ML19324E807: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML19324E807 | |||
| issue date = 11/20/2019 | |||
| title = Cyber Security Inspection Report 05000266/2019412 and 05000301/2019412 (Letter Only) | |||
| author name = Daley R | |||
| author affiliation = NRC/RGN-III/DRS/EB3 | |||
| addressee name = Craven R | |||
| addressee affiliation = NextEra Energy Point Beach, LLC | |||
| docket = 05000266, 05000301 | |||
| license number = DPR-024, DPR-027 | |||
| contact person = | |||
| document report number = IR 2019412 | |||
| document type = Letter | |||
| page count = 3 | |||
}} | |||
See also: [[see also::IR 05000266/2019412]] | |||
=Text= | |||
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
November 20, 2019 | |||
Mr. Robert Craven | |||
Site Director | |||
NextEra Energy Point Beach, LLC | |||
6610 Nuclear Road | |||
Two Rivers, WI 54241-9516 | |||
SUBJECT: POINT BEACH NUCLEAR POWER PLANT - CYBER SECURITY INSPECTION | |||
REPORT 05000266/2019412 AND 05000301/2019412 | |||
Dear Mr. Craven: | |||
On October 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection | |||
at Point Beach and discussed the results of this inspection with Mr. Tim Lesniak and other | |||
members of your staff. The results of this inspection are documented in the enclosed report. | |||
One finding of very low security significance (Green) is documented in this report. This finding | |||
involved a violation of NRC requirements. We are treating this violation as a non-cited violation | |||
(NCV) consistent with Section 2.3.2 of the Enforcement Policy. | |||
If you contest the violation or significance or severity of the violation documented in this | |||
inspection report, you should provide a response within 30 days of the date of this inspection | |||
report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: | |||
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional | |||
Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear | |||
Security and Incident Response; and the NRC Resident Inspector at Point Beach. | |||
The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter | |||
0310 Aspects Within Cross Cutting Areas: one [H.8] - Procedure Adherence. | |||
If you disagree with a cross-cutting aspect assignment in this report, you should provide a | |||
response within 30 days of the date of this inspection report, with the basis for your | |||
disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, | |||
Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, | |||
Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Point | |||
Beach. | |||
The enclosed report contains Security-Related Information, so the enclosed report will not be | |||
made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a | |||
response that contains Security-Related Information, please mark your entire response | |||
Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in | |||
accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
R. Craven 2 | |||
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in | |||
accordance with 10 CFR 2.390(b)(1)(ii). | |||
Sincerely, | |||
/RA/ | |||
Robert C. Daley, Chief | |||
Engineering Branch 3 | |||
Division of Reactor Safety | |||
Docket Nos. 05000266 and 05000301 | |||
License Nos. DPR-24 and DPR-27 | |||
Enclosure: | |||
As stated | |||
cc w/o encl OUO-SRI: Distribution via LISTSERV | |||
cc w encl OUO-SRI: | |||
M. Fencl, Security Manager | |||
B. Woyak, Engineering Director | |||
M. Nazar, President, Nuclear Division | |||
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION | |||
ML19324E767 (Cover letter w/ enclosure(s)) | |||
ADAMS ACCESSION NUMBER: ML19324E807(Cover letter) | |||
Cover Letter Non-Sensitive Publicly Available | |||
SUNSI Review Sensitive Non-Publicly Available | |||
Cover Letter w/ Enclosure Non-Sensitive Publicly Available | |||
SUNSI Review Sensitive Non-Publicly Available | |||
OFFICE RIII/DRS RIII/DRS | |||
NAME G Hausman RDaley/per email | |||
DATE 11/20/19 11/20/19 | |||
}} |
Latest revision as of 01:54, 16 March 2020
ML19324E807 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 11/20/2019 |
From: | Robert Daley Engineering Branch 3 |
To: | Craven R Point Beach |
References | |
IR 2019412 | |
Download: ML19324E807 (3) | |
See also: IR 05000266/2019412
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
November 20, 2019
Mr. Robert Craven
Site Director
NextEra Energy Point Beach, LLC
6610 Nuclear Road
Two Rivers, WI 54241-9516
SUBJECT: POINT BEACH NUCLEAR POWER PLANT - CYBER SECURITY INSPECTION
REPORT 05000266/2019412 AND 05000301/2019412
Dear Mr. Craven:
On October 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection
at Point Beach and discussed the results of this inspection with Mr. Tim Lesniak and other
members of your staff. The results of this inspection are documented in the enclosed report.
One finding of very low security significance (Green) is documented in this report. This finding
involved a violation of NRC requirements. We are treating this violation as a non-cited violation
(NCV) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or significance or severity of the violation documented in this
inspection report, you should provide a response within 30 days of the date of this inspection
report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional
Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear
Security and Incident Response; and the NRC Resident Inspector at Point Beach.
The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: one [H.8] - Procedure Adherence.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a
response within 30 days of the date of this inspection report, with the basis for your
disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director,
Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Point
Beach.
The enclosed report contains Security-Related Information, so the enclosed report will not be
made publicly available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a
response that contains Security-Related Information, please mark your entire response
Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in
accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
R. Craven 2
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in
accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Robert C. Daley, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 05000266 and 05000301
License Nos. DPR-24 and DPR-27
Enclosure:
As stated
cc w/o encl OUO-SRI: Distribution via LISTSERV
cc w encl OUO-SRI:
M. Fencl, Security Manager
B. Woyak, Engineering Director
M. Nazar, President, Nuclear Division
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION
ML19324E767 (Cover letter w/ enclosure(s))
ADAMS ACCESSION NUMBER: ML19324E807(Cover letter)
Cover Letter Non-Sensitive Publicly Available
SUNSI Review Sensitive Non-Publicly Available
Cover Letter w/ Enclosure Non-Sensitive Publicly Available
SUNSI Review Sensitive Non-Publicly Available
OFFICE RIII/DRS RIII/DRS
NAME G Hausman RDaley/per email
DATE 11/20/19 11/20/19