ML20066J387: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:~
Ol8Qi8ASIE M                          ['l,* L"l" "'"" "*""
s~wna;,n n n maa DetN.
: u.    .D
                  *~Mu.
t'l 14
                          .. t "                                                                  ''
February 8, 1991 U. S. Nuclear Regulatory Conmission Attn:          Document Control Desk Washington, DC                  20555
 
==Reference:==
Beaver Valley Pover Station, Unit No. 2 Docket No. 50-412, License No. NPT-73 Subject                  Second Refueling Outage Inservice Inspection Report This letter forwards the Inservice Inspection Report on ASME Class 1,                2,    and 3 components examined during the second refueling outage at Beaver Valley Unit No. 2.                              The ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6230 requires that an inservice inspection report be submitted to the enforcement and regulatory authority having jurisdiction at the plant site within ninety (90) days after completion of an inservice inspection.                                    The latest inservice inspections at Beaver Valley Unit No. 2 were completed on November 15, 1990.
These examinations are part of Interval 1, Period 1 of the Beaver Valley Unit No. 2 ISI inspection schedule. The inservice inspections were performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code, 1983 edition through Summer 1983 agenda, please          contact me or members of                my    staff    if you  have any
,    questions regarding the attached report.
Sincerely,
                                                                      /        i
                                                                          . D. Sieber Vice President
      .,                                                              Nuclear Group Attachment cc:          Mr. J.        Beall, Sr. Resident Inspector                                          l Mr. T. T. Martin, NRC Region I Administrator                                        l' Mr.      A. W. DeAgazio, Project Manager 1
0 9102260108 910208                                                        ,
PDR      ADOCK 0500041?                                                      \\\
O                            P D'<                                      'k O. . , s ,:
          .}}

Latest revision as of 08:20, 21 December 2020

Forwards Second Refueling Outage Inservice Insp Rept for Period 890602-901115
ML20066J387
Person / Time
Site: Beaver Valley
Issue date: 02/08/1991
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20066J388 List:
References
NUDOCS 9102260108
Download: ML20066J387 (1)


Text

~

Ol8Qi8ASIE M ['l,* L"l" "'"" "*""

s~wna;,n n n maa DetN.

u. .D
  • ~Mu.

t'l 14

.. t "

February 8, 1991 U. S. Nuclear Regulatory Conmission Attn: Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Pover Station, Unit No. 2 Docket No. 50-412, License No. NPT-73 Subject Second Refueling Outage Inservice Inspection Report This letter forwards the Inservice Inspection Report on ASME Class 1, 2, and 3 components examined during the second refueling outage at Beaver Valley Unit No. 2. The ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6230 requires that an inservice inspection report be submitted to the enforcement and regulatory authority having jurisdiction at the plant site within ninety (90) days after completion of an inservice inspection. The latest inservice inspections at Beaver Valley Unit No. 2 were completed on November 15, 1990.

These examinations are part of Interval 1, Period 1 of the Beaver Valley Unit No. 2 ISI inspection schedule. The inservice inspections were performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code, 1983 edition through Summer 1983 agenda, please contact me or members of my staff if you have any

, questions regarding the attached report.

Sincerely,

/ i

. D. Sieber Vice President

., Nuclear Group Attachment cc: Mr. J. Beall, Sr. Resident Inspector l Mr. T. T. Martin, NRC Region I Administrator l' Mr. A. W. DeAgazio, Project Manager 1

0 9102260108 910208 ,

PDR ADOCK 0500041? \\\

O P D'< 'k O. . , s ,:

.