          Docket No. 50-454
          Docket No. 50-455
          Commonwealth Edison Company
          ATTN: Mr. Cordell Reed
                  Vice President
          Post Office Box 767
          Chicago, IL 60690
;
~
          Gentlemen:
:
;        This refers to the special safety inspection conducted by Mr. I. T. Yin
  i        of this office on October 3,1985, of activities at Byron Station, Units 1
j
'
          and 2, authorized by NRC Operating License No. NPF-37 and NRC Construction
          Permit No. CPPR-131 and to the discussion of our findings with
i          Mr. G. D. Tolksdorf at the conclusion of the inspection.
          The enclosed copy of our inspection report identifies areas examined during
i
      ,
          the inspection. Within these areas, the inspection consisted of a selective
          examination of procedures and representative records, observations, and
          interviews with personnel.
,
          No' violations of NRC requirements were identified during the course of this
          inspection.
i
i          In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
l          this letter and the enclosures will be placed in the NRC's Public Dccument
j          Room.
I
          We will gladly discuss any questions you have concerning this inspection.
'
                                                      Sincerely,
                                                        ,  ...g 3 g,d b'1 U.U-
                                                            ,
;                                                      J. J. Harrison, Chief
                                                      Engineering Branch
;          Enclosure: Inspection Report
              No. 50-454/85044(DRS);
              No. 50-455/85043(DRS)
          See Attached Distribution
i
s
          PSE'294                                                                              'o
                                                                                          V do/
 
  ,
.
    Commonwealth Edison Company          2
                                                    OCT ? 21985
    Distribution
    cc w/ enclosure:
    D. L. Farrar, Director
      of Nuclear Licensing
    V. I. Schlosser, Project Manager
    Gunner Sorensen, Site Project
      Superintendent
    R. E. Querio, Plant Manager
    DCS/RSB (RIDS)
    Licensing Fee Management Branch
    Resident Inspector, RIII Byron
    Resident Inspector, RIII
      Braidwood
    Phyllis Dunton, Attorney
      General's Office, Environmental
      Control Division
    D. W. Cassel , Jr. , Esq.
    Diane Chavez, DAARE/ SAFE
    W. Daton, ELD
    L. Olshan, NRR LPM
    H. S. Taylor, Quality Assurance
      Division
    RIII            RIII          RII          g
    &ja
    in/k
                      d77fL
                    DaniIslon
                                  hN
                                  E ney  i r ison
    10/22/85          / at                  go I C-
                                                                __.
}}
}}

Latest revision as of 23:29, 22 July 2020

Forwards Safety Insp Repts 50-454/85-44 & 50-455/85-43 on 851003.No Violation Noted
ML20133M995
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/22/1985
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20133M997 List:
References
NUDOCS 8510280347
Download: ML20133M995 (2)


See also: IR 05000454/1985044

Text

. . .. _, . . - . _ . . ..

,

W

l,

1

4 -

l- OCI 221s85

i ,

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

~

Gentlemen:

This refers to the special safety inspection conducted by Mr. I. T. Yin

i of this office on October 3,1985, of activities at Byron Station, Units 1

j

'

and 2, authorized by NRC Operating License No. NPF-37 and NRC Construction

Permit No. CPPR-131 and to the discussion of our findings with

i Mr. G. D. Tolksdorf at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

i

,

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

,

No' violations of NRC requirements were identified during the course of this

inspection.

i

i In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

l this letter and the enclosures will be placed in the NRC's Public Dccument

j Room.

I

We will gladly discuss any questions you have concerning this inspection.

'

Sincerely,

, ...g 3 g,d b'1 U.U-

,

J. J. Harrison, Chief

Engineering Branch

Enclosure
Inspection Report

No. 50-454/85044(DRS);

No. 50-455/85043(DRS)

See Attached Distribution

i

s

PSE'294 'o

V do/

,

.

Commonwealth Edison Company 2

OCT ? 21985

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel , Jr. , Esq.

Diane Chavez, DAARE/ SAFE

W. Daton, ELD

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division

RIII RIII RII g

&ja

in/k

d77fL

DaniIslon

hN

E ney i r ison

10/22/85 / at go I C-