Line 5: Line 5:
| author name = Peterson H
| author name = Peterson H
| author affiliation = NRC/RGN-III/DRS/EB3
| author affiliation = NRC/RGN-III/DRS/EB3
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000461
| docket = 05000461
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
See also: [[followed by::IR 05000461/2012007]]
See also: [[see also::IR 05000461/2012007]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352
[[Issue date::February 28, 2012]]
  February 28, 2012  
 
Mr. Michael Site Vice-President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555
Mr. Michael J. Pacilio Site Vice-President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555 SUBJECT: CLINTON POWER STATION INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATION AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION 05000461/2012007(DRS) Dear Mr. Pacilio: On June 25, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a Modification and 10 CFR 50.59 (MOD/50.59) baseline inspection at the Clinton Power Station. This  
 
inspection will be performed in accordance with the NRC baseline Inspection Procedure IP 71111.17. The on-site portion of the inspection will take place on June 25-29 and July 9-13. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request  
SUBJECT: CLINTON POWER STATION INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATION AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION 05000461/2012007(DRS)
for documents needed for the inspection. These documents have been divided into three groups.   The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via compact disc to the Regional Office no later than May 1, 2012. The inspection team will review this information by May 14, 2012, and will request specific items that should be available for review by June 11, 2012.   The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within this  
 
group, i.e., Item (1), will be requested for review in the Regional Office prior to the inspection. The remaining documents should be available by the first day of the on-site inspection, June 25, 2012.   The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector, as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.
==Dear Mr. Pacilio:==
M. Pacilio    -2- The lead inspector for this inspection is Mr. Mohammad Munir. We understand that our regulatory contact for this inspection is Mr. Ron Frantz of your organization. If there are any  
On June 25, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a Modification and 10 CFR 50.59 (MOD/50.59) baseline inspection at the Clinton Power Station. This inspection will be performed in accordance with the NRC baseline Inspection Procedure IP 71111.17. The on-site portion of the inspection will take place on June 25-29 and July 9-13. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into three groups. The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via compact disc to the Regional Office no later than May 1, 2012. The inspection team will review this information by May 14, 2012, and will request specific items that should be available for review by June 11, 2012. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within this group, i.e., Item (1), will be requested for review in the Regional Office prior to the inspection. The remaining documents should be available by the first day of the on-site inspection, June 25, 2012. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector, as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection. The lead inspector for this inspection is Mr. Mohammad Munir. We understand that our regulatory contact for this inspection is Mr. Ron Frantz of your organization. If there are any questions about the inspection or the materials requested, please contact the lead inspector at (630) 829-9797 or via e-mail at mohammad.munir@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number." In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
questions about the inspection or the materials requested, please contact the lead inspector at (630) 829-9797 or via e-mail at mohammad.munir@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control  
 
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number." In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,   /RA/ Hironori Peterson, Acting Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-461
Sincerely,/RA/ Hironori Peterson, Acting Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-461 License No. NPF-62  
License No. NPF-62 Enclosure: MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServŽ  
 
MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST
===Enclosure:===
1 Enclosure Inspection Report
MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServŽ MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST 1 Enclosure Inspection Report: 05000461/2012007(DRS) Inspection Dates: June 25-29, 2012; and July 9-13, 2012 Inspection Procedures: IP 71111- 17, "Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications" Lead Inspector: Mohammad Munir, Lead Inspector (630) 829-9797 I. Information Requested for In-Office Preparation Week The following information is requested by May 1, 2012, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection week. The team will select specific items from the information requested below and submit a list to your staff by May 14, 2012. We will request that certain items be made available to the regional office prior to the inspection by June 11, 2012. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should cover the time frame from the receipt of information for the last Permanent Modification inspection on February 13, 2009, to the present. If you have any questions regarding this information, please call the team leader as soon as possible. (1) List of "permanent plant modifications" to systems, structures, or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.) The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated calculations and affected procedures. (2) List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b). procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list should include 50.59 evaluations for the following: a. Changes that have been made under the previsions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since February 13, 2009; MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST 2 Enclosure b. Modifications that are field work complete; and c. Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained. (3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). (4) List of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply. (5) List of calculation changes that have been issued for use.
: 05000461/2012007(DRS) Inspection Dates
 
: June 25-29, 2012; and July 9-13, 2012 Inspection Procedures
(6) List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents associated with modification and MOD 50.59 change implementation. The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance, (7) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates. (8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal. (9) Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal. (10) Electronic copy of the UFSAR, if available MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST 3 Enclosure (11) Name(s) and phone numbers for the regulatory and technical contacts. (12) Current management and engineering organizational chart. II. Information Requested to be Available Prior to Inspection (Request will be made by May 14, 2012, for availability of documents by June 11, 2012, [Item 1]) or on First Day of Inspection (June 25, 2012), [Items 2, 3 and 4] (1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations, or screenings, and any corrective action documents. (2) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them. a. Updated Final Safety Analysis Report; b. Original FSAR Volumes; c. Original SER and Supplements; d. FSAR Question and Answers; e. Quality Assurance Plan; f. Technical Specifications; g. Latest IPE/PRA Report; h. Vendor Manuals; and i. The Latest 10 CFR 50.59 FSAR Update Submittal. (3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are: a. Drawings supporting the modifications; b. Procedures affected by the modifications; and c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. (4) Current management and engineering organizational chart.
: IP 71111- 17, "Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications" Lead Inspector
 
: Mohammad Munir, Lead Inspector (630) 829-9797 I. Information Requested for In-Office Preparation Week
(5) Assessment and corrective Actions: a. The most recent modification (MOD)/50.59 Quality Assurance (QA) audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 Quality Assurance (QA) audit and/or self-assessment.
The following information is requested by May 1, 2012, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection  
 
week. The team will select specific items from the information requested below and submit a list to your staff by May 14, 2012. We will request that certain items be made available to the regional office prior to the inspection by June 11, 2012. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should  
MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST 4 Enclosure III. Information Requested to be provided throughout the inspection (1) Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. (2) Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). If you have questions regarding the information requested, please contact the team leader.
cover the time frame from the receipt of information for the last Permanent Modification inspection on February 13, 2009, to the present. If you have any questions regarding this information, please call the team leader as soon as possible. (1) List of "permanent plant modifications" to systems, structures, or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.) The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated  
calculations and affected procedures. (2) List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b). procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list should
include 50.59 evaluations for the following: a. Changes that have been made under the previsions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since February 13, 2009;  
MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST
2 Enclosure b. Modifications that are field work complete; and c. Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained. (3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). (4) List of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply. (5) List of calculation changes that have been issued for use.  
(6) List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents  
associated with modification and MOD 50.59 change implementation. The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance, (7) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates. (8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal. (9) Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal. (10) Electronic copy of the UFSAR, if available  
MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST
3 Enclosure (11) Name(s) and phone numbers for the regulatory and technical contacts. (12) Current management and engineering organizational chart. II. Information Requested to be Available Prior to Inspection (Request will be made by May 14, 2012, for availability of documents by June 11, 2012, [Item 1]) or on First Day of Inspection (June 25, 2012), [Items 2, 3 and 4]
(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations, or screenings, and any corrective action documents. (2) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them. a. Updated Final Safety Analysis Report; b. Original FSAR Volumes;  
c. Original SER and Supplements;  
d. FSAR Question and Answers;  
e. Quality Assurance Plan;  
f. Technical Specifications;  
g. Latest IPE/PRA Report; h. Vendor Manuals; and i. The Latest 10 CFR 50.59 FSAR Update Submittal. (3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are: a. Drawings supporting the modifications;  
b. Procedures affected by the modifications; and  
c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. (4) Current management and engineering organizational chart.  
(5) Assessment and corrective Actions: a. The most recent modification (MOD)/50.59 Quality Assurance (QA) audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 Quality Assurance (QA) audit and/or self-assessment.  
MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST
4 Enclosure III. Information Requested to be provided throughout the inspection
(1) Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. (2) Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). If you have questions regarding the information requested, please contact the team leader.  
  M. Pacilio    -2- The lead inspector for this inspection is Mr. Mohammad Munir.  We understand that our regulatory contact for this inspection is Mr. Ron Frantz of your organization.  If there are any questions about
the inspection or the materials requested, please contact the lead inspector at (630) 829-9797 or via
e-mail at mohammad.munir@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-0011. 
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a
currently valid Office of Management and Budget control number." In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or
from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, 
/RA/
Hironori Peterson, Acting Chief Engineering Branch 3 Division of Reactor Safety  Docket No. 50-461
License No. NPF-62 Enclosure: MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServŽ
   
DISTRIBUTION
: See next page
  DOCUMENT NAME:  Ltr. 022812 CLINTON MOD 50 59 RFI MXM.docx  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copy
OFFICE RIII  RIII   
  NAME MMunir:ls HPeterson 
DATE 02/28/12 02/28/12 
OFFICIAL RECORD COPY
  Letter to Mr. Michael Pacilio from Mr. Hironori Peterson dated February 28, 2012.
SUBJECT: CLINTON POWER STATION INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION 05000461/2012007(DRS) DISTRIBUTION
: Breeda Reilly RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource
Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck
Allan Barker Carole Ariano
Linda Linn DRSIII DRPIII
Patricia Buckley Tammy Tomczak
}}
}}

Revision as of 02:26, 29 June 2019

Ltr 02/28/12 Clinton Power Station Information Request for an NRC Triennial Permanent Modification and 10 CFR 50.59 (MOD/50.59) Baseline Inspection 05000461-12-007 (DRS)
ML12061A445
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/28/2012
From: Hironori Peterson
Engineering Branch 3
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Mohammad Munir
References
IR-12-007
Download: ML12061A445 (8)


See also: IR 05000461/2012007

Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352

February 28, 2012

Mr. Michael J. Pacilio Site Vice-President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville IL 60555 SUBJECT: CLINTON POWER STATION INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATION AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION 05000461/2012007(DRS) Dear Mr. Pacilio: On June 25, 2012, the U.S. Nuclear Regulatory Commission (NRC) will begin a Modification and 10 CFR 50.59 (MOD/50.59) baseline inspection at the Clinton Power Station. This

inspection will be performed in accordance with the NRC baseline Inspection Procedure IP 71111.17. The on-site portion of the inspection will take place on June 25-29 and July 9-13. Experience has shown that these baseline inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request

for documents needed for the inspection. These documents have been divided into three groups. The first group of information is necessary to ensure that the inspection team is adequately prepared for the inspection. This information should be made available via compact disc to the Regional Office no later than May 1, 2012. The inspection team will review this information by May 14, 2012, and will request specific items that should be available for review by June 11, 2012. The second group of requested documents contains additional items that the team will review, or need access to, during the inspection. Certain documents contained within this

group, i.e., Item (1), will be requested for review in the Regional Office prior to the inspection. The remaining documents should be available by the first day of the on-site inspection, June 25, 2012. The third group lists information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector, as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on-site portions of the inspection.

M. Pacilio -2- The lead inspector for this inspection is Mr. Mohammad Munir. We understand that our regulatory contact for this inspection is Mr. Ron Frantz of your organization. If there are any

questions about the inspection or the materials requested, please contact the lead inspector at (630) 829-9797 or via e-mail at mohammad.munir@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number." In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Hironori Peterson, Acting Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-461

License No. NPF-62 Enclosure: MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServŽ

MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST

1 Enclosure Inspection Report : 05000461/2012007(DRS) Inspection Dates

June 25-29, 2012; and July 9-13, 2012 Inspection Procedures
IP 71111- 17, "Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications" Lead Inspector
Mohammad Munir, Lead Inspector (630) 829-9797 I. Information Requested for In-Office Preparation Week

The following information is requested by May 1, 2012, or sooner, to facilitate the selection of specific items that will be reviewed during the on-site inspection

week. The team will select specific items from the information requested below and submit a list to your staff by May 14, 2012. We will request that certain items be made available to the regional office prior to the inspection by June 11, 2012. We request that the remaining items selected from the lists be available and ready for review on the first day of inspection. All requested information should

cover the time frame from the receipt of information for the last Permanent Modification inspection on February 13, 2009, to the present. If you have any questions regarding this information, please call the team leader as soon as possible. (1) List of "permanent plant modifications" to systems, structures, or components that are field work complete. (For the purpose of this inspection, permanent plant modifications include permanent: plant changes, design changes, set point changes, equivalency evaluations, suitability analyses, and commercial grade dedications.) The list should contain the number of each document, the title, the revision (or date), and the affected system. In addition to the list, please provide a description of each modification and a list of associated

calculations and affected procedures. (2) List of all 10 CFR 50.59 completed evaluations involving: (a) calculations; (b). procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. This list should

include 50.59 evaluations for the following: a. Changes that have been made under the previsions of 10 CFR 50.59 that have been updated in accordance with 10 CFR 50.71(e)(4) since February 13, 2009;

MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST

2 Enclosure b. Modifications that are field work complete; and c. Changes to calculations (or initiation of new calculations) that have been issued. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). The list should NOT include any evaluations in which prior NRC approval was sought and obtained. (3) List of all 10 CFR 50.59 changes that have been screened out as not requiring a full evaluation involving: (a) calculations; (b) procedure revisions; (c) changes to the facility (modifications); (d) non-routine operating configurations; or (e) departures in methods of analyses. The list should contain the number and title of each document, a brief description of the change, and the corresponding number and type of the affected document (i.e., the modification or procedure to which the evaluation applies). (4) List of any modifications, procedure revisions, or UFSAR changes where it was determined that 10 CFR 50.59 did not apply. (5) List of calculation changes that have been issued for use.

(6) List of corrective action documents (open and closed) that address plant permanent modification or 10 CFR 50.59 issues, concerns, or processes. These documents should also include corrective action documents

associated with modification and MOD 50.59 change implementation. The list should contain the number, title and revision (or date) of each document, the affected system and corresponding documentation (if applicable), and should be sorted in order of significance, (7) Copies of procedures addressing the following: modifications, design changes, set point changes, equivalency evaluations or suitability analyses, commercial grade dedications, post-modification testing, 10 CFR 50.59 evaluation and screenings, and UFSAR updates. (8) UFSAR updates submitted in accordance with 10 CFR 50.71(e)(4). Provide copies of the complete submittal. (9) Copy of the UFSAR change log (or a synopsis of changes). This should include all of the changes made to the UFSAR that were incorporated in the last 10 CFR 50.71(e)(4) submittal. (10) Electronic copy of the UFSAR, if available

MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST

3 Enclosure (11) Name(s) and phone numbers for the regulatory and technical contacts. (12) Current management and engineering organizational chart. II. Information Requested to be Available Prior to Inspection (Request will be made by May 14, 2012, for availability of documents by June 11, 2012, [Item 1]) or on First Day of Inspection (June 25, 2012), [Items 2, 3 and 4]

(1) Copies of all selected items from Section I. This includes copies of associated documents such as calculations, post-modification test packages, 10 CFR 50.59 evaluations, or screenings, and any corrective action documents. (2) Copies of these documents do not need to be solely available to the team as long as the inspectors have easy and unrestrained access to them. a. Updated Final Safety Analysis Report; b. Original FSAR Volumes;

c. Original SER and Supplements;

d. FSAR Question and Answers;

e. Quality Assurance Plan;

f. Technical Specifications;

g. Latest IPE/PRA Report; h. Vendor Manuals; and i. The Latest 10 CFR 50.59 FSAR Update Submittal. (3) Please ensure that other supporting documents for the selected items have been located and are readily retrievable as the team will likely be requesting these documents during the inspections. Examples of supporting documents are: a. Drawings supporting the modifications;

b. Procedures affected by the modifications; and

c. UFSAR change papers generated due to a 10 CFR 50.59 evaluation. (4) Current management and engineering organizational chart.

(5) Assessment and corrective Actions: a. The most recent modification (MOD)/50.59 Quality Assurance (QA) audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent MOD/50.59 Quality Assurance (QA) audit and/or self-assessment.

MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST

4 Enclosure III. Information Requested to be provided throughout the inspection

(1) Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection. (2) Copies of the list of questions submitted by the team members and the status/resolution of the information requested (provide daily during the inspection to each team member). If you have questions regarding the information requested, please contact the team leader.

M. Pacilio -2- The lead inspector for this inspection is Mr. Mohammad Munir. We understand that our regulatory contact for this inspection is Mr. Ron Frantz of your organization. If there are any questions about

the inspection or the materials requested, please contact the lead inspector at (630) 829-9797 or via

e-mail at mohammad.munir@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number." In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or

from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,

/RA/

Hironori Peterson, Acting Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-461

License No. NPF-62 Enclosure: MODIFICATION AND 50.59 BASELINE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServŽ

DISTRIBUTION

See next page

DOCUMENT NAME: Ltr. 022812 CLINTON MOD 50 59 RFI MXM.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII

NAME MMunir:ls HPeterson

DATE 02/28/12 02/28/12

OFFICIAL RECORD COPY

Letter to Mr. Michael Pacilio from Mr. Hironori Peterson dated February 28, 2012.

SUBJECT: CLINTON POWER STATION INFORMATION REQUEST FOR AN NRC TRIENNIAL PERMANENT MODIFICATIONS AND 10 CFR 50.59 (MOD/50.59) BASELINE INSPECTION 05000461/2012007(DRS) DISTRIBUTION

Breeda Reilly RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource

Chuck Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck

Allan Barker Carole Ariano

Linda Linn DRSIII DRPIII

Patricia Buckley Tammy Tomczak