{{#Wiki_filter:*                                    T /fdOS68 ' /d'7                                              oJ .H l                                  DEMONSTRATIVE AID #4 (rnv. 7-13-95)
T DOp CM s E.n.,ED DEW POINT DATA * -- DIESEL AIR' SYSTEM
                                                                              '95 0C? 20 P4 :29 DIESEL 1 A                                                              D' F T ' '    ^ " ~ ' " ~,' ' ' . ' .
DEW POINT DATE"        MWO      DEGREES F        INSTRUMENT                COMMENTS 1-20-89    1-88-09080    27.3,      VP-1114 (CDD 5-2-89) 7-13-88      1-88-02991                                      Air temp high alarm in but detta T only 1 F for both dryers. Replaced consenser fan motor.
thru                                                        Replaced Compressor, Bypassed Fan relay switch, Filled unit with Freon 2-10-89                                                      Installed new Fan cut out switch 2-12-89    1 88-02991    43.9,        VP-1114 (CDD 5-2-89)  Air temp. high alarm still in for dryer K02 3-1-89    1-89-01008          ,78                            Compressor not coming on automatically, fan in a bind.
3-3-89    1-89-01008          ,70                            Compressor Freon was discharged and then recharged. Purged receiver 3-13-89    1 89-01008          , 53.9                        After additional receiver purges.
3-16-89    1-89-00984    22.6, 20.1  VP-1114 (CDD 5-2-89) 5-18-89 1 89-01066        39,78        VP-2466 (CDD 4-4-89)  MWO 1-89-02188 wntten to correct problem with K02 6-21-89:    1-89-02453    48,        VP-2722 (CDD 9-2-89)  K02 dryer will be replaced under MWO 1-89-02188                                            !
7-07-89    1-89-02188        ,48      VP-2721 (CDD 9-2-89)                                                            l 7-30-89    1-89-02798    43,39        VP-2722 (CDD 9-2-89) 8-24-89    1-89-03214    37,35        VP-2721 (CDD 9-2-89)                                                            !
44.5,45 9-27-89    1-89-03652                  VP-2466 (CDD 3-7-90)
                                                                                                                      +
s          :
10-20-89 1-89-04442        38,45        VP-2466 (CDD 3-7-90)                                            h  ,    A  f  l 11-20-89 1-89-05007        40,47      VP-2466 (CDD 3 7 90)                                          ff 12-20-89 1-89-06199        40,37      VP-2466 (CDD 3-7-90) 1-18-90    1-89-06445    44,44 eni>      st      i VP-2466 (CDD 3-7-90)
VP-2710 (CDD 3-6-90) j o    j  0]Y s
2-11-90    1-90-00465    37,37      VP-2466 (CDD 3-7-90)                                          8    0 O ''
ea              1i 3-9-90    1 90-00899      61,66                              As left Dew Point was out of spec.      ef
                                                                                                        @a
                                                                                                              .9 jE j
i 3-12-90    1-90-00899    48,45                                                                      y"g f ,s 3-29-90    1-90-01513    80,60        VP 2466 (CDD 4-7 90)  DC written but rejected by                  h E5E $
SS who said to write MWO.                  j ., O Q 9512280244 950921                                                                                  li: Eejg      l PDR  ADDCK 05000424 O                    PDR                                                                          " } $ 2 b )l bsOO
 
t-          -
4-5-90  1 90-01651  84,67    VP-2466 (CDD 4-7-90) 78,77    VP-2466 (CDD 4-7-90) 83,85    VP-2466 (CDD 4-7-90)
                                                                                                                          *" 4-5-90,18:45-- Diesel Generator 1 A reservoir venting and charging until dewpoint comes into spec. continuing.
4-6-90  1 90-01651  85, 85    VP-2466 (CDD 4-7 90) 85, 85    VP 2466 (CDD 4-7-90) 80,70    VP-2466 (CDD 4-7-90) 80,      VP 2466 (CDD 4-7-90)                    K02 receiver had been bled by mechanics to inspect vessel 75,      VP-1114(CDD 8-3-90) 4-7-90    1 90-01651  75,80      VP-2466 (CDD 4-7-90) 15,33      GE Rental 75,78      VP-1114 (CDD 8-3-90) 4-8-90    1 90-01651  34.2, 33.2  VP-1114 (CDD 8-3-90) 40.3,42.3  FS 3529 Borrowed inst.
35.5, 34    VP-1114 (CDD 8-3-90) 39.2,42.8  FS-3529 Borrowed inst.
4-11 90 1-90-01651    41.3, 36.2  FS3529 Borrowed Inst.                  FS3529 has no official 38.5, 35.8                                          site calibration, not allowed to be used to verify acceptance criteria 5-9-90  1 90-02393                                                      Air Pressure bleeding off Auto drain trap leaking by 5-14-90 1-90-02137    41,43      VP 2721 (CDD 4-10-91) 6-6-90      1 90-02652  12.9,10.6  VP-1114 (CDD 8-3-90) 34.6, 41.4  VP-1114 (CDD 8-3-00)                  Sample taken at new point 7-3-90    1 90-03060  47.5, 38.3  VP-1114 (CDD 8-3-90) 8-10-90 1-90-03369      43.1,35.4  VP-1114 (CDD 9-3-90) 8-25-90 1-90-03699      35.7, 37.8 9-27-90 1-90-03937      41.5, 38.3  VP-1296 (CDD 8-17-91) 10-22 90 1-90-04162    37.7, 33.1  VP-1296 (CDD 817-91) 11-20-90 1 90-04399      39.9, 36.4 VP-1296 (CDD 8-17-91) 12-21-90 1-90-04666      38.5, 35.6                                                                                  i KEY: Dew points: Dryer K01 (left), Dryer K02 (right)
Bold Dew Point = Out of Specification      .
CDD = Calibration Due Date Maximum Allowable Dew Point is 50 F Minimum Theoretical Value is 32 F
* Data from GPC MWO's & MWO Listing                          ,
                                                                                                                      " Date from GPC MWO's & MWO Listing (Technician initials, dates from work performed block of MWO)          ;
                                                                                                                      "* Data from Exhibit # 80, " War Room Unit 1 Refueling          i Outage Log , project pa9e 064035                            !
MWO = Maintenance Work Order                                l l
l l
 
DEMONSTRATIVE AID #4 (rev 7-13-95)
DEW POINT DATA * -- DIESEL AIR SYSTEM DIESEL 1B DEW POINT DATE"      MWO      DEGREES F      INSTRUMENT                      COMMENTS 1-12-89 1-88-08981    28.7, 27.3  VP-1114 (CDD 4-29-89) 2-24-89 1-89-00822      19,19.1    VP-1114 (CDD 4-29-89)  Previous dew points <32F are incorrect 3-1 89  1-89-00988    45.6, 33.8  VP-1114 (CDD 4-29-89) 3-8-89  1-89-01066    -2, -12    VP-2466 (CDD 4-4-89) 3-22-89 1-89-01066      -15,-27    VP-2466 (CDD 4-4-89) 5-17-89 1-89-01066      47,45      VP-2466 (CDD 4-4-89) 6-21-89 1 89-02459      48,45      VP-2722(CDD 9-2-89) 7-28-89 1-89-02800      47,37      VP-2722(CDD 9-2-89) 8-16-89 1-89-03217      38,41                                                                                1 8-22-89 1-89-03314      45,42      VP-2721(CDD 9-2-89) 9-27-89 1-89-03656      47,45      VP-2466(CDD 3-7-90) 10-20-89 1-89-04446    41,44      VP-2466(CDD 3-7-90) 11-13-89 1-89-05009    38,32      VP-2466(CDD 3-7-90) 12-18-89 1-89-06200    37,33      VP-2466(CDD 3-7 90) 1-8-90    1-89-06446  32.32 2-11 90 1-90-00466      37,37 3-9-90    1-90-00900  45,                                Dryer 2 out of service, could not be tested due to
                                        ,47                          equip. clearance. Dryer 2 tested 3-12-90 3-29-90 1-90-01514    37,34      VP-2466(CDD 4-7-90) 4-5-90    1-90-01770  84,82      VP-2466(CDD 4-7-90)    DC 1-90-186 written WRT# 08885 wntten 4-7-90    1 90-01770  85,75      VP-2466(CDD 4-7-90) 18,18      GE Rental 80,82      VP-1114 (CDD 8-3-90)                                                      l I
i i
J
 
                ~
4-8-90    1 90-01770  44.5, 36.6      VP-1114 (CDD 8-3-90) 45.9,40.8      FS3529                        FS3529 his no officirl
* site calibration, not allowed to be used to verify acceptance
,                                                                                                                        criteria 4 9-90    1-90-01788                                                Void, instrument Out of calibration                                !
4-10-90 1 90-01770  42.5,41.4 5-10-90 1 90-02391                                                  Air Pressure bleeding off                    >
Auto drain trap leaking by Reworked, MER 4
6-12-90 1-90-02138    43,43        VP-2721 (CDD 4-10-91) 6-22-90 1 90-02901      80.2, 44.2 VP-1114 (CDD 8-3-93)              Dryer K01 found not running 7-21-90 1 90-03216    43.9,41.5 VP-1114 (CDD 8-3-90) 8-14-90 1-90-03585    32.2, 32.7 VP-1114 (CDD 9-3-90)
$                                                    9-12-90 1 90-03807    46.6,41.5 VP-1296 (CDD 8-17-91)
;                                                    10-8-90 1 90-04043    -43.5, 46.8 11 9-90 1-90-04257    43.2, 60      VP-1296 (CDD 8-17-91)          K02 fan motor not running, Hold Tag on Systen
                                                                                ,40.6      VP-1296 (CDD 8-17-91)
                                                                                , 64.4    VP-1296 (CDD 8-17-91)          Dewpoint drifted up.
Found MWO 1-90-04394 written against dryer, dryer 4                                                                                                                          inoperable
.                                                    11-7 90 1-90-04394                                                Installed new fan motor, new compressor, new fan switch, and recharged freon. Receiver
,                                                                                                                        blowdown initiated.
11-15-90 1-90-04394          , 60.2 VP 1296 (CDD 8-17-91)
                                                                                  , 70.8 VP-1296 (CDD 817-91)                                                          1 11 23-90 1-90-04394            ,46.9  VP-1296 (CDD 8-17-91)        After additional receiver blowdowns 11-26-90 1 90-04515    48.2,44.9 1
12-31-90 1 90-04870    42.6,40.2 VP-1296 (CDD 8-17 91)                                                            1 KEY: Dew points: Dryer K01 (left), Dryer K02 (right)
Bold Dew Point = Out of Specification                l CDD = Calibration Due Date Maximum Allowable Dew Point is 50 F Minimum Theoretical Value is 32 F
* Data from GPC MWO's & MWO Listing
                                                                                                          ** Date from GPC MWO's & MWO Listing (Technician initials, dates from work performed block of MWO)
MWO = Maintenance Work Order
 
l
  .                        DEMONSTRATIVE AlD #4 (rev. 7-13-95)                                          )
DEW POINT DATA * -- DIESEL AIR SYSTEM DIESEL 2A DEW POINT DK E"        MWO      DEGREES F      INSTRUMENT                        COMMENTS                l 3-13-89    2-89-01855    45.4,47.7    VP-1114 (CDD 5-2-89) 4-17 89    2-89-02500    50.2, 50.8  VP-1114 (CDD 5-2-89) 6-21-89    2-89-03859  -13.5,-11.5  VP-2722 (CDD 9-2-89)      Values voided 2-89-04592 7-13-89  2-89-04220    35,48        VP-2722 (CDD 9-2-89) 8-1-89  2-89-04592      49,48        VP-2722 (CDD 9-2-89) 8-10-89  2-89-04564    40,40        VP-2722 (CDD 9-2-89) 9-23-89  2-89-04986    43,47 10-20-89 2-89-05436    46,49        VP-2466 11-19-89 2-89-05887    33,33        VP-2466 (CDD 3-7 90) 12-5-89  2-89-06178                                            Dryers short cycling, Found Supply breaker tripped, Unit continued tripping on high temp Cooling fan not operating, replaced 12-19-89 2-89-06450      42,42        VP-2466 (CDD 3-7-90) 1-22-90    2-89-06680    15,16        VP-2624 (CDD 3-21-90)    Noted Out Of Spec., took readings on freon side of dryer detta T only 12 F, delta P low 1-25-90    2-89-06680    42,44        VP-2466 (CDD 3-7 90) 2-17-90    2-90-00361    49,44        VP-2466 (CDD 3-7-90) 3-2-90    2-90-00282                                          Compression unit has excessive noise and vibration, fan discovered installed backwards, corrected 3-2-91 3-15-90    2-90-00666    32,35 4-7-90    2-90-00964    85,95      VP-2466 (CDD 4-7-90) 30,30        GE Rental 82,85        VP-1114 ( CDD 8-3-90) 4-8-90    2-90-00964    39.7, 61.4  FS-3529 Borrowed Inst.
43.9, 60.9  VP-1114 (CDD 8-3-90) 4-9-90    2-90-00964        ,61.6  VP-1114 (CDD 8-3-90)
                                ,49.6    FS-3529                  No site Cat
 
    ~
4-10-90    2-90-00964    69.6, 64.1  VP-1114 (CDD 8-3-90) 61.5, 50.9    FS-3529                      No Site Cal.
4-11 90    2-90-00964    57.4, 62.6  VP-1114 (CDD 8-3-90)            K01- dew point was taken after Ops. bled 57.2, 54.1    FS-3529                        pressure on associated receiver tank and allowed compressor to run (approx 2 hrs.)
No Site Cal. on FS-3529 4-9-90    2-90-01035                                                High air temp alarm for both 2A air dryers. MWO voided 4-9-90.
j  4-12-90    2-90-01139                                                Air dryer does not appear to be              l working property. Acceptable reading          ;
obtained 4-14-90. MWO voided 4-20-90 4-14-90    2-90-00964  43.8,47.3    VP-1114 (CDD 8-3-90) 4 5-12-90    2-90-01299  45,43        VP-2721 (CDD 4-10-91) 6-7 90    2-90-01786    40.5,44.3    VP-1114 (CDD 8-3-90)                                                        :
7-3  2-90-02503  46.2,37.3    VP-1114 (CDD 8-3-90) 8-10-90  2-90-03203    35.7, 64.5    VP-1114 (CDD 8-3-90)              Initiated receiver blowdown (not logged)    VP 1114 (CDD 8-3-90)            Recheck failed, WRT 10413
!    8-25-90  2 90-03648    38.9,41.1    EG&G 10-4-90  2-90-04070    74.1, 84.3                                      Receiver blowdown initiated 10-5-90  2-90-04070    48.1,48.7 10-22-90 2-90-04858    46.1,46.9    VP-1296 (CDD 8-17-91) 11 20-90 2-90-05297    48.5,46.6    VP-1296 (CDD 817-91) 12-21-90 2-90-05671      Not Provided  Not provided a
KEY: Dew points: Dryer K01 (left), Dryer K02 (right)
Bold Dew Point = Out of Specification CDD = Calibration Due Date Maximum Allowable Dew Point is 50 F Minimum Theoretical Value is 32 F
* Data from GPC MWO's & MWO Listing
                                                          " Date from GPC MWO's & MWO Listing (Technician initials, dates from work performed block of MWO)          i MWO = Maintenance Work Order
 
l
  .                      DEMONSTRATIVE AlD #4 (rev. 7-13-95)
DEW POINT DATA * -- DIESEL AIR SYSTEM DIESEL 2B DEW POINT                                                          ;
DATE**    MWO        DEGREES F      INSTRUMENT                  COMMENTS 3-14-89  2-89-01855    45.4,47.7  VP 1114 (CDD 5-2-89) 3-16-89  2-89-02080    40,43.2    VP-1114 (CDD 5-2-89) 6-20-89  2-89-03858    35,36      VP-2722 (CDD 9-2-89)  Fans in auto, not running 7-16-89    2-89-04219    44,42 8-22-89  2-89-04560    38,40        VP-2722 (CDD 9-2-89) 9-23-89  2-89-04984    45,45 10-20-89  2-89-05435    41,44        VP-2466 11-17-89  2-89-05790    34,38      VP-2466 (CDD 3-7-90)    Initial reading was 17 DC-2-89-1502 12-06-89  2-89-06193    35,50        VP-2466 (CDD 3-7-90)    Initial readings of 7,19 had been improperty converted 01-03-90  2-89-06585    44,47      VP-2466 (CDD 3-7-90)
VP-2623 (CDD 3-6-90) 02-02-90  2-90-00145    45,45 03-02-90  2-90-00560    34,36      VP-2466 (CDD 3-7-90) 04-02-90  2-90-00813    41,44 04-07-90  2-90-01021    75,80      VP-2466 (CDD 4-7-90)
                          -10,10      GE Rental 85,80      VP-1114 (CDD 8-3-90) 4-8-90  2-90-01021    39.5,44.6  FS-3529 Borrowed inst. FS3529 has no official site calibration.
33.7,44.4  VP-1114 (CDD 8-3-90) 4-10-90  2-90-01021    39.0,43.2    VP-1114 (CDD B-3-90) 36.3,40.3  FS-3529 Borrowed inst.
5-14-90  2-90-01196    43,45      VP-2721 (CDD 4-10-91) 6-22-90  2-90-02193    32.7, 34    VP-1114 (CDD 8-3-90) 7-21-90  2 90-02891    42.2,49.5    VP-1114 (CDD 8-3-90)
 
8-14 90  2-90-03446    40.2,44.3  VP-1114 (CDD 9 3-90) 9-12 90  2-90-03866    42.6,47.8  VP-1296 (CDD 8-17-91) 10-7 90    2-90-04432  74.8,43.7  VP-1296 (CDD 817-91)              Receiver b!owdown init.
78.4,      VP-1296 (CDD 8-17-91) 10-11-90  2-90-04432    78,        VP 1296 (CDD 8-17-91)            Drained 1 gallon water from dryer Wrote DC-2-90-231 10-24-90  2-90-04839    58.9,    VP-1296 (CDD 8-17-91) 38.4,    VP.1296 (CDD 8-17 91) '          10-26-90 11 05-90  2-90-05015    48,49.5    VP-1296 (CDD 8-17-91) 12-04-90  2-90-05441    49.8,44.5  VP-1296 (CDD 8-17 91)              Informed SE DP close to limit, no action taken 12-31-90  2-90-05798    42,45.1    VP-1296 (CDD 8-17-91)
KEY: Dew points: Dryer K01 (left), Dryer K02 (right)
Bold Dew Point = Out of Specification CDD = Calibration Due Date                    ,
Maximum Allowable Dew Point is 50F Minimum Theoretical Value is 32 F
* Data from GPC MWO's & MWO Listing
                                                ** Date from GPC MWO's & MWO Listing (Technician initials, dates from work performed block of MWO)
MWO = Maintenance Work Order}}

Revision as of 05:25, 12 May 2020

Intervenor Exhibit I-MOSBA-169,consisting of Demonstrative Aid 4 (Rev 950713) Re Dew Point Data,Diesel Air Sys
ML20099L405
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/21/1995
From:
AFFILIATION NOT ASSIGNED
To:
References
OLA-3-I-MOS-169, NUDOCS 9512280244
Download: ML20099L405 (8)


Text

  • T /fdOS68 ' /d'7 oJ .H l DEMONSTRATIVE AID #4 (rnv. 7-13-95)

T DOp CM s E.n.,ED DEW POINT DATA * -- DIESEL AIR' SYSTEM

'95 0C? 20 P4 :29 DIESEL 1 A D' F T ' ' ^ " ~ ' " ~,' ' ' . ' .

DEW POINT DATE" MWO DEGREES F INSTRUMENT COMMENTS 1-20-89 1-88-09080 27.3, VP-1114 (CDD 5-2-89) 7-13-88 1-88-02991 Air temp high alarm in but detta T only 1 F for both dryers. Replaced consenser fan motor.

thru Replaced Compressor, Bypassed Fan relay switch, Filled unit with Freon 2-10-89 Installed new Fan cut out switch 2-12-89 1 88-02991 43.9, VP-1114 (CDD 5-2-89) Air temp. high alarm still in for dryer K02 3-1-89 1-89-01008 ,78 Compressor not coming on automatically, fan in a bind.

3-3-89 1-89-01008 ,70 Compressor Freon was discharged and then recharged. Purged receiver 3-13-89 1 89-01008 , 53.9 After additional receiver purges.

3-16-89 1-89-00984 22.6, 20.1 VP-1114 (CDD 5-2-89) 5-18-89 1 89-01066 39,78 VP-2466 (CDD 4-4-89) MWO 1-89-02188 wntten to correct problem with K02 6-21-89: 1-89-02453 48, VP-2722 (CDD 9-2-89) K02 dryer will be replaced under MWO 1-89-02188  !

7-07-89 1-89-02188 ,48 VP-2721 (CDD 9-2-89) l 7-30-89 1-89-02798 43,39 VP-2722 (CDD 9-2-89) 8-24-89 1-89-03214 37,35 VP-2721 (CDD 9-2-89)  !

44.5,45 9-27-89 1-89-03652 VP-2466 (CDD 3-7-90)

+

s  :

10-20-89 1-89-04442 38,45 VP-2466 (CDD 3-7-90) h , A f l 11-20-89 1-89-05007 40,47 VP-2466 (CDD 3 7 90) ff 12-20-89 1-89-06199 40,37 VP-2466 (CDD 3-7-90) 1-18-90 1-89-06445 44,44 eni> st i VP-2466 (CDD 3-7-90)

VP-2710 (CDD 3-6-90) j o j 0]Y s

2-11-90 1-90-00465 37,37 VP-2466 (CDD 3-7-90) 8 0 O

ea 1i 3-9-90 1 90-00899 61,66 As left Dew Point was out of spec. ef

@a

.9 jE j

i 3-12-90 1-90-00899 48,45 y"g f ,s 3-29-90 1-90-01513 80,60 VP 2466 (CDD 4-7 90) DC written but rejected by h E5E $

SS who said to write MWO. j ., O Q 9512280244 950921 li: Eejg l PDR ADDCK 05000424 O PDR " } $ 2 b )l bsOO

t- -

4-5-90 1 90-01651 84,67 VP-2466 (CDD 4-7-90) 78,77 VP-2466 (CDD 4-7-90) 83,85 VP-2466 (CDD 4-7-90)

  • " 4-5-90,18:45-- Diesel Generator 1 A reservoir venting and charging until dewpoint comes into spec. continuing.

4-6-90 1 90-01651 85, 85 VP-2466 (CDD 4-7 90) 85, 85 VP 2466 (CDD 4-7-90) 80,70 VP-2466 (CDD 4-7-90) 80, VP 2466 (CDD 4-7-90) K02 receiver had been bled by mechanics to inspect vessel 75, VP-1114(CDD 8-3-90) 4-7-90 1 90-01651 75,80 VP-2466 (CDD 4-7-90) 15,33 GE Rental 75,78 VP-1114 (CDD 8-3-90) 4-8-90 1 90-01651 34.2, 33.2 VP-1114 (CDD 8-3-90) 40.3,42.3 FS 3529 Borrowed inst.

35.5, 34 VP-1114 (CDD 8-3-90) 39.2,42.8 FS-3529 Borrowed inst.

4-11 90 1-90-01651 41.3, 36.2 FS3529 Borrowed Inst. FS3529 has no official 38.5, 35.8 site calibration, not allowed to be used to verify acceptance criteria 5-9-90 1 90-02393 Air Pressure bleeding off Auto drain trap leaking by 5-14-90 1-90-02137 41,43 VP 2721 (CDD 4-10-91) 6-6-90 1 90-02652 12.9,10.6 VP-1114 (CDD 8-3-90) 34.6, 41.4 VP-1114 (CDD 8-3-00) Sample taken at new point 7-3-90 1 90-03060 47.5, 38.3 VP-1114 (CDD 8-3-90) 8-10-90 1-90-03369 43.1,35.4 VP-1114 (CDD 9-3-90) 8-25-90 1-90-03699 35.7, 37.8 9-27-90 1-90-03937 41.5, 38.3 VP-1296 (CDD 8-17-91) 10-22 90 1-90-04162 37.7, 33.1 VP-1296 (CDD 817-91) 11-20-90 1 90-04399 39.9, 36.4 VP-1296 (CDD 8-17-91) 12-21-90 1-90-04666 38.5, 35.6 i KEY: Dew points: Dryer K01 (left), Dryer K02 (right)

Bold Dew Point = Out of Specification .

CDD = Calibration Due Date Maximum Allowable Dew Point is 50 F Minimum Theoretical Value is 32 F

  • Data from GPC MWO's & MWO Listing ,

" Date from GPC MWO's & MWO Listing (Technician initials, dates from work performed block of MWO)  ;

"* Data from Exhibit # 80, " War Room Unit 1 Refueling i Outage Log , project pa9e 064035  !

MWO = Maintenance Work Order l l

l l

DEMONSTRATIVE AID #4 (rev 7-13-95)

DEW POINT DATA * -- DIESEL AIR SYSTEM DIESEL 1B DEW POINT DATE" MWO DEGREES F INSTRUMENT COMMENTS 1-12-89 1-88-08981 28.7, 27.3 VP-1114 (CDD 4-29-89) 2-24-89 1-89-00822 19,19.1 VP-1114 (CDD 4-29-89) Previous dew points <32F are incorrect 3-1 89 1-89-00988 45.6, 33.8 VP-1114 (CDD 4-29-89) 3-8-89 1-89-01066 -2, -12 VP-2466 (CDD 4-4-89) 3-22-89 1-89-01066 -15,-27 VP-2466 (CDD 4-4-89) 5-17-89 1-89-01066 47,45 VP-2466 (CDD 4-4-89) 6-21-89 1 89-02459 48,45 VP-2722(CDD 9-2-89) 7-28-89 1-89-02800 47,37 VP-2722(CDD 9-2-89) 8-16-89 1-89-03217 38,41 1 8-22-89 1-89-03314 45,42 VP-2721(CDD 9-2-89) 9-27-89 1-89-03656 47,45 VP-2466(CDD 3-7-90) 10-20-89 1-89-04446 41,44 VP-2466(CDD 3-7-90) 11-13-89 1-89-05009 38,32 VP-2466(CDD 3-7-90) 12-18-89 1-89-06200 37,33 VP-2466(CDD 3-7 90) 1-8-90 1-89-06446 32.32 2-11 90 1-90-00466 37,37 3-9-90 1-90-00900 45, Dryer 2 out of service, could not be tested due to

,47 equip. clearance. Dryer 2 tested 3-12-90 3-29-90 1-90-01514 37,34 VP-2466(CDD 4-7-90) 4-5-90 1-90-01770 84,82 VP-2466(CDD 4-7-90) DC 1-90-186 written WRT# 08885 wntten 4-7-90 1 90-01770 85,75 VP-2466(CDD 4-7-90) 18,18 GE Rental 80,82 VP-1114 (CDD 8-3-90) l I

i i

J

~

4-8-90 1 90-01770 44.5, 36.6 VP-1114 (CDD 8-3-90) 45.9,40.8 FS3529 FS3529 his no officirl

  • site calibration, not allowed to be used to verify acceptance

, criteria 4 9-90 1-90-01788 Void, instrument Out of calibration  !

4-10-90 1 90-01770 42.5,41.4 5-10-90 1 90-02391 Air Pressure bleeding off >

Auto drain trap leaking by Reworked, MER 4

6-12-90 1-90-02138 43,43 VP-2721 (CDD 4-10-91) 6-22-90 1 90-02901 80.2, 44.2 VP-1114 (CDD 8-3-93) Dryer K01 found not running 7-21-90 1 90-03216 43.9,41.5 VP-1114 (CDD 8-3-90) 8-14-90 1-90-03585 32.2, 32.7 VP-1114 (CDD 9-3-90)

$ 9-12-90 1 90-03807 46.6,41.5 VP-1296 (CDD 8-17-91)

10-8-90 1 90-04043 -43.5, 46.8 11 9-90 1-90-04257 43.2, 60 VP-1296 (CDD 8-17-91) K02 fan motor not running, Hold Tag on Systen

,40.6 VP-1296 (CDD 8-17-91)

, 64.4 VP-1296 (CDD 8-17-91) Dewpoint drifted up.

Found MWO 1-90-04394 written against dryer, dryer 4 inoperable

. 11-7 90 1-90-04394 Installed new fan motor, new compressor, new fan switch, and recharged freon. Receiver

, blowdown initiated.

11-15-90 1-90-04394 , 60.2 VP 1296 (CDD 8-17-91)

, 70.8 VP-1296 (CDD 817-91) 1 11 23-90 1-90-04394 ,46.9 VP-1296 (CDD 8-17-91) After additional receiver blowdowns 11-26-90 1 90-04515 48.2,44.9 1

12-31-90 1 90-04870 42.6,40.2 VP-1296 (CDD 8-17 91) 1 KEY: Dew points: Dryer K01 (left), Dryer K02 (right)

Bold Dew Point = Out of Specification l CDD = Calibration Due Date Maximum Allowable Dew Point is 50 F Minimum Theoretical Value is 32 F

  • Data from GPC MWO's & MWO Listing
    • Date from GPC MWO's & MWO Listing (Technician initials, dates from work performed block of MWO)

MWO = Maintenance Work Order

l

. DEMONSTRATIVE AlD #4 (rev. 7-13-95) )

DEW POINT DATA * -- DIESEL AIR SYSTEM DIESEL 2A DEW POINT DK E" MWO DEGREES F INSTRUMENT COMMENTS l 3-13-89 2-89-01855 45.4,47.7 VP-1114 (CDD 5-2-89) 4-17 89 2-89-02500 50.2, 50.8 VP-1114 (CDD 5-2-89) 6-21-89 2-89-03859 -13.5,-11.5 VP-2722 (CDD 9-2-89) Values voided 2-89-04592 7-13-89 2-89-04220 35,48 VP-2722 (CDD 9-2-89) 8-1-89 2-89-04592 49,48 VP-2722 (CDD 9-2-89) 8-10-89 2-89-04564 40,40 VP-2722 (CDD 9-2-89) 9-23-89 2-89-04986 43,47 10-20-89 2-89-05436 46,49 VP-2466 11-19-89 2-89-05887 33,33 VP-2466 (CDD 3-7 90) 12-5-89 2-89-06178 Dryers short cycling, Found Supply breaker tripped, Unit continued tripping on high temp Cooling fan not operating, replaced 12-19-89 2-89-06450 42,42 VP-2466 (CDD 3-7-90) 1-22-90 2-89-06680 15,16 VP-2624 (CDD 3-21-90) Noted Out Of Spec., took readings on freon side of dryer detta T only 12 F, delta P low 1-25-90 2-89-06680 42,44 VP-2466 (CDD 3-7 90) 2-17-90 2-90-00361 49,44 VP-2466 (CDD 3-7-90) 3-2-90 2-90-00282 Compression unit has excessive noise and vibration, fan discovered installed backwards, corrected 3-2-91 3-15-90 2-90-00666 32,35 4-7-90 2-90-00964 85,95 VP-2466 (CDD 4-7-90) 30,30 GE Rental 82,85 VP-1114 ( CDD 8-3-90) 4-8-90 2-90-00964 39.7, 61.4 FS-3529 Borrowed Inst.

43.9, 60.9 VP-1114 (CDD 8-3-90) 4-9-90 2-90-00964 ,61.6 VP-1114 (CDD 8-3-90)

,49.6 FS-3529 No site Cat

~

4-10-90 2-90-00964 69.6, 64.1 VP-1114 (CDD 8-3-90) 61.5, 50.9 FS-3529 No Site Cal.

4-11 90 2-90-00964 57.4, 62.6 VP-1114 (CDD 8-3-90) K01- dew point was taken after Ops. bled 57.2, 54.1 FS-3529 pressure on associated receiver tank and allowed compressor to run (approx 2 hrs.)

No Site Cal. on FS-3529 4-9-90 2-90-01035 High air temp alarm for both 2A air dryers. MWO voided 4-9-90.

j 4-12-90 2-90-01139 Air dryer does not appear to be l working property. Acceptable reading  ;

obtained 4-14-90. MWO voided 4-20-90 4-14-90 2-90-00964 43.8,47.3 VP-1114 (CDD 8-3-90) 4 5-12-90 2-90-01299 45,43 VP-2721 (CDD 4-10-91) 6-7 90 2-90-01786 40.5,44.3 VP-1114 (CDD 8-3-90)  :

7-3 2-90-02503 46.2,37.3 VP-1114 (CDD 8-3-90) 8-10-90 2-90-03203 35.7, 64.5 VP-1114 (CDD 8-3-90) Initiated receiver blowdown (not logged) VP 1114 (CDD 8-3-90) Recheck failed, WRT 10413

! 8-25-90 2 90-03648 38.9,41.1 EG&G 10-4-90 2-90-04070 74.1, 84.3 Receiver blowdown initiated 10-5-90 2-90-04070 48.1,48.7 10-22-90 2-90-04858 46.1,46.9 VP-1296 (CDD 8-17-91) 11 20-90 2-90-05297 48.5,46.6 VP-1296 (CDD 817-91) 12-21-90 2-90-05671 Not Provided Not provided a

KEY: Dew points: Dryer K01 (left), Dryer K02 (right)

Bold Dew Point = Out of Specification CDD = Calibration Due Date Maximum Allowable Dew Point is 50 F Minimum Theoretical Value is 32 F

  • Data from GPC MWO's & MWO Listing

" Date from GPC MWO's & MWO Listing (Technician initials, dates from work performed block of MWO) i MWO = Maintenance Work Order

l

. DEMONSTRATIVE AlD #4 (rev. 7-13-95)

DEW POINT DATA * -- DIESEL AIR SYSTEM DIESEL 2B DEW POINT  ;

DATE** MWO DEGREES F INSTRUMENT COMMENTS 3-14-89 2-89-01855 45.4,47.7 VP 1114 (CDD 5-2-89) 3-16-89 2-89-02080 40,43.2 VP-1114 (CDD 5-2-89) 6-20-89 2-89-03858 35,36 VP-2722 (CDD 9-2-89) Fans in auto, not running 7-16-89 2-89-04219 44,42 8-22-89 2-89-04560 38,40 VP-2722 (CDD 9-2-89) 9-23-89 2-89-04984 45,45 10-20-89 2-89-05435 41,44 VP-2466 11-17-89 2-89-05790 34,38 VP-2466 (CDD 3-7-90) Initial reading was 17 DC-2-89-1502 12-06-89 2-89-06193 35,50 VP-2466 (CDD 3-7-90) Initial readings of 7,19 had been improperty converted 01-03-90 2-89-06585 44,47 VP-2466 (CDD 3-7-90)

VP-2623 (CDD 3-6-90) 02-02-90 2-90-00145 45,45 03-02-90 2-90-00560 34,36 VP-2466 (CDD 3-7-90) 04-02-90 2-90-00813 41,44 04-07-90 2-90-01021 75,80 VP-2466 (CDD 4-7-90)

-10,10 GE Rental 85,80 VP-1114 (CDD 8-3-90) 4-8-90 2-90-01021 39.5,44.6 FS-3529 Borrowed inst. FS3529 has no official site calibration.

33.7,44.4 VP-1114 (CDD 8-3-90) 4-10-90 2-90-01021 39.0,43.2 VP-1114 (CDD B-3-90) 36.3,40.3 FS-3529 Borrowed inst.

5-14-90 2-90-01196 43,45 VP-2721 (CDD 4-10-91) 6-22-90 2-90-02193 32.7, 34 VP-1114 (CDD 8-3-90) 7-21-90 2 90-02891 42.2,49.5 VP-1114 (CDD 8-3-90)

8-14 90 2-90-03446 40.2,44.3 VP-1114 (CDD 9 3-90) 9-12 90 2-90-03866 42.6,47.8 VP-1296 (CDD 8-17-91) 10-7 90 2-90-04432 74.8,43.7 VP-1296 (CDD 817-91) Receiver b!owdown init.

78.4, VP-1296 (CDD 8-17-91) 10-11-90 2-90-04432 78, VP 1296 (CDD 8-17-91) Drained 1 gallon water from dryer Wrote DC-2-90-231 10-24-90 2-90-04839 58.9, VP-1296 (CDD 8-17-91) 38.4, VP.1296 (CDD 8-17 91) ' 10-26-90 11 05-90 2-90-05015 48,49.5 VP-1296 (CDD 8-17-91) 12-04-90 2-90-05441 49.8,44.5 VP-1296 (CDD 8-17 91) Informed SE DP close to limit, no action taken 12-31-90 2-90-05798 42,45.1 VP-1296 (CDD 8-17-91)

KEY: Dew points: Dryer K01 (left), Dryer K02 (right)

Bold Dew Point = Out of Specification CDD = Calibration Due Date ,

Maximum Allowable Dew Point is 50F Minimum Theoretical Value is 32 F

  • Data from GPC MWO's & MWO Listing
    • Date from GPC MWO's & MWO Listing (Technician initials, dates from work performed block of MWO)

MWO = Maintenance Work Order