ML20199E586: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:l
{{#Wiki_filter:l
[.                                                 COMANCHE PEAK RESPONSE TEAM                       -
[.
1 POPULATION DESCRIPTION                     .
COMANCHE PEAK RESPONSE TEAM POPULATION DESCRIPTION Page 1 of 2 g
Page 1 of 2 g               POPULATION NAME: Field Fabricated Tanks i
POPULATION NAME: Field Fabricated Tanks i
PREPARED BY: % d , % Q [ m                                       DATE: AUGUST 17, 1985 RESPONSIBLE QA/QC SUPPORT-isNENEN             REV:   2 f
PREPARED BY: % d, % Q [ m DATE: AUGUST 17, 1985 RESPONSIBLE QA/QC SUPPORT-isNENEN REV:
2 f
SYSTEM; COMPONENTS, AND STRUCTURES:
SYSTEM; COMPONENTS, AND STRUCTURES:
l                 The population includes all safety related field fabricated tanks. These j                 tanks are in the Boron Recycle System, Chemical and Volume Control System, and Diesel Generator Fuel Oil System. Included in the population is the overall tank construction including items that form a part of or are attached to the tank bottom, shell or roof. These include:
l The population includes all safety related field fabricated tanks. These j
tanks are in the Boron Recycle System, Chemical and Volume Control System, and Diesel Generator Fuel Oil System.
Included in the population is the overall tank construction including items that form a part of or are attached to the tank bottom, shell or roof. These include:
Bottom, shell and roof assembly including welding Flanged nozzles from the tank out to the face of the nozzle flange.
Bottom, shell and roof assembly including welding Flanged nozzles from the tank out to the face of the nozzle flange.
Welded nozzles from the tank out to, but not including the first circumferencial pipe weld.
Welded nozzles from the tank out to, but not including the first circumferencial pipe weld.
Threaded nozzles from the tank out to but not including the
Threaded nozzles from the tank out to but not including the first piping connection. NOTE:
  !                                first piping connection. NOTE: If nozzle is capped, the cap is i                                 included.
If nozzle is capped, the cap is i
included.
i Safety related internal piping.
i Safety related internal piping.
i                               Anchor bolt ring or saddle.
i Anchor bolt ring or saddle.
Manholes including covers.
Manholes including covers.
Seismic restraints.
Seismic restraints.
Miscellaneous welded attachments for items such as:         Instrument and pipe supports, shear bars, reinforcing pads, ladders, davit and diaphragm supports, etc.
Miscellaneous welded attachments for items such as:
Instrument and pipe supports, shear bars, reinforcing pads, ladders, davit and diaphragm supports, etc.
Installation of nuts and washers for anchor bolts.
Installation of nuts and washers for anchor bolts.
Grouting l
Grouting l
Line 39: Line 44:
All safety related Field Fabricated Tanks as shown on CBI's Construction drawings whose installation is complete, final QC inspected and accepted, and located in Units 1 and 2 and common areas are included in the population.
All safety related Field Fabricated Tanks as shown on CBI's Construction drawings whose installation is complete, final QC inspected and accepted, and located in Units 1 and 2 and common areas are included in the population.
8606230330 860609
8606230330 860609
'i                                                 PDR       FOIA OARDE86-36             PDR n               -    r. ?
'i PDR FOIA OARDE86-36 PDR n
APPROVED BY:                     .                                DATE: f 46 4[
r.
t                                Q   QC LEAD DISCIPLINE ENG[EEER AFPROVED BY:             N/ /        M                            DATE: ["40-[f QA/QC REINSPECTION ENGINEERING
?
: b.                                         SUPERVISOR g                                                     -
APPROVED BY:
DATE:
f 46 4[
Q QC LEAD DISCIPLINE ENG[EEER t
N/
M AFPROVED BY:
/
DATE:
["40-[f QA/QC REINSPECTION ENGINEERING b.
SUPERVISOR g
i h
i h
k           . . -
k
: m. s .           .-  -%..  ..        - - -          "-    - ~ ~ #" M " " ~
.. - m. s.
: m. -       .        . = = w = w.w =. w =.m                                             w...a~--=..          . . .
- ~ ~ #" M " " ~
        +
: m. -
* t     ,
. = = w = w.w =. w =.m w...a~--=..
COMANCHE PEAK RESPONSE TEAM POPULATION DESCRIPTION
+
                                                                                                ~
t COMANCHE PEAK RESPONSE TEAM POPULATION DESCRIPTION
Page 2 of 2
~
;                      POPULATION NAME: Field Fabricated Tanks i
Page 2 of 2 POPULATION NAME: Field Fabricated Tanks i
f PREPARED BY: %               %Q [m RES70NSIBLE QA/QC SUPPORT' ENGINEER DATE: AUCUST 17, 1985 REV:   2 l
PREPARED BY: %
%Q [m DATE: AUCUST 17, 1985 f
RES70NSIBLE QA/QC SUPPORT' ENGINEER REV:
2 l
k The boundary of the Field Fabricated Tanks population is:
k The boundary of the Field Fabricated Tanks population is:
At the tank grout and concrete pad. Included in the population         j are the tank structural supports.
At the tank grout and concrete pad. Included in the population j
are the tank structural supports.
At the anchor bolts.
At the anchor bolts.
I
At the face of flange for flanged nozzles.
* At the face of flange for flanged nozzles.
I At the welding end for welded nozzles.
At the welding end for welded nozzles.
At the electrical connection.
At the electrical connection.
At the interface of the tank nozzle and the instrumentation, vent, duct or piping connection.
At the interface of the tank nozzle and the instrumentation, vent, duct or piping connection.
At the first pipe weld outside of the tank for internal piping.                 '
At the first pipe weld outside of the tank for internal piping.
SPECIFIC INTERFACES:
SPECIFIC INTERFACES:
(
(
Line 76: Line 93:
Internal diaphragas. These are non-safety related.
Internal diaphragas. These are non-safety related.
g g
g g
                  .. 2...}}
2...}}

Latest revision as of 07:56, 10 December 2024

Rev 2 to Population Description, Field Fabricated Tanks
ML20199E586
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 08/17/1985
From: Patterson A, Schauf J, Megan Wright
NRC - COMANCHE PEAK PROJECT (TECHNICAL REVIEW TEAM)
To:
Shared Package
ML20199D912 List: ... further results
References
FOIA-86-36 NUDOCS 8606230330
Download: ML20199E586 (2)


Text

l

[.

COMANCHE PEAK RESPONSE TEAM POPULATION DESCRIPTION Page 1 of 2 g

POPULATION NAME: Field Fabricated Tanks i

PREPARED BY: % d, % Q [ m DATE: AUGUST 17, 1985 RESPONSIBLE QA/QC SUPPORT-isNENEN REV:

2 f

SYSTEM; COMPONENTS, AND STRUCTURES:

l The population includes all safety related field fabricated tanks. These j

tanks are in the Boron Recycle System, Chemical and Volume Control System, and Diesel Generator Fuel Oil System.

Included in the population is the overall tank construction including items that form a part of or are attached to the tank bottom, shell or roof. These include:

Bottom, shell and roof assembly including welding Flanged nozzles from the tank out to the face of the nozzle flange.

Welded nozzles from the tank out to, but not including the first circumferencial pipe weld.

Threaded nozzles from the tank out to but not including the first piping connection. NOTE:

If nozzle is capped, the cap is i

included.

i Safety related internal piping.

i Anchor bolt ring or saddle.

Manholes including covers.

Seismic restraints.

Miscellaneous welded attachments for items such as:

Instrument and pipe supports, shear bars, reinforcing pads, ladders, davit and diaphragm supports, etc.

Installation of nuts and washers for anchor bolts.

Grouting l

POPULATION BOUNDARY:

All safety related Field Fabricated Tanks as shown on CBI's Construction drawings whose installation is complete, final QC inspected and accepted, and located in Units 1 and 2 and common areas are included in the population.

8606230330 860609

'i PDR FOIA OARDE86-36 PDR n

r.

?

APPROVED BY:

DATE:

f 46 4[

Q QC LEAD DISCIPLINE ENG[EEER t

N/

M AFPROVED BY:

/

DATE:

["40-[f QA/QC REINSPECTION ENGINEERING b.

SUPERVISOR g

i h

k

.. - m. s.

- ~ ~ #" M " " ~

m. -

. = = w = w.w =. w =.m w...a~--=..

+

t COMANCHE PEAK RESPONSE TEAM POPULATION DESCRIPTION

~

Page 2 of 2 POPULATION NAME: Field Fabricated Tanks i

PREPARED BY: %

%Q [m DATE: AUCUST 17, 1985 f

RES70NSIBLE QA/QC SUPPORT' ENGINEER REV:

2 l

k The boundary of the Field Fabricated Tanks population is:

At the tank grout and concrete pad. Included in the population j

are the tank structural supports.

At the anchor bolts.

At the face of flange for flanged nozzles.

I At the welding end for welded nozzles.

At the electrical connection.

At the interface of the tank nozzle and the instrumentation, vent, duct or piping connection.

At the first pipe weld outside of the tank for internal piping.

SPECIFIC INTERFACES:

(

The population shall not include:

Concrete foundations, including embedded anchors.

l These are included in the Concrete Placement population.

Electrical connections. These are included in the Cables population.

Instrumentation and instrumentation connections. These are included in the Instrumentation Equipment Installation population.

Large bore pipe welds and small bore pipe welds to welded-end nozzles. These are included in the Large. Bore Pipe-Welds / Material and Small Bore Piping and Instrument Pipe / Tubing Welds / Material populations, respectively.

Solted joints (and associated bolts, nuts, gaskets, etc.) to flanged nozzles. These are included in the Piping System Bolted Joints / Materials population.

  • Concrete encased, steel lined tanks. These are included in the Liners population.

Duct sheet metal pieces. These are included in the HVAC Ducts and Plenums population.

Internal diaphragas. These are non-safety related.

g g

2...