}3/8' Q l 0k 8708200017 870813 |
| | {DR ADOCK 05000285 PDR s\ |
|
| |
|
| i-l the welding program, containment local leak rate testing, and followup on
| | [: , |
| | | 8 5 Omaha Public Power District -2- .I |
| Generic Letter 83-28 (Salem ATWS event).
| |
| | |
| l -Results: Within the 12 areas inspected, 1 violation (failure to maintain a log i of entries into vital areas, paragraph 8) was identified.
| |
| | |
| .
| |
| i i
| |
| !
| |
| !
| |
| : | | : |
| i
| | Kansas Radiation Control Program Director Nebraska Radiation Control Program Director ! |
| | | bec to DMB (IE04) |
| a i
| | bec distrib. by RIV: j RPB RRI R. D. Martin, RA l R&SPB SectionChief(RP8/B) MIS System |
| l
| |
| . | |
| i
| |
| , | |
| , | | , |
| | RIV File DRSP RSTS Operator i RSB Project Inspector D. Weiss, RM/ALF |
| | , R. Hall |
| ! | | ! |
| !
| | , |
| !
| | j l |
| !
| | |
| , | | I |
| i
| | _ _ _ _ _ _ _ _ _ _ _ |
| :
| |
| i
| |
| :
| |
| !
| |
| !
| |
| REMOVAL OF THE PAGES 5.1 ARMED "SAEEGiJAFDS INFOnM ATi?!"
| |
| DECONTROLS THE REMA!flO5R OF THis DOCOVD4 4.
| |
|
| |
|
| l. | | - |
| | -_ |
| | - _._ _ _ _ . . _ _ . R l |
| | . . < |
| | ! |
| | SARCl!/.ES liHORMAll0N 1 |
| | { |
| | Yi L |
| | Omaha Public Power District ! |
| | 1623 Hamey Omaha. Nebraska 68102 2247 ( |
| | 402/536 4000 i May 22, 1987 LIC-87-357 I ENCLOSURE (S) CONTAIN(S) |
| | SATEGUARDS INFORMATION. |
|
| |
|
| L
| | DECONTROL. LED WHEN l |
| | , |
| | SEPARATED FROM ATTACHMENT (S) J |
| ! | | ! |
| . - - . . __ . _ . _ . _ _ _ . _ _ _ . . . . _ _ _ _ _ . _ _ _ . - . _ . _ _ _ _ . _ . . _ _ . _ _ _ _ . . - - _ _ _ _ _ ,
| | Mr. J. E. Gagliardo, Chief Reactor Projects Branch U. S. Nuclear Regulatory Commission 3%hT/$1 L |
| | ' ~ |
| | Region Iv t |
| | 611 Ryan Plaza Drive, Suite 1000 MAY M P |
| | \, |
| | . |
| | Arlington, TX 76011 |
| | . |
| | L, p References: 1. Docket No. 50-285 [- ._.._* |
| | - |
| | 2. |
| | |
| | Letter NRC (J. E. Gagliardo) to OPPD (R. L. Andrews) dated ~l |
| | ' April 22,1987 (IER 50-285/87-06) 1 |
|
| |
|
| . | | ==Dear Mr. Gagliardo:== |
| | I i SUBJECT: Inspection Report 87-06 l |
| | The subject inspection report identified one violation concerning a security matter. |
|
| |
|
| DETAILS Persons Contacted
| | Pursuant to the provisions of 10 CFR 2.201, please find attached the Omaha Public Power District's response to this' violation. |
| #*R. Andrews, Division Manager-Nuclear Production
| |
| #*W. Gates, Plant Manager C. Brunnert, Supervisor-0perations Quality Assurance M. Core, Supervisor-Maintenance T. Dexter, Supervisor-Security
| |
| #*J. Fisicaro, Supervisor-Nuclear Regulatory and Industry Affairs J. Foley, Supervisor-I&C and Electrical Field Maintenance
| |
| #J. Gasper, Manager-Administrative and Training Services
| |
| #*R. Jaworski, Section Manager-Technical Services M. Kallman, Supervisor-Security L. Kusek, Supervisor-0perations
| |
| #*D. Munderloh, Plant Licensing Engineer T. McIvor, Supervisor-Technical
| |
| *K. Morris, Division Manager-Quality Assurance and Regulatory Affairs R. Mueller, Plant Engineer
| |
| *A. Richard, Manager-Quality Assurance G. Roach, Supervisor-Chemical and Radiation Protection J. Kecy, Acting Reactor Engineer
| |
| * Willrett, Supervisor-Administrative Services and Security
| |
| * Denotes attendance at the monthly exit interview held on April 3, 198 # Denotes attendance at a meeting held by J. Boardman on March 20, 198 (see paragraph 15)
| |
| The inspector also contacted other plant personnel, including operators, technicians, and administrative personne . Followup on Previously Identified Items (Closed) Open Item 285/8bO3-03: Establishment of an inspection program for type-86 lockout relay The licensee performed a review, in accordance with IE Bulletin 84-02 commitments, to establish a program for inspection of type-86 relays. The review performed by the licensee's engineering staff recommended that an inspection program be established by plant personnel for inspection of type-86 relays. The licensee's plant staff disagreed with the engineering staff's recommendation in that an additional inspection program was not required. The licensee's plant staff determined that an acceptable program existed through the use of the established surveillance test program. Based on a review performed by the licensee's plant staff, it was verified that each relay was tested on a monthly basis by the performance of system surveillance tests. The plant staff also noted during the review that redundant relays existed for each safety-related signal processe HEMOVAL or ng ryneq . 7 ~
| |
| . s p g m, n y
| |
| ~' '
| |
| DECONm0LGh) _
| |
| a 55,
| |
|
| |
|
| . .
| | The details of this response are deemed Safeguards Information in accordance with 10 CFR 73.21. As such, this document should not be placed in the Public Document Room. |
|
| |
|
| .
| | If you have contact us. any questions concerning this matter, please do not hesitate to |
| The NRC inspector reviewed a selected sample of relays to verify that a surveillance test was performed to verify proper relay operation. No problems were noted during the revie . Operational Safety Verifications The NRC inspector conducted reviews and observations of selected activities to verify that facility operations were performed in confomance with the requirements established under 10 CFR, administrative procedures, and the Technical Specifications (TS). The NRC inspector made several control room observations to verify:
| |
| . Proper shift staffing
| |
| . Operator adherence to approved procedures and TS requirements
| |
| . Operability of reactor protective system and engineered safeguards equipment
| |
| . Logs, records, recorder traces, annunciators, panel indications, and switch positions complied with the appropriate requirements
| |
| . Proper return to service of components
| |
| . Maintenance orders (MO) initiated for equipment in need of maintenance
| |
| . Appropriate conduct of control room and other licensed operators During a control room tour at approximately 11:00 a.m. on March 9,1987, the NRC inspector noted that the licensee had taken the 480-volt electrical distribution bus, MCC 3A2, out of service at 7:00 a.m. to perform preventive maintenance activities. By removing the MCC from service with the reactor coolant temperature greater than 300 degrees, the licensee had entered a TS limiting condition for operation (LCO). The LC0 of TS 2.7(2)f requires that the licensee place MCC 3A2 back in service within 8' hours or enter an
| |
| ,
| |
| action statement that required the plant to be placed in a cold shutdown condition within the following 60 hours. The licensee placed MCC 3A2 back in service at 2:42 p.m. and exited the TS LC During discussions with operations personnel, the NRC inspector detemined that licensee personnel were not aware that taking MCC 3A2 out of service caused the plant to be placed in an LC0. Upon notification by the NRC inspector, actions were taken by the licensee to ensure the MCC was returned to service as soon as possible. Management personnel stated that the failure to recognize the plant was in an LCO was an inadvertent oversight by operations personnel. This occurrence was discussed by plant management with operations personnel to increase their awareness level of the need to verify that plant conditions do not cause an unknown entry into an LCO. In addition, the outage planning data base was updated by REMOVAL OF THE PAGCS MARXEO "SAFEGUAP_CS INFORMATION[
| |
| DECONTROLS THE REMAINDER 0;: THis 000UMF.H _ . - - - - ., - - _ _ _ , - ._. ._ __ .
| |
|
| |
|
| .
| | Sincerely, AW R. L. Andrews Division Manager Nuclear Production RLA/me Attachment c: LeBoeuf, Lamb, Leiby & MacRae w/o Attachment |
| . .
| |
|
| |
|
| the licensee to ensure that no MCCs were removed from service during future outages when the reactor coolant temperature was above 300 degree No violations or deviations were identifie . Plant Tours The NRC inspector conducted plant tours at various times to assess plant and equipment conditions. The following items were observed during the tours:
| | . |
| . General plant conditions
| | R. D. Martin, NRC Regional Administrator w/o Attachment |
| . Equipment conditions, including fluid leaks and excessive vibration
| | 'g W. A. Paulson, NRC Project Managerw/o Attachment P. H. Harrell, NRC Senior Resident Inspector w/o Attachment xv a smaanmunev &, |
| <
| | . - . . . |
| . Plant housekeeping and cleanliness practices including fire hazards and control of combustible material | | ' |
| . Adherence to the requirements of radiation work permits
| | .--...............-... |
| . Work activities performance in accordance with approved procedures During tours of the plant, the NRC resident inspector noted the following items:
| | _ _ _ _ _ - _ _ _ - - - - - |
| . An individual was entering the containment building with a respirator; however, the individual's security badge indicated that
| |
| ,
| |
| he was not qualified to wear a respirator. The licensee places a white dot on the security badge to indicate that an individual is qualified for respirator use. In this case, the individual with the respirator did not have a white dot on his security badge.
| |
|
| |
|
| ;
| | l I |
| The NRC inspector called the apparent problem to the attention of the
| | < . , , 'j |
| ; security guard stationed at the containment access door. The security guard stopped the individual from entering containment and determined that the individual intended to use the respirator. The individual explained that he was respirator qualified and that when his badge was issued, the white dot was inadvertently left off. The security guard checked with the individual responsible for respirator qualification and detennined that the individual attempting to enter containment was not respirator qualified. The security guard instructed the individual to leave the area immediatel In discussions with the licensee, management personnel stated that they felt the general employee training program was adequate to i ensure that unqualified personnel did not use respirator Management personnel stated that they felt that the problem discussed above was a problem with a particular individual. This conclusion was based on the fact that no other instances of this type had been reported during the current refueling outage. The individual involved was provided individualized instruction in what
| |
| :
| |
| REMOVAL OF THE PACUS f/ "*T"GD "SVEGUAPCS INFORMATION'
| |
| OECONTROLS THE RE'/ AliMjl GF THIS DOCUf/ENT,
| |
|
| |
|
| . | | . |
| | | --=~_======r=======--- - - - - = = = = = = . = = = = - = = = |
| qualifications were required for him to be allowed to wear a respirato . Fire Doors 989-11 and 1011-1 were found not to be functioning properly in that the doors wouldn't always close. By not closing, the fire barriers associated with the doors became nonfunctiona Upon notification by the NRC inspector, the licensee repaired the door During a tour of containment on March 27, 1987, the plant manager and maintenance supervisor found a contract quality control (QC) inspector sleeping. The QC inspector was performing tool accountability activities, but no work was in progress at the time of the discovery. The contract QC inspector was terminated shortly thereafter. The NRC inspector discussed the incident with the chemistry and radiation protection (CARP) supervisor '
| | ^ |
| to verify that health physics (HP) technicians were aware of.their responsibility of ensuring individuals did not sleep in radiation area The CARP supervisor stated that the HP technicians were aware of their responsibility. The plant manager discussed the incident with all plant supervisors and stressed that any individual caught sleeping on duty would be discipline No violations or deviations were identifie . Safety-Related System Walkdown The NRC inspector walked down accessible portions of the following safety-related system to verify system operability. Operability was determined by verification of selected valve and switch positions. The system was walked down using the drawing and procedure noted:
| | .:=: - |
| . Shutdown cooling system (Procedure 01-SC-1, Revision 24, and Drawing E-23866-210-130, Revision 38)
| | _ _ . . _ _ _ _ . - - _ _ - . _ _ . |
| During the walkdown, the NRC inspector noted minor discrepancies of an editorial nature between the drawing, procedure, and plant as-built conditions for the selected areas checked. None of the conditions noted affected the operability or safe operation of the syste Licensee personnel stated that the noted minor discrepancies would be correcte No violations or deviations were identifie . Monthly Maintenance Observations The NRC inspector reviewed and/or observed selected station maintenance activities on safety-related systems and components to verify the maintenance was conducted in accordance with approved procedures, regulatory requirements, and the TS. The following items were considered j during the reviews and/or observations:
| | Omaha Public Power District i 1623 Harney Omaha. Nebraska 68102 _ ,. |
| l . The TS limiting conditions for operation were met while systems or i components were removed from service nEMOVAL OF THE F AW ' '' ,7'i ' - Dbb 1 L
| | - |
| CECONTROW WET- 1' '' E
| | ggggg |
| '
| |
| . - ~ - _ . . , -- __ . - - . . - -
| |
| . _ _ - - - -
| |
| -_ _ _ , - . - -. -- _-- ._.,- - __
| |
| | |
| . . | |
| | |
| . Approvals were obtained prior to initiating the work
| |
| . Activities were accomplished using approved M0s and were inspected, as applicable
| |
| . Functional testing and/or calibrations were performed prior to returning components or systems to service
| |
| . Quality control records were maintained
| |
| . Activities were accomplished by qualified personnel
| |
| . Parts and materials used were properly certified
| |
| . Radiological and fire prevention controls were implemented The NRC inspector reviewed and/or observed the following maintenance activities:
| |
| . Rebuilding of main steam safety valves (M0 870946)
| |
| . Replacement of insulation on 4160-volt buses (M0 863672)
| |
| . Change out of sleeve bearings on electrical breakers (M0 845331)
| |
| . Repair of a battery charger (M0 817548)
| |
| . Replacement of a bonnet gasket on a safety injection valve (M0 858023)
| |
| No violations or deviations were identifie . Monthly Surveillance Observations The NRC inspector observed selected portions of the performance of and/or reviewed completed documentation for the TS required surveillance testing on safety-related systems and components. The NRC inspector verified the following items during the testing:
| |
| . Testing was performed by qualified personnel using approved procedures
| |
| . Test instrumentation was calibrated
| |
| . The TS limiting conditions for operation were met
| |
| . Removal and restoration of the affected system and/or component were accomplished
| |
| . Test results conformed with TS and procedure requirements REMOVAL OF THE PAGES f>ARKED "SAFEGUA RDS INFORMATION*
| |
| DECONTROLS THE REMAINDER OF THIS DOCUMEN .
| |
| | |
| . Test results were reviewed by personnel other than the individual directing the test
| |
| . Deficiencies identified during the testing were properly reviewed and resolved by appropriate management personnel The NRC inspector observed and/or reviewed the documentation for the following surveillance test activities. The procedures used for the test activities are noted in parenthesi . Channel B safety injection actuation signal test (ST-ESF-2-F.2)
| |
| . Auxiliary feedwater pump monthly cieck (ST-FW-1-F.2)
| |
| . Exercising of ventilation air valves (ISI-VA-1-F.1)
| |
| . Calibration of containment pressure switch (CP-D/765)
| |
| No violations or deviations were identifie . Security Observations The NRC inspector verified the physical security plan was being implemented by selected observation of the following items:
| |
| . The security organization was properly manned
| |
| . Persor.nel within the protected area (PA) displayed their identification badges
| |
| . Vehicles were properly authorized, searched, and escorted or controlled within the PA
| |
| . Persons and packages were properly cleared and checked before entry into the PA was permitted
| |
| . The effectiveness of the security program was maintained when security equipment failure or impairment required compensatory measures to be employed During this inspection, the NRC inspector noted that the licensee had not established a program for maintaining a log for persons entering vital areas not equipped with security badge card readers. The discussion of this apparent violation contains safeguards information, as defined in 10 CFR Part 73.21; therefore, the details of this apparent violation are provided in Appendix A and the Attachment to this inspection repor . In-Office Review of Periodic and Special Reports In-office review of periodic and special reports was performed by the NRC resident inspector and/or the Fort Calhoun project inspector to verify the following, as appropriate:
| |
| FIEMOVAL OF TME P?,GES f '?SKED "S A FEGUA PDS INFOPM ATE DECONTROLS THE UN"dNDER OF THis DOCUV.;
| |
| | |
| . .
| |
| :
| |
| . Reports included the information required by appropriate NRC requirements
| |
| . Test results and supporting information were consistent with desig predictions and specifications
| |
| . Determination that planned corrective actions were adequate for resolution of identified problems
| |
| . Detennination as to whether any information contained in the report should be classified as an abnormal occurrence The following reports were reviewed:
| |
| . Monthly operations report for February 1987
| |
| . Core reload methodology changes for Cycle 11, dated March 18, 1987
| |
| . Amendment for a change to the TS related to testing of the emergency diesel generators, dated March 13, 1987
| |
| . Notification of raising the current cold leg temperature, dated March 11, 1987
| |
| . Revised schedule and justification for replacement of Valcor valves, dated March 4, 1987 No violations or deviations were identifie . Preparation for Refueling The NRC inspector reviewed selected procedures to verify that the technical and administrative requirements provided in the procedures adequately incorporated controls and requirements stated in the TS, codes, and standards. The procedures reviewed were evaluated to verify that controls had been established for the following elements:
| |
| . Receipt, inspection, and storage of new fuel and control element assemblies (CEA)
| |
| . Fuel handling, transfer, and core verification
| |
| . Inspection of irradiated fuel
| |
| . Preoperational checkout of refueling equipment
| |
| . Handling and movement of the reactor core internals
| |
| . Establishment of administrative measures for the activities such as lines of supervision, shif t manning, radiation monitoring, comunications, and training RFMOVM ^ r 1:rgr ', n- -
| |
| _ | | _ |
| , yr y . *
| | 402/536 4000 |
| CECON.a" >. '
| | ' |
| .:t' . + occuwuj,
| | l [ . |
| | July 21, 1987 JUL 2 41987 ,'O LIC-87-523 'g |
| | ' |
| | ." |
|
| |
|
| . . | | _..J |
| | ] |
| | Mr. J. E. Gagliardo, Chief { |
| | Reactor Projects Branch V. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 References: 1. Docket No. 50-285 . |
| | 2. Letter NRC (J. E. Gagliardo) to OPPD (R. L. Andrews) dated April 22, 1987 (IER 50-285/87-06) l 3. Letter OPPD (R. L. Andrews) to NRC (J. E. Gagliardo) dated May 22, 1987 (LIC-87-357) |
| | 4. Letter NRC (J. E. Gagliardo)'to OPPD (R. L. Andrews) dated June 19, 1987 (IER 50-285/87-06) -1 l |
|
| |
|
| The NRC inspector reviewed the following procedures for the elements listed abov Number Title Revision SP-CEA-3 Procedure for CEA 3 Unloading, Inspection, and Storage of Individual CEAs OP-11 Reactor Core Refueling 18 Procedure SP-FE-1 Visual Inspection of 4 Irradiated Fuel HP-FH-2 Refueling Equipment 10 Preoperational Maintenance MP-ilE-1 Polar Crane Annually or 7 at Refueling Inspection HP-RC-7-2-A Upper Guide Structure 20 and ICI Plate Removal SP-flFR-1 Fuel Receipt Procedure 11 The i4RC inspector witnessed activities related to the receipt, inspection, and storage of new fuel and CEAs. The inspector verified that the inspections were performed in accordance with the requirements established by Procedures SP-NFR-1 and SP-CEA-3. The selected verifications performed by the inspector included determination that the personnel performing the inspections were qualified, documentation was accurately completed, and the fuel and CEAs were properly handled. Based on the observations and reviews perfonred by the NRC inspector, it appeared that the fuel and CEAs were inspected and handled appropriatel The NRC inspector also observed and/or reviewed completed documentation of other selected portions of preparation for refueling activities. The activities included fuel handling equipment and crane operational verification, proper operation of radiation monitors, and verification that the source range monitors operated properl Prior to contencement of outage activities, the licensee issued a refueling cutage manual. This manual provided a single reference source for the various activities related to the outage. The information provided in the manual included a description of the outage organization and responsibilities; time, place, and subject of the various outage meetings; administrative information; and a discussion of how to properly perform activities that have been previously identified as problem area No violations or deviations were identifie REMOVAL OF THE PAGES MARKED " SAFEGUARDS INFORMATICt"l DECONTROLS THE REMAINDER OF THIS DOCUMGNL
| | ==Dear Mr. Gagliardo:== |
| | SUBJECT: Additional Information for Inspection Report 285/87-06 Omaha Public Power District recently received Reference 4 requesting |
| | , supplemental information to that provided in Reference.3. Accordingly, please find attached additional information concerning Inspection Report 285/87-06. |
|
| |
|
| . .
| | Sincerely, i |
| | l R. L. Andrews /d) |
| | ' |
| | Division Manager Nuclear Production RLA:rge Attachment c: LeBoeuf, Lamb, Leiby & MacRae I 1333 New Hampshire Ave., N.W. ! |
| | Washington, DC 20036 ) |
| | P. H. Harrell, NRC Senior Resident Inspector li J7 4g!o= |
| | y j'', |
| | , |
| | R. D. Martin, Regional Administrator , |
| | l Qw ,TV 455t24 Emplograen th EQtt Opportunity /l ! |
|
| |
|
| 11. Review of Welding Program During this inspection period, the NRC resident inspector assisted an NRC welding specialist from Region IV in a detailed review of the licensee's welding program. During the review, a violation of the failure to properly control special prccesses was identified. The results of the program review are provided in NRC Inspection Report 50-285/87-0 '
| | l |
| 12. Followup on Generic Letter 83-28 Generic Letter (GL) 83-28 was issued by the NRC to require licensees to implement corrective actions based on the Salem ATWS event. This portion of the inspection was performed to verify that the licensee had properly implerented a program for post-trip reviews. The requirements for post-trip reviews are provided in GL 83-28 as Items 1.1 and The NRC Office of Nuclear Reactor Regulation (NRR) performed a review of the documentation submitted by the licensee in response to the requirements of GL 83-28. Based on the review, NRR issued a safety evaluation report (SER) on October 22, 1985, for Item 1.1 and on June 13, 1985, for Item 1.2. The SERs issued by NRR concluded that the licensee's post-trip review data and information capabilities were acceptable. The NRC inspector performed a review to verify that the licensee had implemented a program for post-trip review as stated in the SERs. The program implementation was verified by review of the documentation listed belo . A sequence-of-events computer printout to verify that the types of parameters available during post-trip reviews included the items required by the SER
| | ' |
| .
| | . , ,. |
| Procedure OP-1 "liaster Checklist for Startup or Trip Recovery," to verify that post-trip review and permission for restart responsibilities were clearly defined
| | l l |
| . Post-trip review packages compiled during past reactor trips to verify that the appropriate documentation (e.g., completed startup procedures, sequence-of-events printouts, instrument recorder tracings and strip charts, etc.) was available Based on the review performed by the NRC inspector, it appears that the licensee has implemented an adequate post-trip review program. Items and 1.2 of GL 83-28 are considered close No violations or deviations were identifie . Refueling Activities
| | Attachment |
| :
| | ~ |
| The NRC inspector reviewed / observed various activities performed during
| | a. During the performance of the inspection, it was established that the violation occurred, in part, due to the security supervisor not responding i |
| | ; |
| ' | | ' |
| refueling to verify the activities were performed in accordance with the REMOVAL OF THE PAGFS MAT:KUD $^ FFGU AqDS INFOAMATION '
| | to concerns identified by NRC personnel. This was not discussed in your ' |
| l OECONTROLS THP : ,, ;imE:4 OF THIS DOCUMEN _ _-
| | response to the reason for the violation. It is requested that you provide a response to this aspect of the violation, i |
| | | RESPONE The reason for the violation was that the Supervisor-Security did not take ! |
| - _ _-- - - -- .. - - . . . - . . -
| | appropriate action on the resident NRC inspector's concern about logging into vital areas with no card reader. His interpretation of the site security plan was that it adequately addressed logging into areas which is accomplished by the computer. He believed that OPPD was in compliance. |
| l . .
| |
| .
| |
| '
| |
| !
| |
| '
| |
| *
| |
| | |
| I TS and approved licensee procedures. The activities observed / reviewed included the following:
| |
| i . Proper shift staffing by qualified individuals was provided
| |
| . Containment integrity was established and maintained
| |
| ,
| |
| . Good housekeeping and loose object control on the refueling bridge
| |
| '
| |
| t was maintained
| |
| ; . Fuel handling operations were perfonned in accordance with approved licensee procedures
| |
| !
| |
| ! . The proper refueling cavity water level was maintained t
| |
| ~
| |
| . Chemistry sampling was perfonned at the frequency specified in the TS i
| |
| l During observation / review of the above activities, no problems were noted j by the NRC inspector. During this inspection period, the licensee i offloaded all fuel assemblies into the spent fuel pool to check for fuel
| |
| {
| |
| integrity. The fuel integrity checks were made due to an increase in the l
| |
| iodine level in the reactor coolant system during the past fuel cycle.
| |
| | |
| Any fuel assemblies that were found to be leaking will not be returned to i the core, but will be replaced with a nonleaking assembly. This inspection of refueling activities will continue into the next inspection period.
| |
|
| |
|
| . | | He was approached a second time about the discrepancy and responded by requiring a manual log be kept, but only at rollup doors without card readers. He did not address inoperative card readers or other vital area i doors without card readers. |
| No violations or deviations were identified.
| |
|
| |
|
| I i 14. Containment Local Leak Rate Testing
| |
| ! | | ! |
| l The NRC inspector verified through observation and records review that the local leak rate test program for testing of mechanical and electrical
| | On March 16, 1987, a security supervisor with a background in nuclear plant security was hired. A change was made to the security plan that ! |
| : penetrations was being performed in accordance with TS requirements. The
| | addressed ways to log entry into vital areas through any door not equipped with card readers, doors with inoperative card readers or vital areas where access cannot be controlled by the computer. The new security supervisor has also discussed with lead security personnel the need to I |
| ; NRC inspector observed / reviewed the following items.
| | demonstrate a prompt response to any concern expressed by NRC personnel, b. In the discussion provided, the response stated that the reason for the i |
| | violation was due to the fact that regulations stated in 10 CFR Part 73 had not been included in your site security plan or associated imple-menting procedures. Has a review been performed to identify other requirements stated in 10 CFR Part 73 that should be included in your site , |
| | security plan and associated implementing procedures? If not, it is ! |
| | requested that a reason be provided for not performing the review. If a ! |
| | review has been performed, it is requested that you provide details on the l extent and results of the completed review. J RfSPONSE A thorough review of the site security plan and 10 CFR Part 73 has been ! |
| | conducted for other discrepancies that may exist. A matrix of paragraphs from the site security plan was used to compare against 10 CFR Part 73. A review was completed in the Spring of 1986 and again in 1987. No further deficiencies were discovered. |
|
| |
|
| ! . All electrical and mechanical penetrations listed in the TS were
| | c. It is requested that you address any new actions you have determined to be i appropriate for corrective steps which will be taken to prevent further ! |
| ! tested in accordance with the licensee's approved procedure i | | violations, based on the results of your additional review performed on j Items a and b. Consideration of the generic aspects of the items is ' |
| ! . Procedure ST-CONT-2, " Containment Local Leak Detection Tests - Type B,"
| | appropriate. |
| ' provided the appropriate instructions for testing of penetrations
| |
| . The test equipment used was in current calibration
| |
| . The pressure used for testing conformed to the pressure specified in
| |
| : the TS j . Repairs were initiated for any penetrations discovered to be leaking
| |
| . Action was taken to verify that the maximum allcwable leakage rate
| |
|
| |
|
| was not exceeded upon discovery of a leaking penetration
| | , , |
| ! RE.YOVM.PFT4 ' '9 :'me v7 gMCAPOW
| | t _ __ _ _ ___ |
| - crcom r , . . . ..
| |
| ...; . , . .
| |
| ;
| |
| . . - . - , , , , - - - - , - - - _ . _ , , , , , - - . _ - . - . _ , . , - - - . - - - . ._ --
| |
|
| |
|
| . - - - _ _ ~ . .. _ -. _ _ _ .
| | i |
| < | | <.q |
| . .
| |
| J
| |
| ' | | ' |
| | <, |
| | l RESPONSE We believe the above actions are appropriate corrective steps and should ; |
| | prevent further violations in these areas. Generic aspects, as noted in ' |
| | Reference 3, will be emphasized to OPPD personnel to provide added assurance that NRC inspector concerns are appropriately addressed when i raised. ; |
| | i i |
| | . |
|
| |
|
| Based on the reviews performed during the inspection period, it appeared i that the licensee was implementing an appropriate leak rate testing
| | 2 |
| -
| | ' |
| program. At the end of this inspection period, the licensee had not completed the testing of all penetration assemblies. This portion of this inspection will be continued into the next inspection perio No violations or deviations were identified.
| | i i |
| | | l |
| -
| | , |
| 15. Exit Interview l'
| | l |
| The NRC inspector met with Mr. R. L. Andrews (Division Manager - Nuclear Production) and other members of the licensee staff at the end of this
| | ! |
| '
| | ; |
| inspection.~ At this meeting, the NRC inspector sumarized the scope of the inspection and the findings, i Mr. J. Boardman met with licensee personnel on March 20, 1987, to provide information related to a proposed inspection in the area of corrective i action programs. During the meeting, Mr. Boardman outlined the scope and nature of the inspection and submitted a request for copies of licensee i documentation associated with the inspection. Licensee personnel stated i
| | l |
| that the documentation would be provided in the near future. See paragraph 1 of this inspection report for meeting attendees.
| | ! |
| | l |
|
| |
|
| | ! |
| | < |
| | ,I i |
| i | | i |
| !
| | ! i I ! |
| :
| |
| ! | | ! |
| t l
| | ! 1 |
| | |
| | l |
| ! | | ! |
| | |
| | I l |
| l | | l |
| ,
| |
| !
| |
| REMOVAL OF THE PAGF3 M ARKED "FAFEGUARDS INFORMATION''
| |
| l DECONTROLS THE F1EMtaNDER OF THIS DOCUMENT.
| |
|
| |
|
| I E_ __ _ - - - - - - - - - - - -
| | L--_------------_- - - - - - - - - - - - - - - - - - - - _ - - - - - - - - - -o |
| }} | | }} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 1999-09-08
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062G6561990-11-19019 November 1990 Forwards Amend 134 to License DPR-40 & Safety Evaluation. Amend Addresses Two Administrative Changes ML20216K0541990-11-14014 November 1990 Forwards Safety Evaluation Denying Request for Exemption from Requirements of 10CFR50,App R for Fire Area 34B for Wide Range Nuclear Power Instrumentation Channels.Required Level of Protection Not Provided ML20062E4641990-11-0909 November 1990 Forwards Insp Rept 50-285/90-42 on 901015-19.No Violations or Deviations Noted ML20058H0551990-11-0101 November 1990 Forwards List of Unimplemented Gsis,Per Generic Ltr 90-04 ML20058C6821990-10-24024 October 1990 Offers No Comment on Annual Exercise Scenario Submitted Via ML20058A3901990-10-19019 October 1990 Advises That Maint Team Reinspection Scheduled for Wks of 901203 & 10.Meetings Will Be Scheduled on 901113-14 in Preparation for Insp.List of Required Matls Encl ML20062B6041990-10-12012 October 1990 Forwards Amend 133 to License DPR-40 & Safety Evaluation. Amend Modifies Tech Spec to Increase Refueling Boron Concentration & Revise Storage Requirements of Spent Fuel Pool Region 2 ML20059M6751990-09-28028 September 1990 Forwards Insp Rept 50-285/90-35 on 900729-0910.No Violations or Deviations Noted ML20059N3311990-09-28028 September 1990 Forwards Final SALP Rept 50-285/90-24 for Period of May 1989 - Aug 1990.Actions Discussed in 900726 SALP Mgt Meeting & Util 900827 Response to Initial SALP Rept Considered to Be Responsive to NRC Concerns & Recommendations ML20059K3691990-09-14014 September 1990 Ack Receipt & Review of Changes to Emergency Plan Re Emergency Facilities & Equipment Based on Review of .Proposed Changes Acceptable ML20059K7061990-09-14014 September 1990 Disagrees W/Position That More Detailed Design & Safety Assessment Using Ipe/Pra Appropriate Framework,Per Generic Ltr 89-19 ML20059J9871990-09-13013 September 1990 Provides Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exam to Be Administered on 901010.W/o Map of Exam Area & Preliminary Instructions to Participant Encl ML20056B4071990-08-20020 August 1990 Forwards Insp Rept 50-285/90-34 on 900730-0803.No Violations or Deviations Noted.Unresolved Items Identified in Paragrphs 2.1 & 4.0 of Encl Insp Rept ML20059A2211990-08-17017 August 1990 Forwards Evaluation of Cen 387-P, Pressurizer Surge Line Thermal Stratification. Info Provided by C-E Owners Group in Ref 1 & 2 Inadequate to Justify Meeting All Appropriate Limits for 40-yr Plant Life ML20058M8071990-08-10010 August 1990 Discusses Closeout of NRC Bulletin 90-001, Loss of Fill-Oil Transmitters Mfg by Rosemount. Util Replaced Four Transmitters Which Fell within Scope of Bulletin During Refueling & Maint Outage ML20058N3711990-08-10010 August 1990 Advises That Programmed Enhancements for Generic Ltr 88-17, Loss of DHR, Acceptable ML20056A5761990-08-0707 August 1990 Forwards Request for Addl Info to Review Alternate Seismic Criteria & Methodologies for Facility ML20056A7551990-08-0606 August 1990 Advises of Concluded Investigation Case 4-87-016 Re Alleged False Welding Records,Violations of Employee Protection & Cheating on Welding Performance Tests.Allegations Unsubstantiated ML20056A1721990-07-30030 July 1990 Advises That Written Licensing Exams Scheduled on 901113 & Operating Licensing Exams Scheduled on 901114 & 15.Licensee Requested to Furnish Ref Matl Listed in Encl 1 by 900917 in Order to Avoid Exam Being Rescheduled ML20056A3461990-07-27027 July 1990 Summarizes 900724 Meeting W/Util in Region IV Ofc Re Changes to Operator Licensing Program ML20055J1461990-07-23023 July 1990 Forwards Insp Rept 50-285/90-30 on 900513-0616 & Notice of Violation.App C Withheld from Public Per 10CFR73.21 ML20055G1791990-07-18018 July 1990 Ack Receipt of Advising NRC of Corrective Actions in Response to Violations Noted in Insp Rept 50-285/90-13. Implementation of Actions Will Be Reviewed During Future Insp ML20055G3931990-07-16016 July 1990 Informs That Financial Info Submitted for 1990 in Util Satisfies 10CFR.140 Requirements ML20055F6841990-07-12012 July 1990 Forwards Initial SALP Rept 50-285/90-24 for May 1989 - Apr 1990 IR 05000285/19900021990-07-0909 July 1990 Ack Receipt of 900507 & 0629 Responses to Violations & Deviations Noted in Insp Rept 50-285/90-02 ML20055G0171990-07-0606 July 1990 Forwards Amend 132 to License DPR-40 & Safety Evaluation. Amend Changes Tech Spec Pages 5-1,5-5,5-8 & 5-9a to Incorporate Title Changes as Result of Reorganization & Partial Relocation of Emergency Planning Dept IR 05000285/19900291990-07-0505 July 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/90-29 ML20055C7901990-06-18018 June 1990 Forwards Insp Rept 50-285/90-26 on 900416-0512.Violations Noted.No Citations Issued for Violations Discussed in Paragraphs 5.a,5.b, & 5.c of Rept ML20055C8051990-06-15015 June 1990 Forwards Insp Rept 50-285/90-25 on 900402-06 & 16-19 & Notice of Violation.Violations Pertain to Inadequate Assessment Aids,Detection Aids,Compensatory Measure & Key Control ML20059M9681990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20055C4101990-02-23023 February 1990 Advises That 891010 & 1207 Changes to Emergency Plan Reviewed by Emergency Preparedness Staff & Acceptable ML20248C7421989-09-28028 September 1989 Forwards Insp Rept 50-285/89-32 on 890801-31.Noted Violations Not Being Cited to Encourage & Support Util self-identification & Correction of Problems.One Unresolved Item Discussed in Paragraph 7.a of Rept ML20248C4901989-09-22022 September 1989 Forwards Summary of 890828 Enforcement Conference in Arlington,Tx to Discuss Violations Noted in Insp Repts 50-285/89-10 & 50-285/89-31.Attendance List Also Encl ML20247Q6361989-09-21021 September 1989 Forwards Amend 8 to Indemnity Agreement B-67,reflecting Changes to 10CFR140, Financial Protection Requirements & Indemnity Agreements IR 05000285/19890011989-09-19019 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/89-01.NRC Will Withdraw Items 3 & 4 If Review of Safety Evaluation Documentation Found to Be Adequate ML20247L2491989-09-18018 September 1989 Advises That 890907 Meeting W/Util Re Status of Plant Safety Enhancement Program Provided for Better Understanding of Progress Util Made in Implementing Program.List of Attendees & Meeting Slides Encl ML20247L6161989-09-0606 September 1989 Advises That 890808 Priority Description & Interim Milestones for Rev of safety-related Procedures & Commitment to Final Completion Date of 901231 Acceptable.Nrc Should Be Notified If Interim Milestones Cannot Be Met ML20247B1611989-08-30030 August 1989 Forwards Summary of Region Iv/Senior Util Executives Meeting on 890818 in Arlington,Tx.Topics Discussed Included Improving Communications,Salp Process in Region IV & Enforcement.List of Attendees & Agenda Encl ML20247A3151989-08-30030 August 1989 Forwards Final SALP Rept 50-285/89-19 for May 1988 - Apr 1989,summary of 890713 Meeting to Discuss SALP Rept & Util 890817 Response to SALP Rept ML20247B4191989-08-29029 August 1989 Forwards Insp Rept 50-285/89-28 on 890701-31.No Violations or Deviations Noted.One Unresolved Item Identified ML20246F0161989-08-25025 August 1989 Forwards Insp Rept 50-285/89-30 on 890724-28.No Violations or Deviations Noted ML20246D5521989-08-23023 August 1989 Discusses Util Response to Generic Ltr 89-08, Erosion/ Corrosion-Induced Pipe Wall Thinning, & Advises That Licensee Maintain,In Auditable Form,Records of Program ML20246E0791989-08-18018 August 1989 Discussess Insp Repts 50-285/89-10 & 50-285/89-23 on 890227-0303 & 0508-10 & Forwards Notice of Violation. Decision Not Reached by NRC Re Failures to Adequately Protect Safeguards Info from Compromises,Per 10CFR73.21 ML20246A0531989-08-17017 August 1989 Forwards Supplemental Safety Evaluation for Rev 4 to Inservice Testing Program for Pumps & Valves,Per Generic Ltr 89-04 ML20245H8901989-08-15015 August 1989 Forwards Safety Evaluation Supporting Util 890215 Response to Generic Ltr 83-28,Item 2.1 (Part 1), Vendor Interface for Reactor Trip Sys Components ML20245J9061989-08-11011 August 1989 Forwards Summary of Enforcement Conference on 890728 in Region IV Ofc Re Violations Noted in Insp Rept 50-285/89-27 Involving Inadequate Testing of Turbine Driven Auxiliary Feedwater Pump ML20245K3431989-08-11011 August 1989 Forwards Safety Evaluation Determining That Isolation Devices Qualified & Acceptable for Interfacing Safety & Nonsafety Sys Re Implementation of ATWS Rule IR 05000285/19890221989-08-0707 August 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-285/89-22 ML20248C4631989-08-0101 August 1989 Discusses 890728 Meeting in Region IV Re Discussion & Status Update for safety-related Procedures Upgrade Program.List of Attendees & Matl Presented at Meeting Encl ML20247L7921989-07-27027 July 1989 Informs That 890616 Response to NRC 890110 Safety Evaluation Re HPSI Header cross-connect Valves on Hot Leg Injection at Plant Acceptable,Including Adequacy of Path for Boron Control,Per Telcon Providing Flow Rate as 420 Gpm 1990-09-28
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210G1851999-07-27027 July 1999 Forwards Amend 192 to License DPR-40 & Safety Evaluation. Amend Consists of Changes to TS in Response to 990129 Application ML20216D6951999-07-26026 July 1999 Informs That During 990614 Review of Fort Calhoun,Nrc Noted That Drill/Exercise Performance Indicator Has Entered White Band,Which Indicated Level of Licensee Performance That Warranted Increased Regulatory Response ML20210D9471999-07-22022 July 1999 Forwards Amend 191 to DPR-40 & Safety Evaluation.Amend Authorizes Rev to Licensing Basis as Described in Updated Safety Analysis Rept to Incorporate Mod for Overriding Containment Isolation ML20210C0201999-07-20020 July 1999 Informs That Due to Administrative Oversight,Revised TS Bases Provided in to Fort Calhoun Station Were Not Dated.Dated Pages to TS Encl ML20210C2041999-07-20020 July 1999 Discusses 990715 Mgt Meeting with Midamerican Energy Co Re risk-informed Baseline Insp Program Recently Implemented at Cooper & Fort Calhoun Stations ML20210B0761999-07-19019 July 1999 Forwards Insp Rept 50-285/99-05 on 990601-0710.No Violations Noted ML20209G5351999-07-15015 July 1999 Informs That Staff Incorporated Rev of TS Bases Provided by Licensee Ltr Dtd 980904,into Fort Calhoun Station Tss. Staff Finds Revs to Associated TS Bases to Be Acceptable. Revised Bases Pages Encl ML20209F5741999-07-12012 July 1999 Ack Receipt of Transmitting Exercise Scenario for Upcoming Biennial Offsite Exercise Scheduled 990810.Scenario Reviewed & Acceptable ML20209G5591999-07-0808 July 1999 Forwards Detailed Listing of Staff Concerns with C-E TR NPSD-683,rev 3 & RCS pressure-temperature Limits Rept ML20209D8771999-07-0101 July 1999 Summarizes 990630 Public Meeting Conducted in Fort Calhoun, Ne Re Results of Completed Culture Survey,Plant Status, Facility Activities Re New NRC Oversight Process & License Renewal.Licensee Handout & Attendance List Encl ML20196F4931999-06-24024 June 1999 Discusses 990617 Public Meeting at Dana College,Blair,Ne Re Overview of Pilot Insp Program ML20196D2321999-06-21021 June 1999 Forwards Corrected Cover Ltr for Insp Rept 50-285/99-04. Original Cover Ltr Incorrectly Stated That Rept Contained Two Noncited Violations,When Rept Actually Documented Only One ML20195J2121999-06-14014 June 1999 Ack Receipt of Ltr Dtd 990316,which Transmitted Rev 16B to Site Security Plan,Rev 2 to Safeguards Contingency Plan & Rev 6 to Training & Qualification Plan for Plant,Under Provisions of 10CFR50.54(p) IR 05000285/19990041999-06-11011 June 1999 Corrected Ltr Forwarding Insp Rept 50-285/99-04 on 990425-0531.Insp Determined That One Violation of NRC Requirements Occurred & Being Treated as Noncited Violation, Consistent with App C of Enforcement Policy ML20195J2481999-06-11011 June 1999 Forwards Insp Rept 50-285/99-04 on 990425-0531.Violations Identified & Being Treated as Noncited ML20195G3141999-06-10010 June 1999 Ack Receipt of & Encl Objectives for Facility Emergency Plan Exercise,Scheduled for 990810 ML20195E8391999-06-0909 June 1999 Ack Receipt of Transmitting Changes to Licensee Emergency Plan,Rev 14 & Emergency Plan Implementing Procedure OSC-1 Under Provisions of 10CFR50,App E,Section IV ML20195G3621999-06-0808 June 1999 Ack Receipt of ,Which Transmitted Changes to Fort Calhoun Station Emergency Plan,App A,Rev 15,under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required ML20207G4741999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station EP Implementing Procedure EPIP-OSC-1, Emergency Classification,Rev 31,under Provisions of 10CFR50, App E,Section V ML20207G4631999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station Ep,App B,Rev 4,under Provisions of 10CFR50,App E,Section V.No Violations Identified During Review ML20207G2981999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station Radiological Er Plan,Section E,Rev 22,under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required Due to Determination That Effectiveness Unchanged ML20207G4661999-06-0808 June 1999 Ack Receipt of Which Transmitted Changes to Fort Calhoun Station EP Implementing Procedure EPIP OSC-1, Emergency Classification,Rev 30,under Provisions of 10CFR50, App E,Section V ML20207G3401999-05-27027 May 1999 Informs That NRC Held Planning Meeting on 990511 for Fort Calhoun Station to Identify Insp Activities at Facility for Next 6 to 12 Months.Informs of NRC Planned Insp Activities & Offers Licensee Opportunity to Provide Feedback ML20207A9041999-05-24024 May 1999 Informs That NRR Reorganized,Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Was Created. Reorganization Chart Encl ML20206U6331999-05-18018 May 1999 Forwards Insp Rept 50-285/99-03 on 990314-0424.Four Violations of NRC Requirements Identified & Being Treated as Noncited Violations Consistent with App C of Enforcement Policy ML20206L4151999-05-10010 May 1999 Forwards SE of OPPD Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20206H4471999-05-0707 May 1999 Informs That on 990407,NRC Administered Gfes of Written Operator Licensing Exam.Licensee Facility Did Not Participate in Exam,However,Copy of Master Exam with Answer Key,Encl for Info.Without Encl ML20206E7201999-04-28028 April 1999 Responds to Meeting Conducted 990419 in Fort Calhoun,Ne Re Results of PPR Completed 990211.Addl Topics Discussed Included New Assessment Process & Upcoming Actions Planned in Response to Y2K Concerns ML20205Q5671999-04-15015 April 1999 Forwards Amend 190 to License DPR-40 & Safety Evaluation. Amend Revises TS 5.2.f & TS 5.11.2 to Change Title of Shift Supervisor to Shift Manager ML20205J2751999-04-0202 April 1999 Forwards Insp Rept 50-285/99-02 on 990131-0313.No Violations Noted.During Insp,Licensee Conduct of Activities at Fort Calhoun Station Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices ML20205A7191999-03-19019 March 1999 Informs That on 990211 NRC Staff Completed PPR of Fort Calhoun Station.Review Was Conducted for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20207K6151999-03-11011 March 1999 Forwards Insp Rept 50-285/99-01 on 990208-26.One Noncited Violation Was Identified ML20207E8691999-03-0303 March 1999 Forwards Correction to Amend 188 to License DPR-40 for Plant,Unit 1.Administrative Error,Three Pages of TSs Contained Errors,An Incorrect Page Number,Missing Parenthesis & Misspelled Words ML20203F2041999-02-11011 February 1999 Informs That During 990208 Telcon Between Mc Ralrick & J Pellet & T Stetka,Arrangements Were Made for Administration of Licensing Examinations at Fort Calhoun Station for Week of 991018 1999-09-07
[Table view] |
Text
l q. ,
AUG 131987
,
In Reply Refer To:
Docket: 50-285/87-06 Omaha Public Power District ATTN: R. L. Andrews, Division Manager- ,
Nuclear Production
-
1623 Harney Street Omaha, Nebraska 68102 Gentlemen:
Thank you for your letters of May 22 and July 21, 1987, in response to our letters and Notice of Violation dated April 22 and June 19, 1987. We have reviewed.your reply and find it responsive to the concerns raised in our Notice of Violation. We will review the implementation of your corrective
,
actions during a future inspection to determine that full compliance has been achieved and will be maintained.
Sincerely, Ocne 4 ,
J. 2. C N .;: .._
J. E. Gagliardo, Chief Reactor Projects Branch cc:
W. G. Gates, Manager Fort Calhoun Station P. O. Box 399 Fort Calhoun, Nebraska 68023 Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, DC 20036 (cc cont'd next page) i
!
- FCS PI S RIV:EP M C:EP&Sh C: SP WLFi er PHHarrell/nc RPMullikin RACALDOELL LAYandt ;
08/06/87 f/1/87 @/jo/87 /
fr /7 /87 l RPB j C:RP '
f DRHu r JEGagi/afdo g @ /87 g/}3/8' Q l 0k 8708200017 870813
{DR ADOCK 05000285 PDR s\
[: ,
8 5 Omaha Public Power District -2- .I
Kansas Radiation Control Program Director Nebraska Radiation Control Program Director !
bec to DMB (IE04)
bec distrib. by RIV: j RPB RRI R. D. Martin, RA l R&SPB SectionChief(RP8/B) MIS System
,
RIV File DRSP RSTS Operator i RSB Project Inspector D. Weiss, RM/ALF
, R. Hall
!
,
j l
I
_ _ _ _ _ _ _ _ _ _ _
-
-_
- _._ _ _ _ . . _ _ . R l
. . <
!
SARCl!/.ES liHORMAll0N 1
{
Yi L
Omaha Public Power District !
1623 Hamey Omaha. Nebraska 68102 2247 (
402/536 4000 i May 22, 1987 LIC-87-357 I ENCLOSURE (S) CONTAIN(S)
SATEGUARDS INFORMATION.
DECONTROL. LED WHEN l
,
SEPARATED FROM ATTACHMENT (S) J
!
Mr. J. E. Gagliardo, Chief Reactor Projects Branch U. S. Nuclear Regulatory Commission 3%hT/$1 L
' ~
Region Iv t
611 Ryan Plaza Drive, Suite 1000 MAY M P
\,
.
Arlington, TX 76011
.
L, p References: 1. Docket No. 50-285 [- ._.._*
-
2.
Letter NRC (J. E. Gagliardo) to OPPD (R. L. Andrews) dated ~l
' April 22,1987 (IER 50-285/87-06) 1
Dear Mr. Gagliardo:
I i SUBJECT: Inspection Report 87-06 l
The subject inspection report identified one violation concerning a security matter.
Pursuant to the provisions of 10 CFR 2.201, please find attached the Omaha Public Power District's response to this' violation.
The details of this response are deemed Safeguards Information in accordance with 10 CFR 73.21. As such, this document should not be placed in the Public Document Room.
If you have contact us. any questions concerning this matter, please do not hesitate to
Sincerely, AW R. L. Andrews Division Manager Nuclear Production RLA/me Attachment c: LeBoeuf, Lamb, Leiby & MacRae w/o Attachment
.
R. D. Martin, NRC Regional Administrator w/o Attachment
'g W. A. Paulson, NRC Project Managerw/o Attachment P. H. Harrell, NRC Senior Resident Inspector w/o Attachment xv a smaanmunev &,
. - . . .
'
.--...............-...
_ _ _ _ _ - _ _ _ - - - - -
l I
< . , , 'j
.
--=~_======r=======--- - - - - = = = = = = . = = = = - = = =
^
.:=: -
_ _ . . _ _ _ _ . - - _ _ - . _ _ .
Omaha Public Power District i 1623 Harney Omaha. Nebraska 68102 _ ,.
-
ggggg
_
402/536 4000
'
l [ .
July 21, 1987 JUL 2 41987 ,'O LIC-87-523 'g
'
."
_..J
]
Mr. J. E. Gagliardo, Chief {
Reactor Projects Branch V. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 References: 1. Docket No. 50-285 .
2. Letter NRC (J. E. Gagliardo) to OPPD (R. L. Andrews) dated April 22, 1987 (IER 50-285/87-06) l 3. Letter OPPD (R. L. Andrews) to NRC (J. E. Gagliardo) dated May 22, 1987 (LIC-87-357)
4. Letter NRC (J. E. Gagliardo)'to OPPD (R. L. Andrews) dated June 19, 1987 (IER 50-285/87-06) -1 l
Dear Mr. Gagliardo:
SUBJECT: Additional Information for Inspection Report 285/87-06 Omaha Public Power District recently received Reference 4 requesting
, supplemental information to that provided in Reference.3. Accordingly, please find attached additional information concerning Inspection Report 285/87-06.
Sincerely, i
l R. L. Andrews /d)
'
Division Manager Nuclear Production RLA:rge Attachment c: LeBoeuf, Lamb, Leiby & MacRae I 1333 New Hampshire Ave., N.W. !
Washington, DC 20036 )
P. H. Harrell, NRC Senior Resident Inspector li J7 4g!o=
y j,
,
R. D. Martin, Regional Administrator ,
l Qw ,TV 455t24 Emplograen th EQtt Opportunity /l !
l
'
. , ,.
l l
Attachment
~
a. During the performance of the inspection, it was established that the violation occurred, in part, due to the security supervisor not responding i
'
to concerns identified by NRC personnel. This was not discussed in your '
response to the reason for the violation. It is requested that you provide a response to this aspect of the violation, i
RESPONE The reason for the violation was that the Supervisor-Security did not take !
appropriate action on the resident NRC inspector's concern about logging into vital areas with no card reader. His interpretation of the site security plan was that it adequately addressed logging into areas which is accomplished by the computer. He believed that OPPD was in compliance.
He was approached a second time about the discrepancy and responded by requiring a manual log be kept, but only at rollup doors without card readers. He did not address inoperative card readers or other vital area i doors without card readers.
!
On March 16, 1987, a security supervisor with a background in nuclear plant security was hired. A change was made to the security plan that !
addressed ways to log entry into vital areas through any door not equipped with card readers, doors with inoperative card readers or vital areas where access cannot be controlled by the computer. The new security supervisor has also discussed with lead security personnel the need to I
demonstrate a prompt response to any concern expressed by NRC personnel, b. In the discussion provided, the response stated that the reason for the i
violation was due to the fact that regulations stated in 10 CFR Part 73 had not been included in your site security plan or associated imple-menting procedures. Has a review been performed to identify other requirements stated in 10 CFR Part 73 that should be included in your site ,
security plan and associated implementing procedures? If not, it is !
requested that a reason be provided for not performing the review. If a !
review has been performed, it is requested that you provide details on the l extent and results of the completed review. J RfSPONSE A thorough review of the site security plan and 10 CFR Part 73 has been !
conducted for other discrepancies that may exist. A matrix of paragraphs from the site security plan was used to compare against 10 CFR Part 73. A review was completed in the Spring of 1986 and again in 1987. No further deficiencies were discovered.
c. It is requested that you address any new actions you have determined to be i appropriate for corrective steps which will be taken to prevent further !
violations, based on the results of your additional review performed on j Items a and b. Consideration of the generic aspects of the items is '
appropriate.
, ,
t _ __ _ _ ___
i
<.q
'
<,
l RESPONSE We believe the above actions are appropriate corrective steps and should ;
prevent further violations in these areas. Generic aspects, as noted in '
Reference 3, will be emphasized to OPPD personnel to provide added assurance that NRC inspector concerns are appropriately addressed when i raised. ;