ML14226A106: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:
=Text=
=Text=
{{#Wiki_filter:Appendix C                          Job Performance Measure                          Form ES-C-1 Worksheet Facility:    DC Cook                                                            Task No: ______
{{#Wiki_filter:Appendix C                          Job Performance Measure                          Form ES-C-1 Worksheet Facility:    DC Cook                                                            Task No: ______
Task Title: Calculate Shutdown Margin                  Job Performance Measure No: _RO A1__
Task
 
==Title:==
Calculate Shutdown Margin                  Job Performance Measure No: _RO A1__
K/A  
K/A  


Line 220: Line 223:


Appendix C                              Job Performance Measure                              Form ES-C-1 Worksheet Facility:    DC Cook                                                                            Task No: ______
Appendix C                              Job Performance Measure                              Form ES-C-1 Worksheet Facility:    DC Cook                                                                            Task No: ______
Task Title: Review Shutdown Margin                                Job Performance Measure No: _SRO A1__
Task
 
==Title:==
Review Shutdown Margin                                Job Performance Measure No: _SRO A1__
K/A  
K/A  


Line 435: Line 441:


Appendix C                              Job Performance Measure                              Form ES-C-1 Worksheet Facility:        DC Cook                                                                        Task No: ______
Appendix C                              Job Performance Measure                              Form ES-C-1 Worksheet Facility:        DC Cook                                                                        Task No: ______
Task Title:     Calculate RCS Time to Boil/Core Uncovery - Loss of RHR Job Performance Measure No: ___A2____                                    K/A  
Task
 
==Title:==
Calculate RCS Time to Boil/Core Uncovery - Loss of RHR Job Performance Measure No: ___A2____                                    K/A  


==Reference:==
==Reference:==
Line 509: Line 518:


Appendix C                            Job Performance Measure                    Form ES-C-1 Worksheet Facility:      DC Cook                                                    Task No: ______
Appendix C                            Job Performance Measure                    Form ES-C-1 Worksheet Facility:      DC Cook                                                    Task No: ______
Task Title: Review Completed Surveillance as Second Check Job Performance Measure No: __A3____            K/A  
Task
 
==Title:==
Review Completed Surveillance as Second Check Job Performance Measure No: __A3____            K/A  


==Reference:==
==Reference:==
Line 596: Line 608:


Appendix C                              Job Performance Measure                              Form ES-C-1 Worksheet Facility:      DC Cook                                                                Task No: ______
Appendix C                              Job Performance Measure                              Form ES-C-1 Worksheet Facility:      DC Cook                                                                Task No: ______
Task Title: Determine Locked High Radiation Area (LHRA) Entry Requirements Job Performance Measure No: __RO A4___                                  K/A  
Task
 
==Title:==
Determine Locked High Radiation Area (LHRA) Entry Requirements Job Performance Measure No: __RO A4___                                  K/A  


==Reference:==
==Reference:==
Line 703: Line 718:


Appendix C                        Job Performance Measure                        Form ES-C-1 Worksheet Facility:      DC Cook                                                        Task No: ______
Appendix C                        Job Performance Measure                        Form ES-C-1 Worksheet Facility:      DC Cook                                                        Task No: ______
Task Title: Review and Authorize a Waste Gas Release Permit.
Task
 
==Title:==
Review and Authorize a Waste Gas Release Permit.
Job Performance Measure No: __SRO A4_                              K/A  
Job Performance Measure No: __SRO A4_                              K/A  


Line 806: Line 824:


Appendix C                            Job Performance Measure                            Form ES-C-1 Worksheet Facility:      DC Cook                                                              Task No: ______
Appendix C                            Job Performance Measure                            Form ES-C-1 Worksheet Facility:      DC Cook                                                              Task No: ______
Task Title: Make Classification and PAR Job Performance Measure No: _SRO A5_                                      K/A  
Task
 
==Title:==
Make Classification and PAR Job Performance Measure No: _SRO A5_                                      K/A  


==Reference:==
==Reference:==

Revision as of 04:41, 5 December 2019

2014 DC Cook Initial License Examination Administered Admin JPMs
ML14226A106
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 07/31/2014
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
References
Download: ML14226A106 (70)


Text

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: DC Cook Task No: ______

Task

Title:

Calculate Shutdown Margin Job Performance Measure No: _RO A1__

K/A

Reference:

___192002.K1.13_

Examinee: NRC Examiner: _____________________

Method of testing:

Simulated Performance _______________ Actual Performance _______X__________

Classroom _____X_______ Simulator ______X_______ Plant __________

Task Standard: Unit 2 Shutdown Margin has been calculated.

Required Materials:

2-OHP-4021-001-012, Rev. 21, Determination of Reactor Shutdown Margin Unit 2 Technical Data Book Cycle 21 General

References:

2-OHP-4021-001-012, Rev. 21 Read to the examinee:

Initial Conditions: Unit 2 is in Hot Standby 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after a trip from 100% power for 3 months. One (1)

Control Rod is stuck in the full out position. A cooldown to 360°F will be performed initially.

The following plant conditions exist:

  • All RCPs are in service
  • Core Burnup from PPC point U0035 is 8,013 MWD/MTU
  • Tavg is 547°F
  • RCS boron concentration is 1075 ppm and no dilutions are planned. Lab sample was taken one half hour ago and no dilution or boration has been performed.

Initiating Cue: Manually calculate Shutdown Margin using Xenon correction IAW plant procedures.

Shutdown Margin is currently met. Calculate Shutdown Margin requirements for 360°F.

Time Critical Task: Yes/No Validation Time: 45 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines no new sample is required.

SAT: UNSAT:

COMMENT:

STANDARD: Reviews Precautions and Limitations.

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Enters 21.

SAT: UNSAT:

COMMENT:

STANDARD: Enters date and time of Shutdown (3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> ago).

SAT: UNSAT:

COMMENT:

STANDARD: Enters date and time not to exceed 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> from shutdown based upon briefing SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Enters 8013 MWD/MTU SAT: UNSAT:

COMMENT:

STANDARD: Enters 8.013 GWD/MTU SAT: UNSAT:

COMMENT:

STANDARD: Enters N/A SAT: UNSAT:

COMMENT:

STANDARD: Enters 360oF SAT: UNSAT:

COMMENT:

STANDARD: Checks No box SAT: UNSAT:

COMMENT:

EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines Step 4.5 is N/A SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines curve to use is RCS Temp. > 152°F.

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters value of 1500ppm (1490-1510)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines Step 4.7 Applicable SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines Step 4.7.2 is 2 SAT: UNSAT:

COMMENT:

STANDARD: (CS) Worth of single rod 680 pcm (670-690)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines PCM is 1360 (1340-1380)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Selects Step 4.8.1 SAT: UNSAT:

COMMENT:

NOTE: Uses TDB Figure 1.3a to determine Fig. 8.3.b - MOC STANDARD: Selects Figure 8.3.b (MOC)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters negative -1875 pcm (-1825 to -

1925)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Enters 1360 ppm (1340-1380)

SAT: UNSAT:

COMMENT:

STANDARD: Enters -1875 ppm (-1825 to -1925)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters -515 ppm (-445 to -585)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters -9.925 pcm/ppm (-9.9 to -9.95)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Enters -515 pcm (-445 to -585)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters -9.925 ppm/pcm (-9.9 to -9.95)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters 51.9 ppm (44.7-59.1)

SAT: UNSAT:

COMMENT:

STANDARD: Enters 1500 ppm (1490-1510)

SAT: UNSAT:

COMMENT:

STANDARD: Enters 51.9 ppm (44.7-59.1)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters 1448.1 ppm (1430.9-1465.3)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Enters -10.0 ppm (-9.95to -10.05)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters -515 ppm (-445 to - 585)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters -10.0 ppm (-9.95 to -10.05)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters 51.5 ppm (44.3-58.8)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS) Enters 1500 ppm (1490-1510)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters 51.5 ppm (44.3-58.8)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters 1448.5 (1431.2-1465.7)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines 1448.5 (1431.2-1465.7)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD (CS) Enters 1075 ppm SAT: UNSAT:

COMMENT:

STANDARD Enters lab sample date and time (> one half hour ago)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters 1075 ppm SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters 1448.5 (1431.2-1465.7)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Enters -373.5 (-356.2 to -390.7)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Completes paperwork SAT: UNSAT:

COMMENT:

TERMINATE JPM: When SDM calculation is complete.

Termination Cue: SDM calculation is complete.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No. _____RO A1______

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:__________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Response:_________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________ ________

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initial Conditions: Unit 2 is in Hot Standby 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after a trip from 100% power for 3 months. One (1)

Control Rod is stuck in the full out position. A cooldown to 360°F will be performed initially.

The following plant conditions exist:

  • All RCPs are in service
  • Core Burnup from PPC point U0035 is 8,013 MWD/MTU
  • Tavg is 547°F
  • RCS boron concentration is 1075 ppm and no dilutions are planned. Lab sample was taken one half hour ago and no dilution or boration has been performed.

Initiating Cue: Manually calculate Shutdown Margin using Xenon correction IAW plant procedures.

Shutdown Margin is currently met. Calculate Shutdown Margin requirements for 360°F.

Formatted: Font: (Default) Arial, 11 pt

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: DC Cook Task No: ______

Task

Title:

Review Shutdown Margin Job Performance Measure No: _SRO A1__

K/A

Reference:

___192002.K1.13__

Examinee: NRC Examiner: _____________________

Method of testing:

Simulated Performance _______________ Actual Performance _______X__________

Classroom _____X_______ Simulator ______X_______ Plant __________

Task Standard: Unit 2 Shutdown Margin has been reviewed and corrected.

Required Materials:

2-OHP-4021-001-012, Rev. 21, Determination of Reactor Shutdown Margin (COMPLETED COPY)

Unit 2 Technical Data Book Cycle 21 General

References:

2-OHP-4021-001-012 Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions: You are the Unit Supervisor on Unit 2. Per your direction, the extra Control Room Operator completed Attachment 1 of 2-OHP-4021-001-012, Determination of Reactor Shutdown Margin.

Unit 2 is in Hot Standby 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after a trip from 100% power for 3 months. One (1) Control Rod is stuck in the full out position. A cooldown to 360°F will be performed initially.

The following plant conditions exist:

  • All RCPs are in service
  • PPC burnup from PPC point U0035 is 8,013 MWD/MTU
  • Tavg is 547°F
  • RCS boron concentration is 1075 ppm and no dilutions are planned. Lab sample was taken one half hour ago and no dilution or boration has been performed.

The RO manually calculated a Shutdown Margin for 360°F using Xenon correction IAW plant procedures. Shutdown Margin is currently met.

Initiating Cue: Perform a complete review of the completed Attachment 1.

Time Critical Task: Yes/No Validation Time: 45 minutes

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: NO boration or dilution has occurred since the last sample.

STANDARD: Concurs no new sample is required.

SAT: UNSAT:

COMMENT:

STANDARD: Reviews Precautions and Limitations.

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Concurs with 21.

SAT: UNSAT:

COMMENT:

STANDARD: Concurs with date and time of Shutdown (3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> ago).

SAT: UNSAT:

COMMENT:

STANDARD: Concurs with date and time SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: As required, when candidate identifies an error, ask candidate to make corrections as required.

NOTE:

  • Major (initial) errors are circled
  • Errors carry through the remainder of the calculation STANDARD: Concurs with 8013 MWD/MTU SAT: UNSAT:

COMMENT:

STANDARD: Concurs with 8.013 GWD/MTU SAT: UNSAT:

COMMENT:

STANDARD: Concurs with N/A SAT: UNSAT:

COMMENT:

STANDARD: (CS) Corrects temperature error, enters 360oF SAT: UNSAT:

COMMENT:

STANDARD: Concurs with check in No box SAT: UNSAT:

COMMENT:

EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Concurs that Step 4.5 is N/A SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) Determines curve to use is RCS Temp. > 152°F (NOT the > 541°F)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines a value of 1500ppm (1490-1510)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Concurs Step 4.7 is applicable SAT: UNSAT:

COMMENT:

STANDARD: Concurs that Step 4.7.2 is 2 SAT: UNSAT:

COMMENT:

NOTE: Following error uses Single Misaligned RW Curve from Fig. 1.3b STANDARD: (CS) Determines worth of single rod 680 pcm (670-690)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines PCM is 1360 (1340-1380)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Selects Step 4.8.1 SAT: UNSAT:

COMMENT:

NOTE: Uses TDB Figure 1.3a to determine Fig. 8.3.b - MOC STANDARD: Concurs with use of Figure 8.3.b (MOC)

SAT: UNSAT:

COMMENT:

STANDARD: Concurs with negative -1875 pcm (-1825 to -1925)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines 1360 ppm (1340-1380)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines NEGATIVE 1875 ppm (-1825 to -1925)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines -515 ppm (-445 to -585)

SAT: UNSAT:

COMMENT:

STANDARD: Concurs with -9.925 pcm/ppm (-9.9 to -9.95)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines -515 pcm (-445 to -585)

SAT: UNSAT:

COMMENT:

STANDARD: Concurs with -9.925 ppm/pcm (-9.9 to -9.95)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines 51.9 ppm (44.7-59.1)

SAT: UNSAT:

COMMENT:

STANDARD: Determines 1500 ppm (1490-1510)

SAT: UNSAT:

COMMENT:

STANDARD: Determines 51.9 ppm (44.7-59.1)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines 1448.1 ppm (1430.9-1465.3)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

NOTE: From Figure 4.1b using:

  • 547°F (error)
  • 1545.4 ppm (error)

STANDARD: (CS) Determines -10.0 ppm (-9.95to -10.05)

SAT: UNSAT:

COMMENT:

STANDARD: Determines -515 ppm (-445 to - 585)

SAT: UNSAT:

COMMENT:

STANDARD: Determines -10.0 ppm (-9.95 to -10.05)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines 51.5 ppm (44.3-58.8)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Determines 1500 ppm (1490-1510)

SAT: UNSAT:

COMMENT:

STANDARD: Determines 51.5 ppm (44.3-58.8)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines 1448.5 (1431.2-1465.7)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines 1448.5 (1431.2-1465.7)

SAT: UNSAT:

COMMENT:

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Concurs with 1075 ppm SAT: UNSAT:

COMMENT:

STANDARD: Concurs with lab sample date and time.

SAT: UNSAT:

COMMENT:

STANDARD: Concurs with1075 ppm SAT: UNSAT:

COMMENT:

STANDARD: Determines 1448.5 (1431.2-1465.7)

SAT: UNSAT:

COMMENT:

STANDARD: (CS) Determines -373.5 (-356.2 to -390.7)

SAT: UNSAT:

COMMENT:

NOTE: Initial on either step is correct. Emergency Boration is preferred because of large negative reactivity insertion.

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Completes review of paperwork SAT: UNSAT:

COMMENT:

TERMINATE JPM: When SDM review is complete.

Termination Cue: SDM calculation is complete.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No. __SRO A1__

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:__________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Response:_________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________ ________

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initial Conditions:

You are the Unit Supervisor on Unit 2. Per your direction, the extra Control Room Operator completed of 2-OHP-4021-001-012, Determination of Reactor Shutdown Margin.

Unit 2 is in Hot Standby 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> after a trip from 100% power for 3 months. One (1) Control Rod is stuck in the full out position. A cooldown to 360°F will be performed initially.

The following plant conditions exist:

  • All RCPs are in service
  • PPC burnup from PPC point U0035 is 8,013 MWD/MTU
  • Tavg is 547°F
  • RCS boron concentration is 1075 ppm and no dilutions are planned. Lab sample was taken one half hour ago and no dilution or boration has been performed.

The RO manually calculated a Shutdown Margin for 360°F using Xenon correction IAW plant procedures. Shutdown Margin is currently met.

Initiating Cue:

Perform a complete review of the completed Attachment 1, noting all errors.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: DC Cook Task No: ______

Task

Title:

Calculate RCS Time to Boil/Core Uncovery - Loss of RHR Job Performance Measure No: ___A2____ K/A

Reference:

__ APE.025.AA1.02__

Examinee: NRC Examiner: _____________________

Facility Evaluator: Date: ______________________________

Method of testing: Simulated Performance ________ Actual Performance _____X____

Classroom ___X_________ Simulator _____X________ Plant __________

Task Standard: Time to boil is calculated.

Required Materials: 2-OHP-4022-017-001, Step 15 and Figures 3 & 4 General

References:

2-OHP-4022-017-001, LOSS OF RHR COOLING, Rev. 21 2014 Calendar Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

Today is July 30, 2014. Unit 2 is in an Outage and has experienced a loss of RHR. Efforts are underway to restore RHR or some other method of core cooling. The Steam Generators have nozzle dams in the loops and are not available. The unit was shut down on May 30, 2014 after operating for 3 months.

Initiating Cue:

You are an extra RO.

The Unit Supervisor directs you to determine the amount of time to Core Boiling and the amount of time from Boiling until Core Uncovery per the NOTE prior to Step 15 of 2-OHP-4022-017-001, Loss of RHR Cooling.

The Reactor vessel is currently open to Containment (Vessel Head removed) and RCS temperature is approximately 115°F.

Time to Core Boil: _____________

Time from Boil to Core Uncovery ___________

Give copy of Task Briefing and 2-OHP-4022-017-001, Step 15 and Figures 3 & 4, to examinee.

Time Critical Task: Yes/No Validation Time: 10 minutes Page 1 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Operator determines that Figure 3 and 4 must be used SAT: UNSAT:

COMMENT:

Page 2 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Operator determines that the plant has been shut down for 61 days after operating for approximately 90 days SAT: UNSAT:

COMMENT:

STANDARD: (CS) Operator reports the calculated Time to Boil is 50 minutes (47.5 to 52.5)

CUE: Acknowledge the Time to Boil is ______ minutes SAT: UNSAT:

COMMENT:

Page 3 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: (CS) Operator reports the calculated Time to Core Uncovery is 375 minutes (360 - 390) from the onset of boiling CUE: Acknowledge the Time from Boiling to Core Uncovery is

_______ minutes SAT: UNSAT:

COMMENT:

Termination Cue: Operator has determined and reported time to boiling and time to core uncovery Page 4 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No. _____A2________

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:______________________________________________________________

______________________________________________________________________

______________________________________________________________________

Response:_____________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: ___________________________ ________

Page 5 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initial Conditions:

Today is July 30, 2014. Unit 2 is in an Outage and has experienced a loss of RHR.

Efforts are underway to restore RHR or some other method of core cooling. The Steam Generators have nozzle dams in the loops and are not available. The unit was shut down on May 30, 2014 after operating for 3 months.

Initiating Cue:

You are an extra RO.

The Unit Supervisor directs you to determine the amount of time to Core Boiling and the amount of time from Boiling until Core Uncovery per the NOTE prior to Step 15 of 2-OHP-4022-017-001, Loss of RHR Cooling.

The Reactor vessel is currently open to Containment (Vessel Head removed) and RCS temperature is approximately 115°F.

Time to Core Boil: _____________

Time from Boil to Core Uncovery ___________

Page 6 of 6

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: DC Cook Task No: ______

Task

Title:

Review Completed Surveillance as Second Check Job Performance Measure No: __A3____ K/A

Reference:

__ Equipment Control 2.2.12__

Examinee: NRC Examiner: _____________________

Facility Evaluator: Date: ______________________________

Method of testing:

Simulated Performance _______________ Actual Performance ______X__________

Classroom ___X________ Simulator _____X________ Plant __________

Task Standard: Review completed surveillance as second check and provide recommendation to SRO Required Materials: 2-OHP-4030-214-031, Rev. 27, Completed copy of Operations Weekly Surveillance Checks, Attachment 2, Bus Voltage Supplement Technical Specification 3.8.1 and 3.8.2 General

References:

2-OHP-4030-214-031: Operations Weekly Surveillance Checks, Rev. 27 (COMPLETED COPY)

Read to the examinee:

Initial Conditions: Unit 2 is at 100% power. All systems are operating normally.

Initiating Cue: The Shift Manager has asked you to peer check Attachment 2 of the Operations Weekly Surveillance Checks (2-OHP-4030-214-031) that was just completed and report your results to him.

M&TE Number is VTM-067; Cal Due Date is 9-10-14.

Time Critical Task: Yes/No Validation Time: 20 minutes Page 1 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Reviews Prerequisites, Precautions and Limitations.

SAT: UNSAT:

COMMENT:

Page 2 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

NOTE: Major errors are circled STANDARD: Notes Cal Due Date was recorded wrong.

(Should be 9-10-14)

SAT: UNSAT:

COMMENT:

STANDARD: Reviews signed-off steps.

SAT: UNSAT:

COMMENT:

Page 3 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Identify Bus 21D VAVG is incorrect (should be 599.15).

Critical Step SAT: UNSAT:

COMMENT:

Page 4 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Reviews signed-off steps.

SAT: UNSAT:

COMMENT:

Page 5 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Identify Bus T21C VMAVG and VAVG are incorrect (VM AVG should be 119.53 and VAVG should be 4183.55)

Critical Steps SAT: UNSAT:

COMMENT:

Page 6 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Reviews signed-off steps.

SAT: UNSAT:

COMMENT:

STANDARD: Notifies Shift Manager of the errors in the surveillance.

SAT: UNSAT:

COMMENT:

Terminating Cue: This completes the JPM Page 7 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No. _____A3________

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:__________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Response:_________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________ ________

Page 8 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initial Conditions:

Unit 2 is at 100% power. All systems are operating normally.

Initiating Cue:

The Shift Manager has asked you to peer check Attachment 2 of the Operations Weekly Surveillance Checks (2-OHP-4030-214-031) that was just completed and report your results to him.

M&TE Number is VTM-067 Cal Due Date is 9-10-14 Page 9 of 9

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: DC Cook Task No: ______

Task

Title:

Determine Locked High Radiation Area (LHRA) Entry Requirements Job Performance Measure No: __RO A4___ K/A

Reference:

____2.3.12___

Examinee: NRC Examiner: _____________________

Method of testing:

Simulated Performance ___________ Actual Performance _______X__________

Classroom ___X________ Simulator ______X________ Plant ____X______

Task Standard: Determine Locked High Radiation Area (LHRA) entry requirements Required Materials: Candidate may request:

  • PMP-6010-RPP-003, High, Locked High, and Very High Rad. Area Access
  • PMP-6010-RPP-006, Radiation Work Permit Program General

References:

U1 VCT RWP, U1 VCT Rad. Area Map, PMP-6010-RPP-003, Rev. 23 and PMP-6010-RPP-006, Rev. 18.

Time Critical Task: Yes/No Validation Time: 10 minutes Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

A worker exiting the plant reports that seepage was observed on the Unit 1 Volume Control Tank (VCT)

Initiating Cue:

You are an Extra RO. The Shift Manager directs you to determine the Entry Requirements for Unit 1 VCT Room (the Room/area directly surrounding the VCT).

Appendix C Job Performance Measure Form ES-C-1 Worksheet Performance Information Denote critical steps with a (CS)

___________________________________________________________________________

______ Performance step: 1 (CS)

CUE : Take me to the Unit 1 VCT Room.

Standard: Unit 1 Aux. Building, 609 Elevation - next to the Unit 1 Boric Acid Batch Tank.

Reference:

N/A Comment:

____________________________________________________________________________

______ Performance step: 2 (CS)

CUE: What type of a Radiation Area is the Unit 1 VCT Room and what type of RWP is required for Entry?

Standard: PMP-6010-RPP-003, Step 3.6.1, Locked High Radiation Area. A Job Specific U-1 VCT Locked High Radiation Area Activities Radiation Work Permit (RWP)

Reference:

Survey Map, RWP 1037 Comment:

____________________________________________________________________________

______ Performance step: 3 Cue: If step 2 was correctly determined (regarding RWPs), ask: Which type of RWP can NOT be used for this area?

Standard: Correct answer is GENERAL

Reference:

PMP-6010-RPP-006, Step 3.2.1 Comment:

Appendix C Job Performance Measure Form ES-C-1 Worksheet

__________________________________________________________________________

______ Performance step: 4 (CS)

CUE: Describe the Requirements for a Locked High Radiation Area Entry?

A. Standard: (CS) An RP (LHRA) Briefing must be completed prior to entry.

Cue: If required ask: What is the content of the Brief?

  • Answer: Survey Maps, RP Coverage, Turn back Dose, Radiological Precautions

Reference:

PMP-6010-RPP-003, Step 3.6.5.a.

Reference:

PMP-6010-RPP-006 Data Sheet 2, Pre-Job ALARA Briefing Checklist B. Standard: (CS) Must obtain the Unit 1 VCT LHRA Key from RP Supervisor.

Cue: If required ask: Where do you obtain the key?

  • Answer: RP Supervisor

Reference:

PMP-6010-RPP-003, Step 3.6.5.b.

C. Standard: (CS) Obtain Correct Dosimetry.

Cue: If required ask: What type of Dosimetry is required?

Cue: If required ask: Is it associated with the RWP, How?

  • Answer: Need Large, Alarming/Vibrating ED. l Must log onto RWP with ED

Reference:

PMP-6010-RPP-003, Cue: If required ask: What type of RP Support is required for this entry?

D. Standard: Correct answers are:

  • Answer: Continuous RP coverage
  • Answer: RP shall always enter first; however, remote monitoring or extendable meters may be used in lieu of RP

Reference:

PMP-6010-RPP-003, Step 3.3.1.b. and 3.6.6.a.

Comment:

____________________________________________________________________________

Terminating Cue: Candidate has completed his list of LHRA entry requirements.

Appendix C Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No. _____RO A4______

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:__________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Response:_________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________ ________

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initial Conditions:

A worker exiting the plant reports that seepage was observed on the Unit One (1) Volume Control Tank (VCT).

Initiating Cue:

You are an Extra RO. The Shift Manager directs you to determine the Entry Requirements for Unit 1 VCT Room (the Room/area directly surrounding the VCT).

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: DC Cook Task No: ______

Task

Title:

Review and Authorize a Waste Gas Release Permit.

Job Performance Measure No: __SRO A4_ K/A

Reference:

___G.2.3.6__

Examinee: NRC Examiner: _____________________

Facility Evaluator: Date: ______________________________

Method of testing:

Simulated Performance _______________ Actual Performance ______X__________

Classroom ____X________ Simulator ______X________ Plant __________

Task Standard:

  • Identifying conditions that would prevent authorization of a gaseous release in accordance with Step 4.5 of 12-OHP-4021-023-002, Release of Radioactive Waste from Gas Decay Tanks.

Required Materials:

  • 12-OHP-4021-023-002, Attachment 2 (COMPLETED)
  • 12-OHP-4021-023-002, Data Sheet 1 (COMPLETED)
  • 12-OHP-4021-023-002, Figure 1
  • Gaseous Waste Release Worksheet (COMPLETED)

General

References:

12-OHP-4021-023-002, Rev. 31; PMP-6010-OSD-001, Rev. 24 Read to the examinee:

You are the WCC SRO.

Given the following conditions:

  • Both units are operating at 100% power
  • Radiation Monitors 1-VRS-1500 and 2-VRS-2500 are OPERABLE
  • Meteorological instrumentation is OPERABLE
  • Gas Decay Tank # 6 is ready to be released.
  • The gas decay tank release package is prepared for your review and authorization.

Initiating Cue:

Authorize gas decay tank release (G-14-04) in accordance with Step 4.5 of 12-OHP-4021-023-002, Release of Radioactive Waste from Gas Decay Tanks.

Time Critical Task: Yes/No Validation Time: 20 minutes Page 1 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: (CS) .Candidate initiates review of Data Sheet 1 and determines Chemistry Signature is NOT present.

SAT: UNSAT:

NOTE: See Data Sheet 1 - Section 2 COMMENT:

Page 2 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Candidate reviews Data Sheet 1 information as WCC SRO (see next page).

SAT: UNSAT:

COMMENT:

Page 3 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Candidate verifies sample data in SECTION 1 consistent with GASEOUS WASTE RELEASE WORKSHEET data SAT: UNSAT:

COMMENT:

Page 4 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

STANDARD: Candidate verifies sample data in SECTION 2 is consistent with GASEOUS WASTE RELEASE WORKSHEET data SAT: UNSAT:

COMMENT:

STANDARD: (CS) Candidate identifies that Environmental (approval) Signature, Date, and Time is missing.

SAT: UNSAT:

COMMENT:

CUE: If Chemistry and Environmental do not approve the release, who can?

STANDARD: Candidate replies, the Plant Manager.

SAT: UNSAT:

COMMENT:

Page 5 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (CS Indicates Critical Standard)

CUE: Required signature has been obtained. Proceed with review.

STANDARD: (CS) Identifies that greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> has elapsed since Chemistry approved the release (Data Sheet 1, Section 2, Chemistry approval Date/Time) and/or 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> has elapsed since time of sample analysis.

NOTE: Chemistry approval 7/25/14@0805; Exam is some time on the week of July 28th , 2014 (> 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> on any day during week).

CUE: If candidate asks, the current date/time is the present date/time (real time).

SAT: UNSAT:

COMMENT:

CUE: JPM is Complete.

Termination Cue: Review is complete.

Page 6 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No. __SRO A4__

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:__________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Response:_________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________ ________

Page 7 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Initial Conditions:

You are the WCC SRO.

Given the following conditions:

  • Both units are operating at 100% power
  • Radiation Monitors 1-VRS-1500 and 2-VRS-2500 are OPERABLE
  • Meteorological instrumentation is OPERABLE
  • Gas Decay Tank # 6 is ready to be released.
  • The gas decay tank release package is prepared for your review and authorization.

Initiating Cue:

Authorize gas decay tank release (G-14-04) in accordance with Step 4.5 of 12-OHP-4021-023-002, Release of Radioactive Waste from Gas Decay Tanks.

Page 8 of 8

Appendix C Job Performance Measure Form ES-C-1 Worksheet Facility: DC Cook Task No: ______

Task

Title:

Make Classification and PAR Job Performance Measure No: _SRO A5_ K/A

Reference:

_G.2.4.44_

Examinee: NRC Examiner: ____________________

Facility Evaluator: Date: ____________________________

Method of testing:

Simulated Performance _______________ Actual Performance ______X________

Classroom _____X________ Simulator _____X________ Plant __________

Task Standard: Classify the event as a General Emergency and provide the correct Protective Action Recommendation, document classification and PAR on the correct section of the Accident Notification Form Required Materials:

  • PMP-2080-EPP-101, Rev 18
  • PMP-2080-EPP-100, Rev 28
  • EMD-32a form
  • MIDAS printout (attached)

General

References:

PMI-2080 Read to the examinee:

Initial Conditions:

Unit 2 was at 100% power with the South SI pump on clearance for pump overhaul when a Loss of Coolant Accident occurred and the Unit automatically tripped.

  • Both CCPs tripped on overcurrent, CTS actuated automatically with RCPs being secured by the RO shortly thereafter.
  • The crew was transitioning to 2-OHP-4023-E-1, Loss of Reactor or Secondary Coolant when the STA reported a RED CSFST indication on Core Cooling with containment Radiation levels at

~270 R/hr.

  • The crew then transitioned to 2-OHP-4023-FR-C.1, Response to Inadequate Core Cooling, which has been implemented for 20 minutes without restoring core cooling.

The following conditions exist:

  • Containment pressure is 4.2 psig
  • Containment area high Rad monitors are reading 6.4E4 R/HR
  • Prevailing winds are 45 MPH from 300 degrees
  • A report was received and confirmed that containment penetration CPN-71 is leaking
  • Site boundary dose is 2.6 REM TEDE and 4.8 REM Thyroid CDE Page 1 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet

  • DAP is NOT available
  • Blizzard conditions exist Initiating CUE:
  • You are the Shift Manager.
  • You are to take the Shift Managers actions for this event. Document actions on an EMD-32a form.

This is a time critical JPM (15 minutes to classify; 12 minutes after classify to communicator.

Page 2 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Obtain PMP-2080-EPP-101 and refer to Attachment 1, Emergency Condition Categories SAT: UNSAT:

COMMENT:

Page 3 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Compare the initial conditions to the emergency condition categories and declare a General Emergency based on a combination of the following categories (which warrant a General Emergency) 1.1L, 1.2L, and 2.1L, 2.3L, and 3.2L, 3.1P, 3.7P.

Critical Step SAT: UNSAT:

COMMENT:

NOTE: The declaration is based on 2 Ls and 1 P or on 3 Ls in combination using page 12 and 13 of EPP.101 Page 4 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: SEE PREVIOUS PAGE COMMENT:

Page 5 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

CUE: Give a copy of the EPP-100 to the candidate STANDARD: Obtain PMP-2080-EPP-100 and determines that a mandatory PAR applies (step 3.2.5 a.4.) and refers to Attachment 1, Protective Action Recommendations.

SAT: UNSAT:

COMMENT:

Page 6 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

DAP is not available (Init. Conditions)

Blizzard conditions exist (Init. Conditions)

STANDARD: Refers to Attachment 1, Protective Action Recommendations and determines that PSP-4 applies (SIP Area 1 [2 mile radius] and SIP 5 miles downwind -

SECTORS E, F, and G)

Critical Step SAT: UNSAT:

COMMENT:

Page 7 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet EXPECTED ACTIONS CUES/STANDARDS (Critical Step in bold)

STANDARD: Completes EMD-32a form as per example.

SAT: UNSAT:

COMMENT:

Terminating cue: JPM is terminated when the candidate recommends a PAR.

Page 8 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet Verification of Completion Job Performance Measure No. ____SRO A5______

Examinees Name:

Examiners Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Question:__________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Response:_________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

__________________________________________________________________________

Result: Satisfactory/Unsatisfactory Examiners signature and date: _______________________________ ________

Page 9 of 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet The following conditions exist:

Unit 2 was at 100% power with the South SI pump on clearance for pump overhaul when a Loss of Coolant Accident occurred and the Unit automatically tripped.

Both CCPs tripped on overcurrent, CTS actuated automatically with RCPs being secured by the RO shortly thereafter.

The crew was transitioning to 2-OHP-4023-E-1, Loss of Reactor or Secondary Coolant when the STA reported a RED CSFST indication on Core Cooling with containment Radiation levels at ~270 R/hr.

The crew then transitioned to 2-OHP-4023-FR-C.1, Response to Inadequate Core Cooling, which has been implemented for 20 minutes without restoring core cooling.

  • Containment pressure is 4.2 psig
  • Containment area high Rad monitors are reading 6.4E4 R/HR
  • Prevailing winds are 45 MPH from 300 degrees
  • A report was received and confirmed that containment penetration CPN-71 is leaking
  • DAP is NOT available
  • Blizzard conditions exist Initiating CUE: You are the Shift Manager.

You are to take the Shift Managers actions for this event.

Document actions on an EMD-32a form.

This is a time critical JPM Page 10 of 10