ML17313A181: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: I 50-528 UNIT NAME: PVNGS-1 DATE: 1/14/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997 | ||
: 1. Design Electrical Rating (Net MWe): 1265 | |||
: 2. Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generatin Statistics This Month Yr.,to Date Cumulative | |||
: 3. Hours Reactor was Critical 744.0 8,671.1 73,996.3 | |||
: 4. Hours Generator was On-Line 744.0 8,658.6 72,811.1 | |||
: 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 6. Net Electrical Ener Generated MWh 934,524 10,737,706 86,203,268 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reason~ Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997. | |||
F-Forced 2Reason: 3Method: | |||
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain) | |||
F-Administrative 6-Operational Error (Explain) | |||
H-Other (Explain) | |||
==SUMMARY== | |||
: | |||
980i220042 980ii4 PDR AOQCK 05000528 R PDR | |||
e NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-529 I | |||
UNIT NAME: PVNGS-2 DATE: 1/1 4/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997 | |||
: 1. Design Electrical Rating (Net MWe): 1265 | |||
: 2. Maximum Dependable Capacity(NetMWe): 1243 Unit 2 Generatin Statistics This Month Yr. to Date Cumulative | |||
: 3. Hours Reactor was Critical 744.0 7,692.0 73,425.7 | |||
: 4. Hours Generator was On-Line 744.0 7,661.9 72,232.8 | |||
: 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0 | |||
: 6. Net Electrical Ener Generated MWh 948,014 9,322,667 86,429,559 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reasons Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997. | |||
F-Forced 2Reason: sMethod: | |||
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training /License Examination 5-Other-(Explain) | |||
F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain) | |||
==SUMMARY== | |||
: | |||
t NRC MONTHLYOPERATING DATA REPORT t | |||
DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 1/14/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997 | |||
: 1. Design Electrical Rating (Net MWe): 1269 | |||
: 2. Maximum Dependable Capacity(Net MWe): 1247 Unit 3 Generatin Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,868.9 69,325.7 Hours Generator was On-Line 744.0 7,822.1 68,499.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Ener Generated MWh 933,789 9,453,826 82,752,971 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Types'ours Reason~ Reactors to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997. | |||
F-Forced ~Reason: s Method: | |||
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain) | |||
F-Administrative 6-Operational Error (Explain) | |||
H-Other (Explain) | |||
==SUMMARY== | |||
: | |||
}} |
Revision as of 07:45, 29 October 2019
ML17313A181 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 12/31/1997 |
From: | Fulton J ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
To: | |
Shared Package | |
ML17313A180 | List: |
References | |
NUDOCS 9801220042 | |
Download: ML17313A181 (3) | |
Text
NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: I 50-528 UNIT NAME: PVNGS-1 DATE: 1/14/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997
- 1. Design Electrical Rating (Net MWe): 1265
- 2. Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generatin Statistics This Month Yr.,to Date Cumulative
- 3. Hours Reactor was Critical 744.0 8,671.1 73,996.3
- 4. Hours Generator was On-Line 744.0 8,658.6 72,811.1
- 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6. Net Electrical Ener Generated MWh 934,524 10,737,706 86,203,268 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reason~ Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced 2Reason: 3Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)
F-Administrative 6-Operational Error (Explain)
H-Other (Explain)
SUMMARY
980i220042 980ii4 PDR AOQCK 05000528 R PDR
e NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-529 I
UNIT NAME: PVNGS-2 DATE: 1/1 4/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997
- 1. Design Electrical Rating (Net MWe): 1265
- 2. Maximum Dependable Capacity(NetMWe): 1243 Unit 2 Generatin Statistics This Month Yr. to Date Cumulative
- 3. Hours Reactor was Critical 744.0 7,692.0 73,425.7
- 4. Hours Generator was On-Line 744.0 7,661.9 72,232.8
- 5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 6. Net Electrical Ener Generated MWh 948,014 9,322,667 86,429,559 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reasons Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced 2Reason: sMethod:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training /License Examination 5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
SUMMARY
t NRC MONTHLYOPERATING DATA REPORT t
DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 1/14/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997
- 1. Design Electrical Rating (Net MWe): 1269
- 2. Maximum Dependable Capacity(Net MWe): 1247 Unit 3 Generatin Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,868.9 69,325.7 Hours Generator was On-Line 744.0 7,822.1 68,499.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Ener Generated MWh 933,789 9,453,826 82,752,971 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Types'ours Reason~ Reactors to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced ~Reason: s Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)
F-Administrative 6-Operational Error (Explain)
H-Other (Explain)