ML19254E987: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 6: | Line 6: | ||
| number = ML19254E989 | | number = ML19254E989 | ||
| issue date = 10/29/1979 | | issue date = 10/29/1979 | ||
| title = | | title = Updated LER 79-017/01T-3:on 790330,safety Analysis Methology Review for Single Dropped Rod Indicated Potential for Inconsistent DNB Ratios.Caused by Incorrect Measurement of Core Power Level | ||
| author name = Hairston W | | author name = Hairston W | ||
| author affiliation = ALABAMA POWER CO. | | author affiliation = ALABAMA POWER CO. |
Latest revision as of 17:35, 23 January 2020
Date released: 09/25/2019 | Download: ML19254E987 |
---|---|
ML19254E989 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 10/29/1979 |
From: | Hairston W ALABAMA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19254E989 (4) | |
ML19254E986 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 10/29/1979 |
From: | Clayton F ALABAMA POWER CO. |
To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
References | |
Download: ML19254E986 (1) | |