{{#Wiki_filter:PRIDRITY 1 ACCELERATED RIDS PROCESSING)
{{#Wiki_filter:PRIDRITY ACCELERATED RIDS PROCESSING) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9409210319 DOC.DATE: 94/09/15 NOTARIZED:
ACCESSION NBR:9409210319               DOC.DATE:     94/09/15   NOTARIZED: NO       DOCKET  ¹ FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power                   & Light Co. 05000389 AUTH. NAME             AUTHOR AFFILIATION GOLDBERG,J.H.         Florida     Power & Light Co.
NO FACIL:50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION GOLDBERG,J.H.
RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document           Control Desk)
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Responds to notice of violations noted in insp rept 50-389/94-15.Corrective actions:plant shutdown&entered mode 3 on 940714.DISTRIBUTION'CODE:
Responds to notice of violations noted in insp rept 50-389/94-15.Corrective actions:plant shutdown & entered mode 3 on 940714.
IE01D COPIES RECEIVED LTR ENCL 0 SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES: DOCKET&#xb9;05000389 RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/BPD/RAB ME~0/<TC F2TEl CENTER 02 NRR/'DRCH/HHFB NU DOCS-ABSTRACT OGC/HDS3 RGN2 FILE 01 EXTERNAL EG&G/BRYCE i J~H NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NORRIS,J AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DORS/OEAB NRR/PMAS/IRCB-E OE DIR RES/HFB NOAC COPIES LTTR ENCL NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION'CODE: IE01D             COPIES RECEIVED LTR         ENCL 0 SIZE:
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2083)TO ELINIINATE YOUR NAME FROil DISTRIBUTION LISTS FOR DOCI.'MENTS YOU DON"I'L'ED!
TITLE: General (50 Dkt)-Insp Rept/Notice                 of Vio ation Response NOTES:
TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL  
RECIPIENT                COPIES              RECIPIENT         COPIES ID CODE/NAME              LTTR ENCL        ID CODE/NAME     LTTR ENCL PD2-2 PD                                     NORRIS,J INTERNAL: ACRS                                           AEOD/DEIB AEOD/BPD/RAB                                 AEOD/SPD/RRAB ME~0/<TC                                     DEDRO F2TEl CENTER       02                       NRR/DORS/OEAB NRR/'DRCH/HHFB                               NRR/PMAS/IRCB-E NU DOCS-ABSTRACT                             OE DIR OGC/HDS3                                     RES/HFB RGN2     FILE     01 EXTERNAL   EG&G/BRYCE i J ~ H                           NOAC NRC PDR NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELINIINATEYOUR NAME FROil DISTRIBUTION LISTS FOR DOCI.'MENTS YOU DON"I'L'ED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   21   ENCL


Florida Power 8c Light Company, P.O.Box 14000, Juno Beach, FL 33408-0420 FPL SEP 1 5 199'f L-94-233 10 CFR 2.201 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Re: St.Lucie Unit 2 Docket No.50-389 Reply to Notice of Violation Ins ection Re ort 94-15 Florida Power and Light Company (FPL)has reviewed the subject inspection report and pursuant to 10 CFR 2.201 the response to the~~~~~notice of violation is attached.Very truly yours, J.H.Goldberg President-Nuclear Division JHG/JWH/kw Attachment cc: Stewart D.Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St.Lucie Plant DAS/PSL N1196-94 9409210319 9409'15 PDR ADOCK 0500038rr' PDR an FPL Group company Re: St.Lucie Uni 2 Docket No.50-389 Reply to Notice of Violation Zns ection Re ort 94-15 VIOLATION:
Florida Power 8c Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 FPL SEP   1 5 199'f L-94-233 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn:       Document Control Desk Washington, D. C. 20555 Re:     St. Lucie Unit         2 Docket No. 50-389 Reply to Notice of         Violation Ins ection       Re   ort 94-15 Florida Power and Light Company                       (FPL) has reviewed the                     subject inspection report and pursuant to
St.Lucie Unit 2 Technical Specification 3.3.1, Table 3.3-1, item 12, required, in part, that 4 channels of TCBs be operable in Mode 1.The associated LCO action statement required that an inoperable channel be placed in the tripped condition within 1 hour;otherwise, the unit was required to be in Mode 3 within 6 hours.Contrary to the above, on July 14, 1994, when Trip Circuit Breaker TCB-5'failed to open when required, was declared inoperable, and the breaker's failure mode prevented placing the affected channel in the tripped condition, the associated shutdown to Mode 3 was not performed in the required 6 hours.While the unit was ultimately shut down, entrance into Mode, 3 occurred approximately 7-1/2 hours after declaring the Trip Circuit Breaker inoperable.
            ~
Further, the shutdown was premised on a management directive, as opposed to a Technical Specif ication requirement.
10 CFR 2.201 the response                     to the notice of violation is attached.
While the licensee interrupted TCB-5's electrical flow path by opening Trip Circuit Breakers TCB-1, TCB-2, and TCB-6, the subject Technical Specification action statement was prescriptive in requiring that either Trip Circuit Breaker TCB-5 be opened or that the unit be shut down.RESPONSE: REASON FOR VIOLATION FPL concurs that a violation existed.The root cause of the violation was personnel error on the part of Operations Management.
    ~            ~      ~    ~
2.CORRECTIVE STEPS TAKEN AND THE RESULTS ACHIEVED The plant was shutdown and entered Mode 3 at 11:06 a.m.on July 14, 1994.3.CORRECTIVE STEPS TO AVOID FURTHER VIOLATIONS The Site Vice President and Plant General Manager have reviewed this event with Operations Management and other key site personnel.
Very   truly yours, J. H. Goldberg President - Nuclear Division JHG/JWH/kw Attachment cc: Stewart D. Ebneter, Regional Administrator, USNRC Region                                           II Senior Resident Inspector, USNRC, St. Lucie Plant DAS/PSL N1196-94 9409210319 9409'15 PDR     ADOCK     0500038rr' PDR an FPL Group company
The need for strict adherence to Technical Specifications has been emphasized.
 
B.Operations Management have be'en made aware that other sources within the Nuclear Division are available to aid in their decision making process when events arise that involve complex or previously unencountered situations.
Re:   St. Lucie Uni 2 Docket No. 50-389 Reply to Notice of   Violation Zns ection Re ort 94-15 VIOLATION:
4.DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance was achieved when the plant entered Mode 3 at 11:06 a.m.on July 14, 1994.}}
St. Lucie Unit 2 Technical Specification 3.3.1, Table 3.3-1, item 12, required, in part, that 4 channels of TCBs be operable in Mode
: 1. The associated LCO action statement required that an inoperable channel be placed in the tripped condition within 1 hour; otherwise, the unit was required to be in Mode 3 within 6 hours.
Contrary to the above, on July 14, 1994, when Trip Circuit Breaker TCB-5 'failed to open when required, was declared inoperable, and the breaker's failure mode prevented placing the affected channel in the tripped condition, the associated shutdown to Mode 3 was not performed in the required 6 hours.
While the unit was ultimately shut down, entrance into Mode, 3 occurred approximately 7-1/2 hours after declaring the Trip Circuit Breaker inoperable.       Further, the shutdown was premised on a management directive, as opposed to a Technical Specif ication requirement. While the licensee interrupted TCB-5's electrical flow path by opening Trip Circuit Breakers TCB-1, TCB-2, and TCB-6, the subject Technical Specification action statement               was prescriptive in requiring that either Trip Circuit Breaker   TCB-5 be opened or that the unit be shut down.
 
===RESPONSE===
REASON FOR VIOLATION FPL concurs that a violation existed. The root cause of the violation   was personnel error on the part of Operations Management.
: 2. CORRECTIVE STEPS TAKEN AND THE RESULTS ACHIEVED The plant was shutdown and entered   Mode 3 at 11:06 a.m. on July 14, 1994.
: 3. CORRECTIVE STEPS TO AVOID FURTHER VIOLATIONS The Site Vice President and Plant General Manager have reviewed this event with Operations Management and other key site personnel. The need for strict adherence to Technical Specifications has been emphasized.
B. Operations Management have be'en made aware that other sources within the Nuclear Division are available to aid in their decision making process when events arise that involve complex or previously unencountered situations.
: 4. DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance was achieved when the plant entered Mode 3 at 11:06 a.m. on July 14, 1994.}}

Latest revision as of 21:09, 29 October 2019

Responds to Violation Noted in Insp Rept 50-389/94-15. Corrective Actions:Plant Shutdown & Entered Mode 3 on 940714 & Need Site Vice President & Plant General Manager Reviewed Event W/Operations Mgt & Other Key Site Personnel
ML17228A854
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/15/1994
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-233, NUDOCS 9409210319
Download: ML17228A854 (4)


Text

PRIDRITY ACCELERATED RIDS PROCESSING) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9409210319 DOC.DATE: 94/09/15 NOTARIZED: NO DOCKET ¹ FACIL:50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION GOLDBERG,J.H. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to notice of violations noted in insp rept 50-389/94-15.Corrective actions:plant shutdown & entered mode 3 on 940714.

DISTRIBUTION'CODE: IE01D COPIES RECEIVED LTR ENCL 0 SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD NORRIS,J INTERNAL: ACRS AEOD/DEIB AEOD/BPD/RAB AEOD/SPD/RRAB ME~0/<TC DEDRO F2TEl CENTER 02 NRR/DORS/OEAB NRR/'DRCH/HHFB NRR/PMAS/IRCB-E NU DOCS-ABSTRACT OE DIR OGC/HDS3 RES/HFB RGN2 FILE 01 EXTERNAL EG&G/BRYCE i J ~ H NOAC NRC PDR NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELINIINATEYOUR NAME FROil DISTRIBUTION LISTS FOR DOCI.'MENTS YOU DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 21 ENCL

Florida Power 8c Light Company, P.O. Box 14000, Juno Beach, FL 33408-0420 FPL SEP 1 5 199'f L-94-233 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: St. Lucie Unit 2 Docket No. 50-389 Reply to Notice of Violation Ins ection Re ort 94-15 Florida Power and Light Company (FPL) has reviewed the subject inspection report and pursuant to

~

10 CFR 2.201 the response to the notice of violation is attached.

~ ~ ~ ~

Very truly yours, J. H. Goldberg President - Nuclear Division JHG/JWH/kw Attachment cc: Stewart D. Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St. Lucie Plant DAS/PSL N1196-94 9409210319 9409'15 PDR ADOCK 0500038rr' PDR an FPL Group company

Re: St. Lucie Uni 2 Docket No. 50-389 Reply to Notice of Violation Zns ection Re ort 94-15 VIOLATION:

St. Lucie Unit 2 Technical Specification 3.3.1, Table 3.3-1, item 12, required, in part, that 4 channels of TCBs be operable in Mode

1. The associated LCO action statement required that an inoperable channel be placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />; otherwise, the unit was required to be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

Contrary to the above, on July 14, 1994, when Trip Circuit Breaker TCB-5 'failed to open when required, was declared inoperable, and the breaker's failure mode prevented placing the affected channel in the tripped condition, the associated shutdown to Mode 3 was not performed in the required 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

While the unit was ultimately shut down, entrance into Mode, 3 occurred approximately 7-1/2 hours after declaring the Trip Circuit Breaker inoperable. Further, the shutdown was premised on a management directive, as opposed to a Technical Specif ication requirement. While the licensee interrupted TCB-5's electrical flow path by opening Trip Circuit Breakers TCB-1, TCB-2, and TCB-6, the subject Technical Specification action statement was prescriptive in requiring that either Trip Circuit Breaker TCB-5 be opened or that the unit be shut down.

RESPONSE

REASON FOR VIOLATION FPL concurs that a violation existed. The root cause of the violation was personnel error on the part of Operations Management.

2. CORRECTIVE STEPS TAKEN AND THE RESULTS ACHIEVED The plant was shutdown and entered Mode 3 at 11:06 a.m. on July 14, 1994.
3. CORRECTIVE STEPS TO AVOID FURTHER VIOLATIONS The Site Vice President and Plant General Manager have reviewed this event with Operations Management and other key site personnel. The need for strict adherence to Technical Specifications has been emphasized.

B. Operations Management have be'en made aware that other sources within the Nuclear Division are available to aid in their decision making process when events arise that involve complex or previously unencountered situations.

4. DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full compliance was achieved when the plant entered Mode 3 at 11:06 a.m. on July 14, 1994.