{{#Wiki_filter:April 13, 2006  
{{#Wiki_filter:April 13, 2006 TVA-BFN-TS-418 TVA-BFN-TS-431 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop OWFN, P1-35 Washington, D. C. 20555-0001 Gentlemen:
 
In the Matter of           )             Docket Nos. 50-259 Tennessee Valley Authority )                         50-260
TVA-BFN-TS-418  
                            )                         50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, AND 3 -
 
TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -
TVA-BFN-TS-431  
EXTENDED POWER UPRATE (EPU) OPERATION - REVISED RESPONSES TO NRC ROUND 2 REQUESTS FOR ADDITIONAL INFORMATION - (TAC NOS.
 
10 CFR 50.90  
 
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk
 
Mail Stop OWFN, P1-35  
 
Washington, D. C. 20555-0001  
 
Gentlemen:  
 
In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260
) 50-296
 
BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, AND 3 -
TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -  
 
EXTENDED POWER UPRATE (EPU) OPERATION - REVISED RESPONSES TO  
 
NRC ROUND 2 REQUESTS FOR ADDITIONAL INFORMATION - (TAC NOS.  
 
MC3812, MC3743, AND MC3744)
MC3812, MC3743, AND MC3744)
By letters dated December 19, 2005 (ADAMS Accession Nos.  
By letters dated December 19, 2005 (ADAMS Accession Nos.
ML053560194 and ML053560186) TVA submitted responses to NRC Round 2 requests for additional information (RAIs) regarding TVAs applications for extended power uprate of BFN Unit 1 and BFN Units 2 and 3, respectively. As a result of discussions with the NRC staff, TVA is revising its responses to five of the RAIs. The responses to the subject RAIs are the same for all three BFN units. to this letter provides revised responses to RAIs IPSB-B.1 and IPSB-B.8 regarding external radiation doses due to direct radiation and skyshine. Enclosure 2 to this letter provides revised responses to RAIs SPLB-A.1, SPLB-A.2 and SPLB-A.3 regarding fuel pool cooling. Each revised RAI response in Enclosure 1 supersedes the response previously provided to the NRC staff. However, the responses in  supplement the previous responses to the respective RAIs.


ML053560194 and ML053560186) TVA submitted responses to NRC
U.S. Nuclear Regulatory Commission Page 2 April 13, 2006 Item 3.1.2(5) of the Supplemental Reply to RAIs SPLB-A.1, 2, and 3 in Enclosure 2 is not complete. As discussed with the NRC staff on April 13, 2006, TVA will address this item in a supplemental reply. identifies a regulatory commitment made in  to modify the administrative controls regarding spent fuel pool cooling operations.
If you have any questions regarding this letter, please contact me at (256)729-2636.
I declare under penalty of perjury that the foregoing is true and correct. Executed on this 13th day of April, 2006.
Sincerely, Original signed by:
William D. Crouch Manager of Licensing and Industry Affairs


Round 2 requests for additional information (RAIs) regarding
==Enclosures:==
 
TVA's applications for extended power uprate of BFN Unit 1 and
 
BFN Units 2 and 3, respectively. As a result of discussions
 
with the NRC staff, TVA is revising its responses to five of
 
the RAIs. The responses to the subject RAIs are the same for
 
all three BFN units.
 
to this letter provides revised responses to RAIs
 
IPSB-B.1 and IPSB-B.8 regarding external radiation doses due
 
to direct radiation and skyshine. Enclosure 2 to this letter
 
provides revised responses to RAIs SPLB-A.1, SPLB-A.2 and
 
SPLB-A.3 regarding fuel pool cooling. Each revised RAI
 
response in Enclosure 1 supersedes the response previously
 
provided to the NRC staff. However, the responses in supplement the previous responses to the
 
respective RAIs.
U.S. Nuclear Regulatory Commission Page 2 April 13, 2006 Item 3.1.2(5) of the Supplemental Reply to RAIs SPLB-A.1, 2, and 3 in Enclosure 2 is not complete. As discussed with the
 
NRC staff on April 13, 2006, TVA will address this item in a
 
supplemental reply.
 
identifies a regulatory commitment made in to modify the administrative controls regarding
 
spent fuel pool cooling operations.
 
If you have any questions regarding this letter, please
 
contact me at (256)729-2636.
 
I declare under penalty of perjury that the foregoing is true
 
and correct. Executed on this 13 th day of April, 2006.
 
Sincerely, 
 
Original signed by:  
 
William D. Crouch
 
Manager of Licensing
 
and Industry Affairs
 
Enclosures
: 1. Revised Responses to RAIs IPSB-B.1 and IPSB-B.8
: 1. Revised Responses to RAIs IPSB-B.1 and IPSB-B.8
: 2. Supplements to Responses to RAIs SPLB-A.1, SPLB-A.2 and SPLB-A.3 3. Commitment Listing  
: 2. Supplements to Responses to RAIs SPLB-A.1, SPLB-A.2 and SPLB-A.3
: 3. Commitment Listing cc (See page 3.)


cc (See page 3.)
U.S. Nuclear Regulatory Commission Page 3 April 13, 2006
U.S. Nuclear Regulatory Commission Page 3 April 13, 2006  


==Enclosures:==
==Enclosures:==


cc (Enclosures):
cc (Enclosures):
State Health Officer Alabama Dept. of Public Health  
State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 Malcolm T. Widmann, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Unit 1 Restart Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)
 
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739
RSA Tower - Administration  
 
Suite 1552  
 
P.O. Box 303017  
 
Montgomery, AL 36130-3017  
 
U.S. Nuclear Regulatory Commission  
 
Region II  
 
Sam Nunn Atlanta Federal Center  


61 Forsyth Street, SW, Suite 23T85
U.S. Nuclear Regulatory Commission Page 4 April 13, 2006 JEM:LTG:BAB Enclosures cc (Enclosures):
B. M. Aukland, POB 2C-BFN M. Bajestani, NAB 1A-BFN A. S. Bhatnagar, LP 6A-C J. C. Fornicola, LP 6A-C R. G. Jones, POB 2C-BFN G. V. Little, NAB 1A-C R. F. Marks, Jr., PAB 1C-BFN G. W. Morris, LP 4G-C B. J. OGrady, PAB 1E-BFN K. W. Singer, LP 6A-C E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT CA-K, w.
s:lic/submit/TechSpec/TS 418 and 431 - Revised RAIs.doc


Atlanta, Georgia  30303-3415
ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
 
Malcolm T. Widmann, Branch Chief
 
U.S. Nuclear Regulatory Commission
 
Region II
 
Sam Nunn Atlanta Federal Center
 
61 Forsyth Street, SW, Suite 23T85
 
Atlanta, Georgia  30303-8931
 
NRC Senior Resident Inspector
 
Browns Ferry Nuclear Plant
 
10833 Shaw Road
 
Athens, Alabama  35611-6970
 
NRC Unit 1 Restart Senior Resident Inspector
 
Browns Ferry Nuclear Plant
 
10833 Shaw Road
 
Athens, Alabama  35611-6970
 
Margaret Chernoff, Project Manager
 
U.S. Nuclear Regulatory Commission (MS 08G9)
 
One White Flint, North
 
11555 Rockville Pike
 
Rockville, Maryland  20852-2739
 
U.S. Nuclear Regulatory Commission Page 4 April 13, 2006 JEM:LTG:BAB Enclosures
 
cc (Enclosures):
B. M. Aukland, POB 2C-BFN 
 
M. Bajestani, NAB 1A-BFN
 
A. S. Bhatnagar, LP 6A-C
 
J. C. Fornicola, LP 6A-C
 
R. G. Jones, POB 2C-BFN
 
G. V. Little, NAB 1A-C
 
R. F. Marks, Jr., PAB 1C-BFN
 
G. W. Morris, LP 4G-C
 
B. J. O'Grady, PAB 1E-BFN
 
K. W. Singer, LP 6A-C 
 
E. J. Vigluicci, ET 11A-K
 
NSRB Support, LP 5M-C
 
EDMS WT CA-K, w.
s:lic/submit/TechSpec/TS 418 and 431 - Revised RAIs.doc
 
E1-1 ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -
UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -
REVISED RESPONSES TO NRC ROUND 2 REQUESTS FOR ADDITIONAL INFORMATION -
REVISED RESPONSES TO NRC ROUND 2 REQUESTS FOR ADDITIONAL INFORMATION - IPSB-B.1 and IPSB-B.8 By letters dated December 19, 2005 (ADAMS Accession Nos.
IPSB-B.1 and IPSB-B.8 By letters dated December 19, 2005 (ADAMS Accession Nos.
ML053560194 and ML053560186) TVA submitted responses to NRC Round 2 requests for additional information (RAIs) regarding TVAs applications for extended power uprate of BFN Unit 1 and BFN Units 2 and 3, respectively. As a result of discussions with the NRC staff, TVA is superseding its prior responses to RAIs IPSB-B.1 and IPSB-B.8 regarding external radiation doses due to direct radiation and skyshine. The responses to the subject RAIs are the same for all three BFN units.
ML053560194 and ML053560186) TVA submitted responses to NRC
NRC Request IPSB-B.1 Section 8.6, Normal Operations Off-Site Doses, of Enclosure 4 of the [June 25, 2004 and June 28, 2004 submittals for BFN Units 2 and 3 and BFN Unit 1, respectively] states that radiation from shine (offsite) is not presently a significant exposure pathway and is not significantly affected by EPU. This conclusion is based on the experience of earlier 5-percent power uprates for Units 2 and 3. Also, Section 8.2.2, Offsite Doses at Power Uprate Conditions, of the Environmental Report states that N-16 activity in the Turbine Building will increase linearly with EPU.
 
The magnitude of the N-16 source term in the Turbine Buildings is not a simple linear increase with reactor power. The equilibrium concentration of N-16 in the Turbine Building systems will be effected (an inverse exponential function) by the decreased decay resulting from the increased steam/feed flow between the reactor and the Turbine Building. Implementation of hydrogen injection water chemistry also increases N-16 concentrations in reactor steam independently of reactor power.
Round 2 requests for additional information (RAIs) regarding  
Provide the present nominal value for the skyshine external dose component (assuming all three units operating at current licensed power levels), the corresponding estimated dose component following EPU (assuming all three units operating at the requested power, and design basis steam activity, levels).
 
Include all parameters (i.e., flow rates, system component dimensions, etc.) used in calculating these values and specify the calculational method used. Identify the limiting dose receptor (i.e., is the dose receptor a member of the public E1-1
TVA's applications for extended power uprate of BFN Unit 1 and  
 
BFN Units 2 and 3, respectively. As a result of discussions with  
 
the NRC staff, TVA is superseding its prior responses to RAIs  
 
IPSB-B.1 and IPSB-B.8 regarding external radiation doses due to  
 
direct radiation and skyshine. The responses to the subject RAIs  
 
are the same for all three BFN units.
NRC Request IPSB-B.1 Section 8.6, Normal Operations Off-Site Doses, of Enclosure 4 of the [June 25, 2004 and June 28, 2004 submittals for BFN Units 2  
 
and 3 and BFN Unit 1, respectively] states that radiation from  
 
shine (offsite) is not presently a significant exposure pathway  
 
and is not significantly affected by EPU. This conclusion is  
 
based on the experience of earlier 5-percent power uprates for  
 
Units 2 and 3. Also, Section 8.2.2, Offsite Doses at Power  
 
Uprate Conditions, of the Environmental Report states that N-16  
 
activity in the Turbine Building will increase linearly with EPU.  
 
The magnitude of the N-16 source term in the Turbine Buildings is  
 
not a simple linear increase with reactor power. The equilibrium  
 
concentration of N-16 in the Turbine Building systems will be  
 
effected (an inverse exponential function) by the decreased decay  
 
resulting from the increased steam/feed flow between the reactor  
 
and the Turbine Building. Implementation of hydrogen injection  
 
water chemistry also increases N-16 concentrations in reactor  
 
steam independently of reactor power.  
 
Provide the present nominal value for the skyshine external dose  
 
component (assuming all three units operating at current licensed  
 
power levels), the corresponding estimated dose component  
 
following EPU (assuming all three units operating at the  
 
requested power, and design basis steam activity, levels).


Include all parameters (i.e., flow rates, system component
located offsite and, therefore, subject to the dose limits of 40 CFR Part 190) or a member of the public working onsite (subject to the dose limits of 20.1301)). Describe any increases in doses for onsite spaces (i.e., Administrative offices, guard stations, etc.) continuously or routinely occupied by plant visitors or staff.
 
TVA Reply to IPSB-B.1 A number of studies have been conducted at BFN to characterize the direct radiation and building/atmospheric scatter skyshine radiation fields associated with increased N-16 and C-15 production from hydrogen injection into the feedwater system for mitigation of intergrannular stress corrosion cracking (IGSCC) of vessel internals. Radiation levels onsite have been measured with thermoluminescent dosimeters (TLD), pressurized ionization chambers (PIC), and hyper-pure germanium detectors.
dimensions, etc.) used in calculating these values and specify
In 1997, while Units 2 and 3 were operating at original licensed thermal power (OLTP) (i.e., 3293 MWt), and prior to the injection of hydrogen in the feedwater system on either unit, GE Nuclear Energy performed extensive surveys of site radiation levels. A subsequent report, GE-NE-P7300044-01-01-00, Browns Ferry Nuclear Power Station, Potential Dose Consequences Resulting From Implementation of Hydrogen Water Chemistry, provides dose rate projections through a number of shield wall thicknesses as a function of distance from BFN units under OLTP and normal water chemistry conditions. The projections were based on the output from the mathematical model provided in BWR Turbine Equipment N-16 Radiation Shielding Studies, by D. R. Rogers, General Electric NEDO-20206, 1973, normalized to a PIC radiation measurement in line with the operating turbines at the north end of the electrical switchyard. This location was chosen because it is unaffected by other sources of radiation such as from radwaste processing/shipment or the condensate storage tanks.
 
The report provided projections in-line with the turbines and normal to them. As the former were slightly more conservative (i.e., provided higher values), they were used for dose rate projections in occupied areas onsite. The dose rate projection curves in the report extend to 2000 feet from the turbine center line. The projection curves were then extrapolated in order to project site boundary doses. The dose rate at the nearest site boundary (i.e., 3850 feet) was projected to be 0.04 µR/h per unit under OLTP and normal water chemistry conditions. This equates to a total annual dose of approximately 1.1 mrem from all three units at OLTP.
the calculational method used. Identify the limiting dose
Components on the turbine deck which contribute to the skyshine include: the piping to and from the high pressure turbine, the high pressure turbine, the crossover piping from the moisture separators to the low pressure turbines, the combined intercept E1-2
 
receptor (i.e., is the dose receptor a member of the public E1-2 located offsite and, therefore, subject to the dose limits of 40 CFR Part 190) or a member of the public working onsite (subject to the dose limits of 20.1301)). Describe any increases  
 
in doses for onsite spaces (i.e., Administrative offices, guard  
 
stations, etc.) continuously or routinely occupied by plant  
 
visitors or staff.
TVA Reply to IPSB-B.1 A number of studies have been conducted at BFN to characterize the direct radiation and building/atmospheric scatter skyshine  
 
radiation fields associated with increased N-16 and C-15  
 
production from hydrogen injection into the feedwater system for  
 
mitigation of intergrannular stress corrosion cracking (IGSCC) of  
 
vessel internals. Radiation levels onsite have been measured  
 
with thermoluminescent dosimeters (TLD), pressurized ionization  
 
chambers (PIC), and hyper-pure germanium detectors.  
 
In 1997, while Units 2 and 3 were operating at original licensed  
 
thermal power (OLTP) (i.e., 3293 MWt), and prior to the injection  
 
of hydrogen in the feedwater system on either unit, GE Nuclear  
 
Energy performed extensive surveys of site radiation levels. A  
 
subsequent report, GE-NE-P7300044-01-01-00, "Browns Ferry Nuclear  
 
Power Station, Potential Dose Consequences Resulting From  
 
Implementation of Hydrogen Water Chemistry," provides dose rate  
 
projections through a number of shield wall thicknesses as a  
 
function of distance from BFN units under OLTP and normal water  
 
chemistry conditions. The projections were based on the output  
 
from the mathematical model provided in "BWR Turbine Equipment
 
N-16 Radiation Shielding Studies," by D. R. Rogers, General  
 
Electric NEDO-20206, 1973, normalized to a PIC radiation  
 
measurement in line with the operating turbines at the north end  
 
of the electrical switchyard. This location was chosen because  
 
it is unaffected by other sources of radiation such as from  
 
radwaste processing/shipment or the condensate storage tanks.
 
The report provided projections in-line with the turbines and  
 
normal to them. As the former were slightly more conservative (i.e., provided higher values), they were used for dose rate  
 
projections in occupied areas onsite. The dose rate projection  
 
curves in the report extend to 2000 feet from the turbine center  
 
line. The projection curves were then extrapolated in order to  
 
project site boundary doses. The dose rate at the nearest site  
 
boundary (i.e., 3850 feet) was projected to be 0.04 µR/h per unit  
 
under OLTP and normal water chemistry conditions. This equates  
 
to a total annual dose of approximately 1.1 mrem from all three  
 
units at OLTP.
 
Components on the turbine deck which contribute to the skyshine  
 
include: the piping to and from the high pressure turbine, the  
 
high pressure turbine, the crossover piping from the moisture  
 
separators to the low pressure turbines, the combined intercept E1-3 valves and the low pressure turbines. According to the GE report (GE-NE-P7300044-01-01-00), the vast majority (~72%) of the
 
skyshine emanates from N-16 and C-15 in the steam traversing the
 
crossover piping. Based on this, the change in travel time of
 
the steam to the midpoint of the crossover piping was calculated
 
for OLTP, current licensed thermal power (CLTP) (i.e., 3458 MWt)
 
and EPU (i.e., 3952 MWt) conditions. Steam travel times were
 
calculated based on the steam flow rates for each of the power
 
levels, piping layouts, and component configurations. The
 
calculated travel times are shown in the following table:


valves and the low pressure turbines. According to the GE report (GE-NE-P7300044-01-01-00), the vast majority (~72%) of the skyshine emanates from N-16 and C-15 in the steam traversing the crossover piping. Based on this, the change in travel time of the steam to the midpoint of the crossover piping was calculated for OLTP, current licensed thermal power (CLTP) (i.e., 3458 MWt) and EPU (i.e., 3952 MWt) conditions. Steam travel times were calculated based on the steam flow rates for each of the power levels, piping layouts, and component configurations. The calculated travel times are shown in the following table:
Table IPSB-B.1-1 STEAM TRAVEL TIME Steam travel time to crossover piping mid-point (seconds)
Table IPSB-B.1-1 STEAM TRAVEL TIME Steam travel time to crossover piping mid-point (seconds)
OLTP (3,293 MWt)
OLTP             CLTP            EPU (3,293 MWt)     (3,458 MWt)     (3,952 MWt)
CLTP (3,458 MWt)
Unit 1         10.70               NA             8.93 Unit 2         10.49             10.12           8.63 Unit 3         10.47             10.10           8.62 The radiological decay of N-16 and C-15 was then calculated for those travel times, and a fractional increase in the radiation level was determined for each condition. The results for operation of all three BFN units were: an approximate 10%
EPU (3,952 MWt) Unit 1 10.70 NA 8.93 Unit 2 10.49 10.12 8.63 Unit 3 10.47 10.10 8.62 The radiological decay of N-16 and C-15 was then calculated for  
increase from OLTP to CLTP and an approximate 32% increase from CLTP to EPU.
 
By applying these increases to the GE dose projection for the OLTP condition, the annual dose to members of the public offsite and onsite were determined for CLTP and EPU under normal water chemistry conditions (i.e., no hydrogen injection). For calculation purposes, assuming three units at CLTP and EPU, the annual dose to a member of the public at the nearest terrestrial site boundary would be 1.2 and 1.5 mrem, respectively. Currently both Unit 2 and Unit 3 are operating with the addition of Noble Chem' (platinum and rhodium) to the reactor coolant system and with reduced hydrogen injection in the feedwater for IGSCC mitigation. For three units at CLTP under reduced hydrogen injection, these values would be increased by approximately 25%
those travel times, and a fractional increase in the radiation  
to 1.4 and 1.9 mrem, respectively. The total dose to a member of the public includes effluent doses; however, these are negligible in comparison to the direct and skyshine radiation doses.
 
E1-3
level was determined for each condition. The results for  
 
operation of all three BFN units were: an approximate 10%  
 
increase from OLTP to CLTP and an approximate 32% increase from  
 
CLTP to EPU.  
 
By applying these increases to the GE dose projection for the  
 
OLTP condition, the annual dose to members of the public offsite  
 
and onsite were determined for CLTP and EPU under normal water  
 
chemistry conditions (i.e., no hydrogen injection). For  
 
calculation purposes, assuming three units at CLTP and EPU, the  
 
annual dose to a member of the public at the nearest terrestrial  
 
site boundary would be 1.2 and 1.5 mrem, respectively. Currently  
 
both Unit 2 and Unit 3 are operating with the addition of Noble  
 
ChemŽ (platinum and rhodium) to the reactor coolant system and  
 
with reduced hydrogen injection in the feedwater for IGSCC  
 
mitigation. For three units at CLTP under reduced hydrogen  
 
injection, these values would be increased by approximately 25%  
 
to 1.4 and 1.9 mrem, respectively. The total dose to a member of  
 
the public includes effluent doses; however, these are negligible  
 
in comparison to the direct and skyshine radiation doses.
E1-4 Therefore, the projected annual doses are well within the 25 mrem dose limit of 40 CFR 190 for an offsite member of the public.
 
The limiting dose receptors for members of the public would be
 
those onsite (e.g., food vendors) because their work locations
 
are nearer to the turbine building. The maximum annual dose to
 
vendors would not likely exceed 18 mrem under EPU and Noble ChemŽ
 
water chemistry and reduced hydrogen injection conditions on all
 
three units. Consequently, the 10 CFR 20.1301 annual dose limit
 
of 100 mrem for a member of the public onsite would not be
 
exceeded. Therefore, the projected annual dose to an onsite
 
member of the public will be well within the dose limit.
 
Furthermore, following Unit 1 restart, with the reduction in
 
restart workers and the re-location of a major portion of the
 
site population into permanent structures farther from the
 
turbine building, the increase in collective site dose from
 
direct and skyshine radiation external to the plant structure is
 
projected to be approximately 10 person-rem per year for three
 
units at EPU conditions under Noble ChemŽ water chemistry and
 
reduced hydrogen injection.
 
NRC Request IPSB-B.8 Section 8.5.1, Normal Operations, of Enclosure 4 of the [June 25, 2004 and June 28, 2004 submittals for BFN Units 2 and 3 and BFN
 
Unit 1, respectively] submittal states that, due to the
 
conservative shielding design, the increase in radiation levels
 
resulting from EPU will not affect the radiation zones for the
 
various areas of the plant. This appears to be based on an
 
assumed linear increase in radiation source term with power
 
level. However, the increase in N-16 activity in the turbine
 
building is an inverse exponential function with decay time, not
 
a linear function of reactor power. Verify that the radiation
 
zoning in all areas containing the steam and feed systems will be
 
unaffected by EPU.
TVA Reply to IPSB-B.8 Under current licensed thermal power (CLTP) (i.e., 3458 MWt) conditions for BFN Units 2 and 3 with Noble ChemŽ water chemistry
 
and reduced hydrogen injection in the feedwater for IGSCC
 
mitigation, all of the steam-affected areas, with the exception
 
of the reactor feed pump turbine rooms, are locked high radiation
 
areas (LHRA). This includes the reactor and turbine steam
 
tunnels, moisture separator rooms, turbine rooms, high and low
 
pressure heater rooms, condenser rooms, moisture separator drain
 
pump and tank rooms, steam packing exhauster rooms, steam jet air
 
ejector rooms, and hydrogen recombiner rooms. The reactor feed
 
pump turbine rooms are posted as radiation areas at the entrances
 
with smaller high radiation areas located inside the rooms E1-5 enclosing the turbine and pump areas. The areas on the turbine roof over the turbine rooms are controlled as high radiation
 
areas. Although BFN Unit 1 is currently not operating, nor is it
 
currently licensed to operate above 3293 MWt, it is expected that
 
its radiation levels will be consistent with the radiation levels
 
of Units 2 and 3.
 
Under EPU conditions, the radiation levels are conservatively
 
expected to increase by approximately 32% over the CLTP
 
conditions. This is based on increased steam flow, reduction in
 
steam travel time, and reduction in the radiological decay of 
 
N-16 and C-15. However this increase will not be enough to
 
require changing the radiation area posting at the entrance to
 
the rooms. In addition, the radiation zoning and posting outside
 
the steam-affected area rooms are not expected to change due
 
to EPU.


To ensure that proper postings are maintained, dose rates will be  
Therefore, the projected annual doses are well within the 25 mrem dose limit of 40 CFR 190 for an offsite member of the public.
The limiting dose receptors for members of the public would be those onsite (e.g., food vendors) because their work locations are nearer to the turbine building. The maximum annual dose to vendors would not likely exceed 18 mrem under EPU and Noble Chem' water chemistry and reduced hydrogen injection conditions on all three units. Consequently, the 10 CFR 20.1301 annual dose limit of 100 mrem for a member of the public onsite would not be exceeded. Therefore, the projected annual dose to an onsite member of the public will be well within the dose limit.
Furthermore, following Unit 1 restart, with the reduction in restart workers and the re-location of a major portion of the site population into permanent structures farther from the turbine building, the increase in collective site dose from direct and skyshine radiation external to the plant structure is projected to be approximately 10 person-rem per year for three units at EPU conditions under Noble Chem' water chemistry and reduced hydrogen injection.
NRC Request IPSB-B.8 Section 8.5.1, Normal Operations, of Enclosure 4 of the [June 25, 2004 and June 28, 2004 submittals for BFN Units 2 and 3 and BFN Unit 1, respectively] submittal states that, due to the conservative shielding design, the increase in radiation levels resulting from EPU will not affect the radiation zones for the various areas of the plant. This appears to be based on an assumed linear increase in radiation source term with power level. However, the increase in N-16 activity in the turbine building is an inverse exponential function with decay time, not a linear function of reactor power. Verify that the radiation zoning in all areas containing the steam and feed systems will be unaffected by EPU.
TVA Reply to IPSB-B.8 Under current licensed thermal power (CLTP) (i.e., 3458 MWt) conditions for BFN Units 2 and 3 with Noble Chem' water chemistry and reduced hydrogen injection in the feedwater for IGSCC mitigation, all of the steam-affected areas, with the exception of the reactor feed pump turbine rooms, are locked high radiation areas (LHRA). This includes the reactor and turbine steam tunnels, moisture separator rooms, turbine rooms, high and low pressure heater rooms, condenser rooms, moisture separator drain pump and tank rooms, steam packing exhauster rooms, steam jet air ejector rooms, and hydrogen recombiner rooms. The reactor feed pump turbine rooms are posted as radiation areas at the entrances with smaller high radiation areas located inside the rooms E1-4


monitored in these environs during power ascension as part of the  
enclosing the turbine and pump areas. The areas on the turbine roof over the turbine rooms are controlled as high radiation areas. Although BFN Unit 1 is currently not operating, nor is it currently licensed to operate above 3293 MWt, it is expected that its radiation levels will be consistent with the radiation levels of Units 2 and 3.
Under EPU conditions, the radiation levels are conservatively expected to increase by approximately 32% over the CLTP conditions. This is based on increased steam flow, reduction in steam travel time, and reduction in the radiological decay of N-16 and C-15. However this increase will not be enough to require changing the radiation area posting at the entrance to the rooms. In addition, the radiation zoning and posting outside the steam-affected area rooms are not expected to change due to EPU.
To ensure that proper postings are maintained, dose rates will be monitored in these environs during power ascension as part of the planned EPU testing.
E1-5


planned EPU testing.
ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
E2-1 ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -
UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -
SUPPLEMENTS TO RESPONSES TO NRC ROUND 2 REQUESTS FOR ADDITIONAL INFORMATION -
SUPPLEMENTS TO RESPONSES TO NRC ROUND 2 REQUESTS FOR ADDITIONAL INFORMATION - SPLB-A.1, SPLB-A.2 and SPLB-A.3 By letters dated December 19, 2005 (ADAMS Accession Nos.
SPLB-A.1, SPLB-A.2 and SPLB-A.3 By letters dated December 19, 2005 (ADAMS Accession Nos.  
ML053560194 and ML053560186) TVA submitted responses to NRC Round 2 requests for additional information (RAIs) regarding TVAs applications for extended power uprate of BFN Unit 1 and BFN Units 2 and 3, respectively. As a result of discussions with the NRC staff, TVA is supplementing its prior responses to RAIs SPLB-A.1, SPLB-A.2 and SPLB-A.3 regarding fuel pool cooling. The responses to the subject RAIs are the same for all three BFN units.
 
NRC Request SPLB-A.1 Section 10.5.5 of the Updated Final Safety Analysis Report (UFSAR), Revision 17 dated August 30, 1999, revised the discussion from the UFSAR that was previously provided regarding the maximum SFP heat load for batch and full core offloads. In order to facilitate NRC review of the capability of the SFPCCS to perform its function for EPU conditions, provide a discussion on the safety-related systems required to maintain fuel pool cooling within design bases temperature limits.
ML053560194 and ML053560186) TVA submitted responses to NRC
NRC Request SPLB-A.2 For EPU conditions, explain how the SFP water temperature will be maintained below 150 degrees Fahrenheit (F) for the worst-case normal (batch) and full core offload scenarios assuming a loss of offsite power and (for the batch offload only) a concurrent single active failure considering all possible initial configurations that can exist. Include a description of the maximum decay heat load that will exist in the SFP for each case, how these heat loads were determined, such that they represent the worst-case conditions, and what the cooling capacity is for the systems that are credited, including how this determination was made. Also:
 
: a. Describe any operator actions that are required, how long it will take to complete these actions, and how this determination was made; and
Round 2 requests for additional information (RAIs) regarding  
: b. Describe the maximum core decay heat load that will exist at the onset of fuel movement, how this determination was made, how this heat load will be accommodated while also satisfying E2-1


TVA's applications for extended power uprate of BFN Unit 1 and  
the SFP cooling requirements over the duration of the respective fuel offload scenarios, and including the situation where the SFP is isolated from the reactor vessel cavity.
NRC Request SPLB-A.3 Discuss how adequate SFP makeup capability is assured for EPU conditions in the unlikely event of a complete loss of SFP cooling capability, including how the maximum possible SFP boil-off rate compares with the assured makeup capability that exists, operator actions that must be taken, how long it will take to complete these actions and how this determination was made, and boron dilution considerations.
TVAs Supplemental Reply to SPLB-A.1, 2, and 3 TVA has previously provided information regarding the spent fuel pool cooling system at BFN and the effects of EPU in PUSAR Section 6.3 and in the December 19, 2005, reply to questions SPLB-A.1, SPLB-A.2, and SPLB-A.3. The following discussion is provided to clarify and provide supplemental information on the BFN spent fuel pool cooling system and is presented in the format (including numbering) of Attachment 2 to Matrix 5 of RS-001, "Review Standard for Extended Power Uprates," Revision 0, December 2003.
: 1. BACKGROUND The BFN fuel pool cooling and cleanup systems for Units 1, 2, and 3 are described in UFSAR Section 10.5. The systems cool the fuel storage pools by transferring the spent fuel decay heat through heat exchangers to the reactor building closed cooling water (RBCCW) systems. The system for each fuel pool consists of two circulating pumps connected in parallel, two heat exchangers, one filter demineralizer subsystem, two skimmer surge tanks, and the required piping, valves, and instrumentation. Four filter demineralizers are provided including one spare filter demineralizer shared between the three units. The pumps circulate the pool water in a closed loop, taking suction from the surge tanks, circulating the water through the heat exchangers and filter demineralizer, and discharging it through diffusers at the bottom of the fuel pool and reactor well (as required during refueling operations). The water flows from the pool surface through skimmer weirs and scuppers (wave suppressers) to the surge tanks.
The heat exchangers in the residual heat removal (RHR) system can be used in conjunction with the fuel pool cooling and cleanup system to supplement pool cooling (supplemental fuel pool cooling). Normal makeup water for the fuel pool cooling E2-2


BFN Units 2 and 3, respectively. As a result of discussions with
system is transferred from the condensate storage tank to the skimmer surge tanks. A seismic Class I qualified source of makeup water is provided through the crosstie between the RHR system and fuel pool cooling system. If necessary, the intertie between the RHR service water (RHRSW) system and the RHR system can be utilized to admit raw water as makeup.
Also, a standpipe and hose connection is provided on each of the two emergency equipment cooling water (EECW) system headers which provide two additional fuel pool water makeup sources.
Additionally, the auxiliary decay heat removal (ADHR) system provides another means to remove decay heat and residual heat from the spent fuel pool and reactor cavity of BFN Units 2 and 3 and is described in UFSAR Section 10.22. As part of restart activities for BFN Unit 1, the ADHR system will be extended to include the spent fuel pool and reactor cavity of BFN Unit 1. During operation of this system, it is aligned to only one unit at a time. The ADHR system consists of two cooling water loops. The primary cooling loop circulates spent fuel pool water entirely inside the Reactor Building and rejects heat to a secondary loop by means of a heat exchanger. The secondary loop transfers heat to the atmosphere outside the Reactor Building by means of evaporative cooling towers.
Spent fuel pool cooling, including supplemental fuel pool cooling and ADHR, are non-safety systems. To ensure adequate makeup under all normal and off normal conditions, the RHR/RHRSW connection provides a permanently installed seismic Class I qualified makeup water source for the spent fuel pool. This ensures that irradiated fuel is maintained submerged in water and that reestablishment of normal fuel pool water level is possible under all anticipated conditions. Two additional sources of spent fuel pool water makeup are provided via a standpipe and hose connection on each of the two EECW headers. Each hose is capable of supplying makeup water in sufficient quantity to maintain fuel pool water level under conditions of no fuel pool cooling.
: 2. ACCEPTANCE CRITERIA The current design and operational basis for BFN spent fuel pool cooling system is as follows:
* Administrative controls are used to ensure that the fuel pool heat load does not exceed available cooling capacity.
* The capacity of the spent fuel pool cooling and the ADHR systems, considering seasonal cooling water temperatures and current heat exchanger conditions, are utilized to E2-3


the NRC staff, TVA is supplementing its prior responses to RAIs
maintain the fuel pool temperature at or below 125°F during normal refueling outages (average spent fuel batch discharged from the equilibrium fuel cycle).
* The RHR system can be operated in parallel with the spent fuel pool cooling system to maintain the fuel pool temperature less than the Technical Requirements Manual (TRM) limit of 150°F if a full core off load is performed.
Plant instructions require that actions be taken well before exceeding this limit. The fuel pool temperature is normally maintained between 72°F and 125°F.
* To ensure adequate makeup under all normal and off normal conditions (i.e. fuel pool water boil off), the RHR/RHRSW crosstie provides a permanently installed seismic Class I qualified makeup water source for the spent fuel pool.
* Two additional sources of spent fuel pool water makeup are provided via a standpipe and hose connection on each of the two EECW headers. Each hose is capable of supplying makeup water in sufficient quantity to maintain fuel pool water level under conditions of no fuel pool cooling.
The design basis for the fuel pool cooling systems remains the same for the current and EPU conditions.
: 3. REVIEW PROCEDURES 3.1 Adequate SFP Cooling Capacity To demonstrate adequate SFP cooling capacity, BFN performs both bounding and cycle-specific calculations. The bounding calculations have been reperformed for EPU conditions as described below in Section 3.1.1 to ensure that the acceptance criteria will continue to be met. Additionally, as described in Section 3.1.2, cycle-specific calculations are performed to assess cooling system capability to ensure that fuel pool heat load does not exceed available cooling capacity. These calculations demonstrate that the acceptance criteria described in Section 2 will continue to be met under EPU conditions.
As a result of EPU, the normal spent fuel pool heat load will be higher than the pre-EPU heat load. EPU will result in higher decay heat in the discharged bundles to the spent fuel pool as well as an increase in the number of discharged fuel bundles at the end of each cycle. The heat removal capability of the spent fuel pool cooling system, the ADHR system, or the supplemental fuel pool cooling mode of the RHR system are not affected by EPU. The evaluations for spent fuel pool cooling, as discussed below, include the effects from EPU operation and provide the results E2-4


SPLB-A.1, SPLB-A.2 and SPLB-A.3 regarding fuel pool cooling. The  
indicating that the design basis for the spent fuel pool will be maintained.
3.1.1 Bounding Calculation Consistent with the BFN design basis, two cases were analyzed: 1. Partial core offload with operation of the spent fuel pool cooling system and ADHR system, and
: 2. Full core offload with operation of the spent fuel pool cooling system and RHR supplemental fuel pool cooling mode. In each case the initial fuel pool temperature was assumed to be 100°F.
: 1. Partial Core Offload The capacity of the fuel pool cooling system and the ADHR system to maintain the fuel pool temperature at or below 125°F during partial core offloads was evaluated for EPU conditions.
The maximum decay heat loadings for the spent fuel pool were calculated using the ANSI/ANS 5.1-1979 Standard with two-sigma uncertainty. The heat load in the spent fuel pool is the sum of previous fuel offloads and the recent batch decay heats at the time of transfer. In this analysis, the offload consists of a batch of 332 fuel bundles offloaded to an almost full spent fuel pool. This batch size was chosen for analytical purposes; the actual batch size may vary.
The spent fuel pool was assumed to be previously loaded with 2375 bundles allowing a reserve space for a full core offload (764 cells). The 2375 bundles were assumed to have been offloaded in eight batches, discharged at 24 month intervals. For this case, core offload begins 50 hours after reactor shutdown. Fuel transfer time was estimated based on a transfer rate of 14 bundles per hour to the fuel pool. These decay heat and offload time estimates establish the limiting case maximum heat loads.
Cooling of the fuel pool conservatively assumes that only one heat exchanger/pump combination is available for each system. The heat exchanger effectiveness is based upon original design specifications including standard value fouling factors and tube plugging criteria. The evaluation only considers the mass of water in the fuel pool and assumes no circulation of water between the fuel pool and the cavity for the period of time that fuel pool gates are open while the fuel is being transferred to the pool.
E2-5


responses to the subject RAIs are the same for all three BFN
The results of this evaluation show that the peak spent fuel pool temperature remains less than 125°F under EPU conditions.
Table 1 Partial Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and ADHR1 Conditions/Parameters                Value Peak spent fuel pool temperature (°F)                99.1 Time to peak spent fuel pool temperature (hours)      80 Time to boil from loss of all cooling at peak          14 temperature (hours)
Boil off rate (gpm)                                    48 1
Assumes core offload begins 50 hours after reactor shutdown to allow for cooldown, vessel head removal, refueling cavity filling, and other refueling preparations.
PUSAR Table 6-3 contains an additional case where a partial core offload was evaluated for one train each of the spent fuel pool cooling system and RHR supplemental fuel pool cooling mode. In that evaluation, the calculated peak spent fuel pool temperature of 124.9°F was less than 125°F.
E2-6


units.
Table 2 Partial Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and RHR Supplemental Fuel Pool Cooling Mode1 Conditions/Parameters                Value Peak spent fuel pool temperature (°F)                124.9 Time to peak spent fuel pool temperature (hours)      130 Time to boil from loss of all cooling at peak          13 temperature (hours)
NRC Request SPLB-A.1 Section 10.5.5 of the Updated Final Safety Analysis Report (UFSAR), Revision 17 dated August 30, 1999, revised the  
Boil off rate (gpm)                                    42 1
Assumes core offload begins 95 hours after reactor shutdown and includes 45 hours of invessel stay time because the RHR supplemental fuel pool cooling mode has less heat removal capacity than the ADHR.
E2-7
: 2. Full Core Offload The capacity of the spent fuel pool cooling system and the RHR supplemental fuel pool cooling mode to maintain the fuel pool temperature at or below 150°F during a full core off load is evaluated for EPU conditions.
The maximum decay heat loadings for the spent fuel pool were calculated using the ANSI/ANS 5.1-1979 Standard with two-sigma uncertainty. The heat load in the spent fuel pool is the sum of previous fuel offloads and the recent full core decay heats at the time of transfer. The pool is assumed to be previously loaded with 2707 bundles.
The prior offload batches were assumed to be the same as the partial core offload case above with an additional batch of 332 fuel assemblies having been discharged from the reactor core, all of which has been cooled for an additional 24 months. (The partial offload batch size was chosen for analytical purposes; the actual may vary.)
The initiation of fuel offloading was a minimum of 50 hours after plant shutdown based upon shutdown cooling requirements, head removal time and refueling preparation. Actual times were determined based on the calculated heat removal capacity of the cooling mode.
For this case, core offload begins 165 hours after reactor shutdown and includes 115 hours of invessel stay time because the RHR supplemental fuel pool cooling mode has less heat removal capacity than the ADHR system.
Fuel transfer time was estimated based on a transfer rate of 14 bundles per hour to the fuel pool. These decay heat and offload time estimates establish the limiting case maximum heat loads.
Cooling of the fuel pool conservatively assumes that only one heat exchanger/pump combination is available for each system. The heat exchanger effectiveness is based upon original design specifications including standard value fouling factors and tube plugging criteria. The evaluation only considers the mass of water in the fuel pool and assumes no circulation of water between the fuel pool and the cavity for the period of time that fuel pool gates are open while the fuel is being transferred to the pool.
The results of this evaluation show that the peak spent fuel pool temperature remains less than 150°F under EPU conditions.
E2-8


discussion from the UFSAR that was previously provided regarding
Table 3 Full Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and RHR Supplemental Fuel Pool Cooling Mode1 Conditions/Parameters                 Value Peak spent fuel pool temperature (°F)                 149.8 Time to peak spent fuel pool temperature (hours)       229 Time to boil from loss of all cooling at peak             4 temperature (hours)
 
Boil off rate (gpm)                                     80 1
the maximum SFP heat load for batch and full core offloads. In
Assumes core offload begins 165 hours after reactor shutdown and includes 115 hours of invessel stay time because the RHR supplemental fuel pool cooling mode has less heat removal capacity than the ADHR.
 
PUSAR Table 6-3 contains an additional case where a full core offload was evaluated for one train each of the spent fuel pool cooling system and ADHR system. In that evaluation, the calculated peak spent fuel pool temperature of 121.5°F was also less than 150°F.
order to facilitate NRC review of the capability of the SFPCCS to
Table 4 Full Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and ADHR1 Conditions/Parameters                 Value Peak spent fuel pool temperature (°F)                 121.5 Time to peak spent fuel pool temperature (hours)       109 Time to boil from loss of all cooling at peak             5 temperature (hours)
 
Boil off rate (gpm)                                     104 1
perform its function for EPU conditions, provide a discussion on
Assumes core offload begins 50 hours after reactor shutdown to allow for cooldown, vessel head removal, refueling cavity filling, and other refueling preparations.
 
E2-9
the safety-related systems required to maintain fuel pool cooling
 
within design bases temperature limits.
NRC Request SPLB-A.2 For EPU conditions, explain how the SFP water temperature will be maintained below 150 degrees Fahrenheit (F) for the worst-case
 
normal (batch) and full core offload scenarios assuming a loss of
 
offsite power and (for the batch offload only) a concurrent
 
single active failure considering all possible initial
 
configurations that can exist. Include a description of the
 
maximum decay heat load that will exist in the SFP for each case, how these heat loads were determined, such that they represent
 
the worst-case conditions, and what the cooling capacity is for
 
the systems that are credited, including how this determination
 
was made. Also:
: a. Describe any operator actions that are required, how long it will take to complete these actions, and how this
 
determination was made; and
: b. Describe the maximum core decay heat load that will exist at the onset of fuel movement, how this determination was made, how this heat load will be accommodated while also satisfying E2-2 the SFP cooling requirements over the duration of the respective fuel offload scenarios, and including the situation
 
where the SFP is isolated from the reactor vessel cavity.
NRC Request SPLB-A.3 Discuss how adequate SFP makeup capability is assured for EPU conditions in the unlikely event of a complete loss of SFP
 
cooling capability, including how the maximum possible SFP 
 
boil-off rate compares with the assured makeup capability that
 
exists, operator actions that must be taken, how long it will
 
take to complete these actions and how this determination was
 
made, and boron dilution considerations.
TVA's Supplemental Reply to SPLB-A.1, 2, and 3 TVA has previously provided information regarding the spent fuel pool cooling system at BFN and the effects of EPU in PUSAR
 
Section 6.3 and in the December 19, 2005, reply to questions
 
SPLB-A.1, SPLB-A.2, and SPLB-A.3. The following discussion is
 
provided to clarify and provide supplemental information on the
 
BFN spent fuel pool cooling system and is presented in the format (including numbering) of Attachment 2 to Matrix 5 of RS-001, "Review Standard for Extended Power Uprates," Revision 0, December 2003.
: 1. BACKGROUND The BFN fuel pool cooling and cleanup systemsfor Units 1, 2, and 3 are described in UFSAR Section 10.5. The systems cool
 
the fuel storage pools by transferring the spent fuel decay
 
heat through heat exchangers to the reactor building closed
 
cooling water (RBCCW) systems
. The system for each fuel pool consists of two circulating pumps connected in parallel, two
 
heat exchangers, one filter demineralizer subsystem, two
 
skimmer surge tanks, and the required piping, valves, and
 
instrumentation. Four filter demineralizers are provided
 
including one spare filter demineralizer shared between the
 
three units. The pumps circulate the pool water in a closed
 
loop, taking suction from the surge tanks, circulating the
 
water through the heat exchangers and filter demineralizer, and discharging it through diffusers at the bottom of the
 
fuel pool and reactor well (as required during refueling
 
operations). The water flows from the pool surface through
 
skimmer weirs and scuppers (wave suppressers) to the surge
 
tanks.
 
The heat exchangers in the residual heat removal (RHR) system
 
can be used in conjunction with the fuel pool cooling and
 
cleanup system to supplement pool cooling (supplemental fuel
 
pool cooling). Normal makeup water for the f uel pool cooling E2-3 system is transferred from the condensate storage tank to the skimmer surge tanks. A seismic Class I qualified source of
 
makeup water is provided through the crosstie between the RHR
 
system and fuel pool cooling system. If necessary, the
 
intertie between the RHR service water (RHRSW) system and the
 
RHR system can be utilized to admit raw water as makeup. 
 
Also, a standpipe and hose connection is provided on each of
 
the two emergency equipment cooling water (EECW) system
 
headers which provide two additional fuel pool water makeup
 
sources.
 
Additionally, the auxiliary decay heat removal (ADHR) system
 
provides another means to remove decay heat a n d residual heat from the spent fuel pool and reactor cavity of BFN Units 2
 
and 3 and is described in UFSAR Section 10.22. As part of
 
restart activities for BFN Unit 1, the ADHR system will be
 
extended to include the spent fuel pool and reactor cavity of
 
BFN Unit 1. During operation of this system, it is aligned
 
to only one unit at a time. The ADHR system consists of two
 
cooling water loops. The primary cooling loop circulates
 
spent fuel pool water entirely inside the Reactor Building
 
and rejects heat to a secondary loop by means of a heat
 
exchanger. The secondary loop transfers heat to the
 
atmosphere outside the Reactor Building by means of
 
evaporative cooling towers.
 
Spent fuel pool cooling, including supplemental fuel pool
 
cooling and ADHR, are non-safety systems. To ensure adequate
 
makeup under all normal and off normal conditions, the
 
RHR/RHRSW connection provides a permanently installed seismic
 
Class I qualified makeup water source for the spent fuel
 
pool. This ensures that irradiated fuel is maintained
 
submerged in water and that reestablishment of normal fuel
 
pool water level is possible under all anticipated
 
conditions. Two additional sources of spent fuel pool water
 
makeup are provided via a standpipe and hose connection on
 
each of the two EECW headers. Each hose is capable of
 
supplying makeup water in sufficient quantity to maintain
 
fuel pool water level under conditions of no fuel pool
 
cooling. 2. ACCEPTANCE CRITERIA The current design and operational basis for BFN spent fuel pool cooling system is as follows:  Administrative controls are used to ensure that the fuel pool heat load does not exceed available cooling capacity. The capacity of the spent fuel pool cooling and the ADHR systems, considering seasonal cooling water temperatures
 
and current heat exchanger conditions, are utilized to E2-4 maintain the fuel pool temperature at or below 125 F during normal refueling outages (average spent fuel batch
 
discharged from the equilibrium fuel cycle). The RHR system can be operated in parallel with the spent fuel pool cooling system to maintain the fuel pool
 
temperature less than the Technical Requirements Manual (TRM) limit of 150F if a full core off load is performed.
Plant instructions require that actions be taken well
 
before exceeding this li m it. The fuel pool temperature is normally maintained between 72 F and 125 F. To ensure adequate makeup under all normal and off normal conditions (i.e. fuel pool water boil off), the RHR/RHRSW
 
crosstie provides a permanently installed seismic Class I
 
qualified makeup water source for the spent fuel pool. Two additional sources of spent fuel pool water makeup are provided via a standpipe and hose connection on each of
 
the two EECW headers. Each hose is capable of supplying
 
makeup water in sufficient quantity to maintain fuel pool
 
water level under conditions of no fuel pool cooling.
 
The design basis for the fuel pool cooling systems remains
 
the same for the current and EPU conditions.
: 3. REVIEW PROCEDURES 3.1 Adequate SFP Cooling Capacity To demonstrate adequate SFP cooling capacity, BFN performs both bounding and cycle-specific calculations. The bounding
 
calculations have been reperformed for EPU conditions as
 
described below in Section 3.1.1 to ensure that the
 
acceptance criteria will continue to be met. Additionally, as described in Section 3.1.2, cycle-specific calculations
 
are performed to assess cooling system capability to ensure
 
that fuel pool heat load does not exceed available cooling
 
capacity. These calculations demonstrate that the
 
acceptance criteria described in Section 2 will continue to
 
be met under EPU conditions.
 
As a result of EPU, the normal spent fuel pool heat load
 
will be higher than the pre-EPU heat load. EPU will result
 
in higher decay heat in the discharged bundles to the spent
 
fuel pool as well as an increase in the number of discharged
 
fuel bundles at the end of each cycle. The heat removal
 
capability of the spent fuel pool cooling system, the ADHR
 
system, or the supplemental fuel pool cooling mode of the
 
RHR system are not affected by EPU. The evaluations for
 
spent fuel pool cooling, as discussed below, include the
 
effects from EPU operation and provide the results E2-5 indicating that the design basis for the spent fuel pool will be maintained.
3.1.1 Bounding Calculation Consistent with the BFN design basis, two cases were analyzed:  1. Partial core offload with operation of the
 
spent fuel pool cooling system and ADHR system, and
: 2. Full core offload with operation of the spent fuel pool
 
cooling system and RHR supplemental fuel pool cooling
 
mode. In each case the initial fuel pool temperature was
 
assumed to be 100°F.
: 1. Partial Core Offload The capacity of the fuel pool cooling system and the ADHR system to maintain the fuel pool temperature at or
 
below 125°F during partial core offloads was evaluated
 
for EPU conditions.
 
The maximum decay heat loadings for the spent fuel pool
 
were calculated using the ANSI/ANS 5.1-1979 Standard
 
with two-sigma uncertainty. The heat load in the spent
 
fuel pool is the sum of previous fuel offloads and the
 
recent batch decay heats at the time of transfer. In
 
this analysis, the offload consists of a batch of 332
 
fuel bundles offloaded to an almost full spent fuel
 
pool. This batch size was chosen for analytical
 
purposes; the actual batch size may vary.
 
The spent fuel pool was assumed to be previously loaded
 
with 2375 bundles allowing a reserve space for a full
 
core offload (764 cells). The 2375 bundles were
 
assumed to have been offloaded in eight batches, discharged at 24 month intervals. For this case, core
 
offload begins 50 hours after reactor shutdown. Fuel
 
transfer time was estimated based on a transfer rate of
 
14 bundles per hour to the fuel pool. These decay heat
 
and offload time estimates establish the limiting case
 
maximum heat loads.
 
Cooling of the fuel pool conservatively assumes that
 
only one heat exchanger/pump combination is available
 
for each system. The heat exchanger effectiveness is
 
based upon original design specifications including
 
standard value fouling factors and tube plugging
 
criteria. The evaluation only considers the mass of
 
water in the fuel pool and assumes no circulation of
 
water between the fuel pool and the cavity for the
 
period of time that fuel pool gates are open while the
 
fuel is being transferred to the pool.
E2-6  The results of this evaluation show that the peak spent
 
fuel pool temperature remains less than 125°F under EPU
 
conditions.
Table 1 Partial Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and ADHR 1 Conditions/Parameters Value Peak spent fuel pool temperature (°F) 99.1 Time to peak spent fuel pool temperature (hours) 80 Time to boil from loss of all cooling at peak temperature (hours) 14 Boil off rate (gpm) 48 1 Assumes core offload begins 50 hours after reactor shutdown to allow for cooldown, vessel head removal, refueling cavity filling, and other refueling
 
preparations.
PUSAR Table 6-3 contains an additional case where a partial core offload was evaluated for one train each
 
of the spent fuel pool cooling system and RHR
 
supplemental fuel pool cooling mode. In that
 
evaluation, the calculated peak spent fuel pool
 
temperature of 124.9°F was less than 125°F.
 
E2-7  Table 2 Partial Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and RHR Supplemental Fuel Pool Cooling Mode 1 Conditions/Parameters Value Peak spent fuel pool temperature (°F) 124.9 Time to peak spent fuel pool temperature (hours) 130 Time to boil from loss of all cooling at peak temperature (hours) 13 Boil off rate (gpm) 42 1 Assumes core offload begins 95 hours after reactor shutdown and includes 45 hours of invessel stay time because the RHR supplemental fuel pool cooling mode has
 
less heat removal capacity than the ADHR.
 
E2-8  2. Full Core Offload The capacity of the spent fuel pool cooling system and the RHR supplemental fuel pool cooling mode to maintain the fuel pool temperature at or below 150 F during a full core off load is evaluated for EPU conditions.
 
The maximum decay heat loadings for the spent fuel pool
 
were calculated using the ANSI/ANS 5.1-1979 Standard with
 
two-sigma uncertainty. The heat load in the spent fuel
 
pool is the sum of previous fuel offloads and the recent
 
full core decay heats at the time of transfer. The pool
 
is assumed to be previously loaded with 2707 bundles. 
 
The prior offload batches were assumed to be the same as
 
the partial core offload case above with an additional
 
batch of 332 fuel assemblies having been discharged from
 
the reactor core, all of which has been cooled for an
 
additional 24 months.  (The partial offload batch size was chosen for analytical purposes; the actual may vary.)
 
The initiation of fuel offloading was a minimum of 50
 
hours after plant shutdown based upon shutdown cooling
 
requirements, head removal time and refueling
 
preparation. Actual times were determined based on the
 
calculated heat removal capacity of the cooling mode. 
 
For this case, core offload begins 165 hours after
 
reactor shutdown and includes 115 hours of invessel stay
 
time because the RHR supplemental fuel pool cooling mode
 
has less heat removal capacity than the ADHR system. 
 
Fuel transfer time was estimated based on a transfer rate
 
of 14 bundles per hour to the fuel pool. These decay
 
heat and offload time estimates establish the limiting
 
case maximum heat loads.
 
Cooling of the fuel pool conservatively assumes that only
 
one heat exchanger/pump combination is available for each
 
system. The heat exchanger effectiveness is based upon
 
original design specifications including standard value
 
fouling factors and tube plugging criteria. The
 
evaluation only considers the mass of water in the fuel
 
pool and assumes no circulation of water between the fuel
 
pool and the cavity for the period of time that fuel pool
 
gates are open while the fuel is being transferred to the
 
pool.
 
The results of this evaluation show that the peak spent
 
fuel pool temperature remains less than 150°F under EPU
 
conditions.
 
E2-9 Table 3 Full Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and RHR Supplemental Fuel Pool Cooling Mode 1 Conditions/Parameters ValuePeak spent fuel pool temperature (°F) 149.8Time to peak spent fuel pool temperature (hours) 229 Time to boil from loss of all cooling at peak temperature (hours) 4 Boil off rate (gpm) 80 1 Assumes core offload begins 165 hours after reactor shutdown and includes 115 hours of invessel stay time because the RHR supplemental fuel pool cooling mode has  
 
less heat removal capacity than the ADHR.
PUSAR Table 6-3 contains an additional case where a full core offload was evaluated for one train each of  
 
the spent fuel pool cooling system and ADHR system. In  
 
that evaluation, the calculated peak spent fuel pool  
 
temperature of 121.5°F was also less than 150°F.
Table 4 Full Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and ADHR 1 Conditions/Parameters ValuePeak spent fuel pool temperature (°F) 121.5Time to peak spent fuel pool temperature (hours) 109 Time to boil from loss of all cooling at peak temperature (hours) 5 Boil off rate (gpm) 104 1 Assumes core offload begins 50 hours after reactor shutdown to allow for cooldown, vessel head removal, refueling cavity filling, and other refueling  
 
preparations.  
 
E2-10  3.1.2 Cycle-Specific Calculation Unloading the reactor core and the associated increase in fuel pool heat load is a controlled evolution. 
 
Administrative controls are used to ensure that the fuel
 
pool heat load does not exceed available cooling capacity, such that the fuel pool gates are not closed until the
 
decay heat load is less than or equal to the fuel pool
 
cooling heat exchanger capacity. Performance of the fuel
 
pool cooling systems is predicted prior to each refueling
 
outage as part of the Outage Risk Assessment Review (ORAM)
 
process.
 
In addition to the following discussion, BFN is taking
 
additional actions to further augment procedures
 
pertaining to the cycle specific administrative controls. 
 
Procedure changes will be generated (1) to define and
 
control the generation of cycle-specific fuel pool heat
 
load calculations, and (2) to control the installation of
 
the fuel pool gates based on the calculated fuel pool heat
 
load.


3.1.2 Cycle-Specific Calculation Unloading the reactor core and the associated increase in fuel pool heat load is a controlled evolution.
Administrative controls are used to ensure that the fuel pool heat load does not exceed available cooling capacity, such that the fuel pool gates are not closed until the decay heat load is less than or equal to the fuel pool cooling heat exchanger capacity. Performance of the fuel pool cooling systems is predicted prior to each refueling outage as part of the Outage Risk Assessment Review (ORAM) process.
In addition to the following discussion, BFN is taking additional actions to further augment procedures pertaining to the cycle specific administrative controls.
Procedure changes will be generated (1) to define and control the generation of cycle-specific fuel pool heat load calculations, and (2) to control the installation of the fuel pool gates based on the calculated fuel pool heat load.
Cycle-specific analysis conditions:
Cycle-specific analysis conditions:
(1) Predicted decay heat for both the spent fuel pool and reactor core are determined by utilizing a TVA code (DHEAT) that complies with the methods of ANSI/ANS  
(1) Predicted decay heat for both the spent fuel pool and reactor core are determined by utilizing a TVA code (DHEAT) that complies with the methods of ANSI/ANS 5.1. The history of previous fuel discharges is used as input into the decay heat load determination for the spent fuel pool. The decay heat results are best-estimate values and are provided for a range of decay times that may be needed for the spent fuel pool evaluations.
 
(2) Cooling system heat removal is calculated utilizing a spreadsheet based on heat balances of the affected systems. Fuel pool cooling capacity of the systems is based upon inlet cooling temperatures, system flow rates, trains in service, and heat exchanger performance values.
5.1. The history of previous fuel discharges is used  
(3) As described in (2) above, heat removal capabilities are determined for each of the BFN cooling trains, including the normal spent fuel pool cooling system, the ADHR system, and the supplemental fuel pool cooling mode of RHR.
 
(4) The limiting parameter for heat load and heat removal capability is the insertion of the fuel pool gates following core offload. When the fuel pool gates are removed and spent fuel movement begins, additional E2-10
as input into the decay heat load determination for  
 
the spent fuel pool. The decay heat results are best-
 
estimate values and are provided for a range of decay  
 
times that may be needed for the spent fuel pool  
 
evaluations.  
 
(2) Cooling system heat removal is calculated utilizing a spreadsheet based on heat balances of the affected  
 
systems. Fuel pool cooling capacity of the systems is  
 
based upon inlet cooling temperatures, system flow  
 
rates, trains in service, and heat exchanger  
 
performance values.
(3) As described in (2) above, heat removal capabilities are determined for each of the BFN cooling trains, including the normal spent fuel pool cooling system, the ADHR system, and the supplemental fuel pool  
 
cooling mode of RHR.  
 
(4) The limiting parameter for heat load and heat removal capability is the insertion of the fuel pool gates  
 
following core offload. When the fuel pool gates are  
 
removed and spent fuel movement begins, additional E2-11 cooling is provided by the shutdown cooling system that provides decay heat removal directly to the
 
reactor vessel. Evaluations of the spent fuel pool
 
temperature following discharge of the partial core
 
offload are performed based on cooling system
 
configurations to ensure that the spent fuel pool
 
temperature can be maintained without the additional
 
heat removal capacity of the shutdown cooling system.
 
(5) (As discussed with the NRC staff on April 13, 2006, TVA will address this item in a supplemental reply.)
 
(6) Administrative controls are provided as part of ORAM to ensure that appropriate controls are provided for
 
shutdown safety. These controls ensure proper
 
assessment of key shutdown areas (i.e., reactivity
 
control, shutdown cooling, AC power, fuel pool
 
cooling, etc.). Spent fuel pool cooling assessments
 
are performed prior to the outage and updated during
 
the outage to ensure appropriate controls are
 
maintained for the safe operation of spent fuel pool
 
cooling. 3.2 Adequate Make-Up Supply The evaluations described in Sections 3.1.1.1 and 3.1.1.2 above are used to determine the time to boil for make-up
 
capability. These evaluations assume only one train of each
 
cooling system is in operation to determine the peak spent
 
fuel pool temperature. At the time of peak spent fuel pool
 
temperature, it is assumed that all spent fuel pool cooling
 
is lost. Based on decay heat, the time to reach boiling
 
conditions is then calculated. The results are provided in
 
Tables 1 through 4 above.
 
The minimum time to reach boiling is four hours based on the


case presented in Table 3. This case involves a full core  
cooling is provided by the shutdown cooling system that provides decay heat removal directly to the reactor vessel. Evaluations of the spent fuel pool temperature following discharge of the partial core offload are performed based on cooling system configurations to ensure that the spent fuel pool temperature can be maintained without the additional heat removal capacity of the shutdown cooling system.
(5) (As discussed with the NRC staff on April 13, 2006, TVA will address this item in a supplemental reply.)
(6) Administrative controls are provided as part of ORAM to ensure that appropriate controls are provided for shutdown safety. These controls ensure proper assessment of key shutdown areas (i.e., reactivity control, shutdown cooling, AC power, fuel pool cooling, etc.). Spent fuel pool cooling assessments are performed prior to the outage and updated during the outage to ensure appropriate controls are maintained for the safe operation of spent fuel pool cooling.
3.2 Adequate Make-Up Supply The evaluations described in Sections 3.1.1.1 and 3.1.1.2 above are used to determine the time to boil for make-up capability. These evaluations assume only one train of each cooling system is in operation to determine the peak spent fuel pool temperature. At the time of peak spent fuel pool temperature, it is assumed that all spent fuel pool cooling is lost. Based on decay heat, the time to reach boiling conditions is then calculated. The results are provided in Tables 1 through 4 above.
The minimum time to reach boiling is four hours based on the case presented in Table 3. This case involves a full core offload and assumed loss of all cooling at the peak spent fuel pool temperature of 149.8°F. The associated boil off rate is 80 gpm.
The maximum boil off rate is 104 gpm based on the case presented in Table 4. This case involves a full core offload and assumed loss of all cooling at the peak spent fuel pool temperature of 121.5°F. The associated time to reach boiling is five hours.
For BFN the RHR/RHRSW crosstie provides a permanently installed seismic Class I qualified makeup water source for the spent fuel pool. This supply can be aligned within the E2-11


offload and assumed loss of all cooling at the peak spent  
minimum four hours calculated above and can supply greater than 150 gpm to the spent fuel pool.
Two additional sources of spent fuel pool water makeup are provided via a standpipe and hose connection on each of the two EECW headers. Each hose is capable of supplying makeup water at 150 gpm to the spent fuel pool within the minimum four hours calculated above.
E2-12


fuel pool temperature of 149.8°F. The associated boil off
ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
 
rate is 80 gpm.
 
The maximum boil off rate is 104 gpm based on the case
 
presented in Table 4. This case involves a full core
 
offload and assumed loss of all cooling at the peak spent
 
fuel pool temperature of 121.5°F. The associated time to
 
reach boiling is five hours.
For BFN the RHR/RHRSW crosstie provides a permanently installed seismic Class I qualified makeup water source for
 
the spent fuel pool. This supply can be aligned within the E2-12 minimum four hours calculated above and can supply greater than 150 gpm to the spent fuel pool.
 
Two additional sources of spent fuel pool water makeup are
 
provided via a standpipe and hose connection on each of the
 
two EECW headers. Each hose is capable of supplying makeup
 
water at 150 gpm to the spent fuel pool within the minimum
 
four hours calculated above.
E3-1 ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -
UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -
COMMITMENT LISTING Prior to implementing EPU, procedure changes will be generated  
COMMITMENT LISTING Prior to implementing EPU, procedure changes will be generated (1) to define and control the generation of cycle-specific fuel pool heat load calculations, and (2) to control the installation of the fuel pool gates based on the calculated fuel pool heat load.
 
E3-1}}
(1) to define and control the generation of cycle-specific fuel  
 
pool heat load calculations, and (2) to control the installation  
 
of the fuel pool gates based on the calculated fuel pool heat  
 
load.}}

Latest revision as of 19:51, 23 November 2019

Technical Specifications (TS) Change Nos. TS-418 and TS-431- Extended Power Uprate (EPU) Operation - Revised Responses to NRC Round 2 Requests for Additional Information
ML061040217
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/13/2006
From: Crouch W
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
TAC MC3743, TAC MC3744, TAC MC3812, TVA-BFN-TS-418, TVA-BFN-TS-431
Download: ML061040217 (22)


Text

April 13, 2006 TVA-BFN-TS-418 TVA-BFN-TS-431 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop OWFN, P1-35 Washington, D. C. 20555-0001 Gentlemen:

In the Matter of ) Docket Nos. 50-259 Tennessee Valley Authority ) 50-260

) 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) - UNITS 1, 2, AND 3 -

TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -

EXTENDED POWER UPRATE (EPU) OPERATION - REVISED RESPONSES TO NRC ROUND 2 REQUESTS FOR ADDITIONAL INFORMATION - (TAC NOS.

MC3812, MC3743, AND MC3744)

By letters dated December 19, 2005 (ADAMS Accession Nos.

ML053560194 and ML053560186) TVA submitted responses to NRC Round 2 requests for additional information (RAIs) regarding TVAs applications for extended power uprate of BFN Unit 1 and BFN Units 2 and 3, respectively. As a result of discussions with the NRC staff, TVA is revising its responses to five of the RAIs. The responses to the subject RAIs are the same for all three BFN units. to this letter provides revised responses to RAIs IPSB-B.1 and IPSB-B.8 regarding external radiation doses due to direct radiation and skyshine. Enclosure 2 to this letter provides revised responses to RAIs SPLB-A.1, SPLB-A.2 and SPLB-A.3 regarding fuel pool cooling. Each revised RAI response in Enclosure 1 supersedes the response previously provided to the NRC staff. However, the responses in supplement the previous responses to the respective RAIs.

U.S. Nuclear Regulatory Commission Page 2 April 13, 2006 Item 3.1.2(5) of the Supplemental Reply to RAIs SPLB-A.1, 2, and 3 in Enclosure 2 is not complete. As discussed with the NRC staff on April 13, 2006, TVA will address this item in a supplemental reply. identifies a regulatory commitment made in to modify the administrative controls regarding spent fuel pool cooling operations.

If you have any questions regarding this letter, please contact me at (256)729-2636.

I declare under penalty of perjury that the foregoing is true and correct. Executed on this 13th day of April, 2006.

Sincerely, Original signed by:

William D. Crouch Manager of Licensing and Industry Affairs

Enclosures:

1. Revised Responses to RAIs IPSB-B.1 and IPSB-B.8
2. Supplements to Responses to RAIs SPLB-A.1, SPLB-A.2 and SPLB-A.3
3. Commitment Listing cc (See page 3.)

U.S. Nuclear Regulatory Commission Page 3 April 13, 2006

Enclosures:

cc (Enclosures):

State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-3415 Malcolm T. Widmann, Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 NRC Unit 1 Restart Senior Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970 Margaret Chernoff, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739

U.S. Nuclear Regulatory Commission Page 4 April 13, 2006 JEM:LTG:BAB Enclosures cc (Enclosures):

B. M. Aukland, POB 2C-BFN M. Bajestani, NAB 1A-BFN A. S. Bhatnagar, LP 6A-C J. C. Fornicola, LP 6A-C R. G. Jones, POB 2C-BFN G. V. Little, NAB 1A-C R. F. Marks, Jr., PAB 1C-BFN G. W. Morris, LP 4G-C B. J. OGrady, PAB 1E-BFN K. W. Singer, LP 6A-C E. J. Vigluicci, ET 11A-K NSRB Support, LP 5M-C EDMS WT CA-K, w.

s:lic/submit/TechSpec/TS 418 and 431 - Revised RAIs.doc

ENCLOSURE 1 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -

REVISED RESPONSES TO NRC ROUND 2 REQUESTS FOR ADDITIONAL INFORMATION - IPSB-B.1 and IPSB-B.8 By letters dated December 19, 2005 (ADAMS Accession Nos.

ML053560194 and ML053560186) TVA submitted responses to NRC Round 2 requests for additional information (RAIs) regarding TVAs applications for extended power uprate of BFN Unit 1 and BFN Units 2 and 3, respectively. As a result of discussions with the NRC staff, TVA is superseding its prior responses to RAIs IPSB-B.1 and IPSB-B.8 regarding external radiation doses due to direct radiation and skyshine. The responses to the subject RAIs are the same for all three BFN units.

NRC Request IPSB-B.1 Section 8.6, Normal Operations Off-Site Doses, of Enclosure 4 of the [June 25, 2004 and June 28, 2004 submittals for BFN Units 2 and 3 and BFN Unit 1, respectively] states that radiation from shine (offsite) is not presently a significant exposure pathway and is not significantly affected by EPU. This conclusion is based on the experience of earlier 5-percent power uprates for Units 2 and 3. Also, Section 8.2.2, Offsite Doses at Power Uprate Conditions, of the Environmental Report states that N-16 activity in the Turbine Building will increase linearly with EPU.

The magnitude of the N-16 source term in the Turbine Buildings is not a simple linear increase with reactor power. The equilibrium concentration of N-16 in the Turbine Building systems will be effected (an inverse exponential function) by the decreased decay resulting from the increased steam/feed flow between the reactor and the Turbine Building. Implementation of hydrogen injection water chemistry also increases N-16 concentrations in reactor steam independently of reactor power.

Provide the present nominal value for the skyshine external dose component (assuming all three units operating at current licensed power levels), the corresponding estimated dose component following EPU (assuming all three units operating at the requested power, and design basis steam activity, levels).

Include all parameters (i.e., flow rates, system component dimensions, etc.) used in calculating these values and specify the calculational method used. Identify the limiting dose receptor (i.e., is the dose receptor a member of the public E1-1

located offsite and, therefore, subject to the dose limits of 40 CFR Part 190) or a member of the public working onsite (subject to the dose limits of 20.1301)). Describe any increases in doses for onsite spaces (i.e., Administrative offices, guard stations, etc.) continuously or routinely occupied by plant visitors or staff.

TVA Reply to IPSB-B.1 A number of studies have been conducted at BFN to characterize the direct radiation and building/atmospheric scatter skyshine radiation fields associated with increased N-16 and C-15 production from hydrogen injection into the feedwater system for mitigation of intergrannular stress corrosion cracking (IGSCC) of vessel internals. Radiation levels onsite have been measured with thermoluminescent dosimeters (TLD), pressurized ionization chambers (PIC), and hyper-pure germanium detectors.

In 1997, while Units 2 and 3 were operating at original licensed thermal power (OLTP) (i.e., 3293 MWt), and prior to the injection of hydrogen in the feedwater system on either unit, GE Nuclear Energy performed extensive surveys of site radiation levels. A subsequent report, GE-NE-P7300044-01-01-00, Browns Ferry Nuclear Power Station, Potential Dose Consequences Resulting From Implementation of Hydrogen Water Chemistry, provides dose rate projections through a number of shield wall thicknesses as a function of distance from BFN units under OLTP and normal water chemistry conditions. The projections were based on the output from the mathematical model provided in BWR Turbine Equipment N-16 Radiation Shielding Studies, by D. R. Rogers, General Electric NEDO-20206, 1973, normalized to a PIC radiation measurement in line with the operating turbines at the north end of the electrical switchyard. This location was chosen because it is unaffected by other sources of radiation such as from radwaste processing/shipment or the condensate storage tanks.

The report provided projections in-line with the turbines and normal to them. As the former were slightly more conservative (i.e., provided higher values), they were used for dose rate projections in occupied areas onsite. The dose rate projection curves in the report extend to 2000 feet from the turbine center line. The projection curves were then extrapolated in order to project site boundary doses. The dose rate at the nearest site boundary (i.e., 3850 feet) was projected to be 0.04 µR/h per unit under OLTP and normal water chemistry conditions. This equates to a total annual dose of approximately 1.1 mrem from all three units at OLTP.

Components on the turbine deck which contribute to the skyshine include: the piping to and from the high pressure turbine, the high pressure turbine, the crossover piping from the moisture separators to the low pressure turbines, the combined intercept E1-2

valves and the low pressure turbines. According to the GE report (GE-NE-P7300044-01-01-00), the vast majority (~72%) of the skyshine emanates from N-16 and C-15 in the steam traversing the crossover piping. Based on this, the change in travel time of the steam to the midpoint of the crossover piping was calculated for OLTP, current licensed thermal power (CLTP) (i.e., 3458 MWt) and EPU (i.e., 3952 MWt) conditions. Steam travel times were calculated based on the steam flow rates for each of the power levels, piping layouts, and component configurations. The calculated travel times are shown in the following table:

Table IPSB-B.1-1 STEAM TRAVEL TIME Steam travel time to crossover piping mid-point (seconds)

OLTP CLTP EPU (3,293 MWt) (3,458 MWt) (3,952 MWt)

Unit 1 10.70 NA 8.93 Unit 2 10.49 10.12 8.63 Unit 3 10.47 10.10 8.62 The radiological decay of N-16 and C-15 was then calculated for those travel times, and a fractional increase in the radiation level was determined for each condition. The results for operation of all three BFN units were: an approximate 10%

increase from OLTP to CLTP and an approximate 32% increase from CLTP to EPU.

By applying these increases to the GE dose projection for the OLTP condition, the annual dose to members of the public offsite and onsite were determined for CLTP and EPU under normal water chemistry conditions (i.e., no hydrogen injection). For calculation purposes, assuming three units at CLTP and EPU, the annual dose to a member of the public at the nearest terrestrial site boundary would be 1.2 and 1.5 mrem, respectively. Currently both Unit 2 and Unit 3 are operating with the addition of Noble Chem' (platinum and rhodium) to the reactor coolant system and with reduced hydrogen injection in the feedwater for IGSCC mitigation. For three units at CLTP under reduced hydrogen injection, these values would be increased by approximately 25%

to 1.4 and 1.9 mrem, respectively. The total dose to a member of the public includes effluent doses; however, these are negligible in comparison to the direct and skyshine radiation doses.

E1-3

Therefore, the projected annual doses are well within the 25 mrem dose limit of 40 CFR 190 for an offsite member of the public.

The limiting dose receptors for members of the public would be those onsite (e.g., food vendors) because their work locations are nearer to the turbine building. The maximum annual dose to vendors would not likely exceed 18 mrem under EPU and Noble Chem' water chemistry and reduced hydrogen injection conditions on all three units. Consequently, the 10 CFR 20.1301 annual dose limit of 100 mrem for a member of the public onsite would not be exceeded. Therefore, the projected annual dose to an onsite member of the public will be well within the dose limit.

Furthermore, following Unit 1 restart, with the reduction in restart workers and the re-location of a major portion of the site population into permanent structures farther from the turbine building, the increase in collective site dose from direct and skyshine radiation external to the plant structure is projected to be approximately 10 person-rem per year for three units at EPU conditions under Noble Chem' water chemistry and reduced hydrogen injection.

NRC Request IPSB-B.8 Section 8.5.1, Normal Operations, of Enclosure 4 of the [June 25, 2004 and June 28, 2004 submittals for BFN Units 2 and 3 and BFN Unit 1, respectively] submittal states that, due to the conservative shielding design, the increase in radiation levels resulting from EPU will not affect the radiation zones for the various areas of the plant. This appears to be based on an assumed linear increase in radiation source term with power level. However, the increase in N-16 activity in the turbine building is an inverse exponential function with decay time, not a linear function of reactor power. Verify that the radiation zoning in all areas containing the steam and feed systems will be unaffected by EPU.

TVA Reply to IPSB-B.8 Under current licensed thermal power (CLTP) (i.e., 3458 MWt) conditions for BFN Units 2 and 3 with Noble Chem' water chemistry and reduced hydrogen injection in the feedwater for IGSCC mitigation, all of the steam-affected areas, with the exception of the reactor feed pump turbine rooms, are locked high radiation areas (LHRA). This includes the reactor and turbine steam tunnels, moisture separator rooms, turbine rooms, high and low pressure heater rooms, condenser rooms, moisture separator drain pump and tank rooms, steam packing exhauster rooms, steam jet air ejector rooms, and hydrogen recombiner rooms. The reactor feed pump turbine rooms are posted as radiation areas at the entrances with smaller high radiation areas located inside the rooms E1-4

enclosing the turbine and pump areas. The areas on the turbine roof over the turbine rooms are controlled as high radiation areas. Although BFN Unit 1 is currently not operating, nor is it currently licensed to operate above 3293 MWt, it is expected that its radiation levels will be consistent with the radiation levels of Units 2 and 3.

Under EPU conditions, the radiation levels are conservatively expected to increase by approximately 32% over the CLTP conditions. This is based on increased steam flow, reduction in steam travel time, and reduction in the radiological decay of N-16 and C-15. However this increase will not be enough to require changing the radiation area posting at the entrance to the rooms. In addition, the radiation zoning and posting outside the steam-affected area rooms are not expected to change due to EPU.

To ensure that proper postings are maintained, dose rates will be monitored in these environs during power ascension as part of the planned EPU testing.

E1-5

ENCLOSURE 2 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -

SUPPLEMENTS TO RESPONSES TO NRC ROUND 2 REQUESTS FOR ADDITIONAL INFORMATION - SPLB-A.1, SPLB-A.2 and SPLB-A.3 By letters dated December 19, 2005 (ADAMS Accession Nos.

ML053560194 and ML053560186) TVA submitted responses to NRC Round 2 requests for additional information (RAIs) regarding TVAs applications for extended power uprate of BFN Unit 1 and BFN Units 2 and 3, respectively. As a result of discussions with the NRC staff, TVA is supplementing its prior responses to RAIs SPLB-A.1, SPLB-A.2 and SPLB-A.3 regarding fuel pool cooling. The responses to the subject RAIs are the same for all three BFN units.

NRC Request SPLB-A.1 Section 10.5.5 of the Updated Final Safety Analysis Report (UFSAR), Revision 17 dated August 30, 1999, revised the discussion from the UFSAR that was previously provided regarding the maximum SFP heat load for batch and full core offloads. In order to facilitate NRC review of the capability of the SFPCCS to perform its function for EPU conditions, provide a discussion on the safety-related systems required to maintain fuel pool cooling within design bases temperature limits.

NRC Request SPLB-A.2 For EPU conditions, explain how the SFP water temperature will be maintained below 150 degrees Fahrenheit (F) for the worst-case normal (batch) and full core offload scenarios assuming a loss of offsite power and (for the batch offload only) a concurrent single active failure considering all possible initial configurations that can exist. Include a description of the maximum decay heat load that will exist in the SFP for each case, how these heat loads were determined, such that they represent the worst-case conditions, and what the cooling capacity is for the systems that are credited, including how this determination was made. Also:

a. Describe any operator actions that are required, how long it will take to complete these actions, and how this determination was made; and
b. Describe the maximum core decay heat load that will exist at the onset of fuel movement, how this determination was made, how this heat load will be accommodated while also satisfying E2-1

the SFP cooling requirements over the duration of the respective fuel offload scenarios, and including the situation where the SFP is isolated from the reactor vessel cavity.

NRC Request SPLB-A.3 Discuss how adequate SFP makeup capability is assured for EPU conditions in the unlikely event of a complete loss of SFP cooling capability, including how the maximum possible SFP boil-off rate compares with the assured makeup capability that exists, operator actions that must be taken, how long it will take to complete these actions and how this determination was made, and boron dilution considerations.

TVAs Supplemental Reply to SPLB-A.1, 2, and 3 TVA has previously provided information regarding the spent fuel pool cooling system at BFN and the effects of EPU in PUSAR Section 6.3 and in the December 19, 2005, reply to questions SPLB-A.1, SPLB-A.2, and SPLB-A.3. The following discussion is provided to clarify and provide supplemental information on the BFN spent fuel pool cooling system and is presented in the format (including numbering) of Attachment 2 to Matrix 5 of RS-001, "Review Standard for Extended Power Uprates," Revision 0, December 2003.

1. BACKGROUND The BFN fuel pool cooling and cleanup systems for Units 1, 2, and 3 are described in UFSAR Section 10.5. The systems cool the fuel storage pools by transferring the spent fuel decay heat through heat exchangers to the reactor building closed cooling water (RBCCW) systems. The system for each fuel pool consists of two circulating pumps connected in parallel, two heat exchangers, one filter demineralizer subsystem, two skimmer surge tanks, and the required piping, valves, and instrumentation. Four filter demineralizers are provided including one spare filter demineralizer shared between the three units. The pumps circulate the pool water in a closed loop, taking suction from the surge tanks, circulating the water through the heat exchangers and filter demineralizer, and discharging it through diffusers at the bottom of the fuel pool and reactor well (as required during refueling operations). The water flows from the pool surface through skimmer weirs and scuppers (wave suppressers) to the surge tanks.

The heat exchangers in the residual heat removal (RHR) system can be used in conjunction with the fuel pool cooling and cleanup system to supplement pool cooling (supplemental fuel pool cooling). Normal makeup water for the fuel pool cooling E2-2

system is transferred from the condensate storage tank to the skimmer surge tanks. A seismic Class I qualified source of makeup water is provided through the crosstie between the RHR system and fuel pool cooling system. If necessary, the intertie between the RHR service water (RHRSW) system and the RHR system can be utilized to admit raw water as makeup.

Also, a standpipe and hose connection is provided on each of the two emergency equipment cooling water (EECW) system headers which provide two additional fuel pool water makeup sources.

Additionally, the auxiliary decay heat removal (ADHR) system provides another means to remove decay heat and residual heat from the spent fuel pool and reactor cavity of BFN Units 2 and 3 and is described in UFSAR Section 10.22. As part of restart activities for BFN Unit 1, the ADHR system will be extended to include the spent fuel pool and reactor cavity of BFN Unit 1. During operation of this system, it is aligned to only one unit at a time. The ADHR system consists of two cooling water loops. The primary cooling loop circulates spent fuel pool water entirely inside the Reactor Building and rejects heat to a secondary loop by means of a heat exchanger. The secondary loop transfers heat to the atmosphere outside the Reactor Building by means of evaporative cooling towers.

Spent fuel pool cooling, including supplemental fuel pool cooling and ADHR, are non-safety systems. To ensure adequate makeup under all normal and off normal conditions, the RHR/RHRSW connection provides a permanently installed seismic Class I qualified makeup water source for the spent fuel pool. This ensures that irradiated fuel is maintained submerged in water and that reestablishment of normal fuel pool water level is possible under all anticipated conditions. Two additional sources of spent fuel pool water makeup are provided via a standpipe and hose connection on each of the two EECW headers. Each hose is capable of supplying makeup water in sufficient quantity to maintain fuel pool water level under conditions of no fuel pool cooling.

2. ACCEPTANCE CRITERIA The current design and operational basis for BFN spent fuel pool cooling system is as follows:
  • Administrative controls are used to ensure that the fuel pool heat load does not exceed available cooling capacity.
  • The capacity of the spent fuel pool cooling and the ADHR systems, considering seasonal cooling water temperatures and current heat exchanger conditions, are utilized to E2-3

maintain the fuel pool temperature at or below 125°F during normal refueling outages (average spent fuel batch discharged from the equilibrium fuel cycle).

  • The RHR system can be operated in parallel with the spent fuel pool cooling system to maintain the fuel pool temperature less than the Technical Requirements Manual (TRM) limit of 150°F if a full core off load is performed.

Plant instructions require that actions be taken well before exceeding this limit. The fuel pool temperature is normally maintained between 72°F and 125°F.

  • To ensure adequate makeup under all normal and off normal conditions (i.e. fuel pool water boil off), the RHR/RHRSW crosstie provides a permanently installed seismic Class I qualified makeup water source for the spent fuel pool.
  • Two additional sources of spent fuel pool water makeup are provided via a standpipe and hose connection on each of the two EECW headers. Each hose is capable of supplying makeup water in sufficient quantity to maintain fuel pool water level under conditions of no fuel pool cooling.

The design basis for the fuel pool cooling systems remains the same for the current and EPU conditions.

3. REVIEW PROCEDURES 3.1 Adequate SFP Cooling Capacity To demonstrate adequate SFP cooling capacity, BFN performs both bounding and cycle-specific calculations. The bounding calculations have been reperformed for EPU conditions as described below in Section 3.1.1 to ensure that the acceptance criteria will continue to be met. Additionally, as described in Section 3.1.2, cycle-specific calculations are performed to assess cooling system capability to ensure that fuel pool heat load does not exceed available cooling capacity. These calculations demonstrate that the acceptance criteria described in Section 2 will continue to be met under EPU conditions.

As a result of EPU, the normal spent fuel pool heat load will be higher than the pre-EPU heat load. EPU will result in higher decay heat in the discharged bundles to the spent fuel pool as well as an increase in the number of discharged fuel bundles at the end of each cycle. The heat removal capability of the spent fuel pool cooling system, the ADHR system, or the supplemental fuel pool cooling mode of the RHR system are not affected by EPU. The evaluations for spent fuel pool cooling, as discussed below, include the effects from EPU operation and provide the results E2-4

indicating that the design basis for the spent fuel pool will be maintained.

3.1.1 Bounding Calculation Consistent with the BFN design basis, two cases were analyzed: 1. Partial core offload with operation of the spent fuel pool cooling system and ADHR system, and

2. Full core offload with operation of the spent fuel pool cooling system and RHR supplemental fuel pool cooling mode. In each case the initial fuel pool temperature was assumed to be 100°F.
1. Partial Core Offload The capacity of the fuel pool cooling system and the ADHR system to maintain the fuel pool temperature at or below 125°F during partial core offloads was evaluated for EPU conditions.

The maximum decay heat loadings for the spent fuel pool were calculated using the ANSI/ANS 5.1-1979 Standard with two-sigma uncertainty. The heat load in the spent fuel pool is the sum of previous fuel offloads and the recent batch decay heats at the time of transfer. In this analysis, the offload consists of a batch of 332 fuel bundles offloaded to an almost full spent fuel pool. This batch size was chosen for analytical purposes; the actual batch size may vary.

The spent fuel pool was assumed to be previously loaded with 2375 bundles allowing a reserve space for a full core offload (764 cells). The 2375 bundles were assumed to have been offloaded in eight batches, discharged at 24 month intervals. For this case, core offload begins 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> after reactor shutdown. Fuel transfer time was estimated based on a transfer rate of 14 bundles per hour to the fuel pool. These decay heat and offload time estimates establish the limiting case maximum heat loads.

Cooling of the fuel pool conservatively assumes that only one heat exchanger/pump combination is available for each system. The heat exchanger effectiveness is based upon original design specifications including standard value fouling factors and tube plugging criteria. The evaluation only considers the mass of water in the fuel pool and assumes no circulation of water between the fuel pool and the cavity for the period of time that fuel pool gates are open while the fuel is being transferred to the pool.

E2-5

The results of this evaluation show that the peak spent fuel pool temperature remains less than 125°F under EPU conditions.

Table 1 Partial Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and ADHR1 Conditions/Parameters Value Peak spent fuel pool temperature (°F) 99.1 Time to peak spent fuel pool temperature (hours) 80 Time to boil from loss of all cooling at peak 14 temperature (hours)

Boil off rate (gpm) 48 1

Assumes core offload begins 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> after reactor shutdown to allow for cooldown, vessel head removal, refueling cavity filling, and other refueling preparations.

PUSAR Table 6-3 contains an additional case where a partial core offload was evaluated for one train each of the spent fuel pool cooling system and RHR supplemental fuel pool cooling mode. In that evaluation, the calculated peak spent fuel pool temperature of 124.9°F was less than 125°F.

E2-6

Table 2 Partial Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and RHR Supplemental Fuel Pool Cooling Mode1 Conditions/Parameters Value Peak spent fuel pool temperature (°F) 124.9 Time to peak spent fuel pool temperature (hours) 130 Time to boil from loss of all cooling at peak 13 temperature (hours)

Boil off rate (gpm) 42 1

Assumes core offload begins 95 hours0.0011 days <br />0.0264 hours <br />1.570767e-4 weeks <br />3.61475e-5 months <br /> after reactor shutdown and includes 45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> of invessel stay time because the RHR supplemental fuel pool cooling mode has less heat removal capacity than the ADHR.

E2-7

2. Full Core Offload The capacity of the spent fuel pool cooling system and the RHR supplemental fuel pool cooling mode to maintain the fuel pool temperature at or below 150°F during a full core off load is evaluated for EPU conditions.

The maximum decay heat loadings for the spent fuel pool were calculated using the ANSI/ANS 5.1-1979 Standard with two-sigma uncertainty. The heat load in the spent fuel pool is the sum of previous fuel offloads and the recent full core decay heats at the time of transfer. The pool is assumed to be previously loaded with 2707 bundles.

The prior offload batches were assumed to be the same as the partial core offload case above with an additional batch of 332 fuel assemblies having been discharged from the reactor core, all of which has been cooled for an additional 24 months. (The partial offload batch size was chosen for analytical purposes; the actual may vary.)

The initiation of fuel offloading was a minimum of 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> after plant shutdown based upon shutdown cooling requirements, head removal time and refueling preparation. Actual times were determined based on the calculated heat removal capacity of the cooling mode.

For this case, core offload begins 165 hours0.00191 days <br />0.0458 hours <br />2.728175e-4 weeks <br />6.27825e-5 months <br /> after reactor shutdown and includes 115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> of invessel stay time because the RHR supplemental fuel pool cooling mode has less heat removal capacity than the ADHR system.

Fuel transfer time was estimated based on a transfer rate of 14 bundles per hour to the fuel pool. These decay heat and offload time estimates establish the limiting case maximum heat loads.

Cooling of the fuel pool conservatively assumes that only one heat exchanger/pump combination is available for each system. The heat exchanger effectiveness is based upon original design specifications including standard value fouling factors and tube plugging criteria. The evaluation only considers the mass of water in the fuel pool and assumes no circulation of water between the fuel pool and the cavity for the period of time that fuel pool gates are open while the fuel is being transferred to the pool.

The results of this evaluation show that the peak spent fuel pool temperature remains less than 150°F under EPU conditions.

E2-8

Table 3 Full Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and RHR Supplemental Fuel Pool Cooling Mode1 Conditions/Parameters Value Peak spent fuel pool temperature (°F) 149.8 Time to peak spent fuel pool temperature (hours) 229 Time to boil from loss of all cooling at peak 4 temperature (hours)

Boil off rate (gpm) 80 1

Assumes core offload begins 165 hours0.00191 days <br />0.0458 hours <br />2.728175e-4 weeks <br />6.27825e-5 months <br /> after reactor shutdown and includes 115 hours0.00133 days <br />0.0319 hours <br />1.901455e-4 weeks <br />4.37575e-5 months <br /> of invessel stay time because the RHR supplemental fuel pool cooling mode has less heat removal capacity than the ADHR.

PUSAR Table 6-3 contains an additional case where a full core offload was evaluated for one train each of the spent fuel pool cooling system and ADHR system. In that evaluation, the calculated peak spent fuel pool temperature of 121.5°F was also less than 150°F.

Table 4 Full Core Offload Evaluation Results for One Train Each of Spent Fuel Pool Cooling System and ADHR1 Conditions/Parameters Value Peak spent fuel pool temperature (°F) 121.5 Time to peak spent fuel pool temperature (hours) 109 Time to boil from loss of all cooling at peak 5 temperature (hours)

Boil off rate (gpm) 104 1

Assumes core offload begins 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> after reactor shutdown to allow for cooldown, vessel head removal, refueling cavity filling, and other refueling preparations.

E2-9

3.1.2 Cycle-Specific Calculation Unloading the reactor core and the associated increase in fuel pool heat load is a controlled evolution.

Administrative controls are used to ensure that the fuel pool heat load does not exceed available cooling capacity, such that the fuel pool gates are not closed until the decay heat load is less than or equal to the fuel pool cooling heat exchanger capacity. Performance of the fuel pool cooling systems is predicted prior to each refueling outage as part of the Outage Risk Assessment Review (ORAM) process.

In addition to the following discussion, BFN is taking additional actions to further augment procedures pertaining to the cycle specific administrative controls.

Procedure changes will be generated (1) to define and control the generation of cycle-specific fuel pool heat load calculations, and (2) to control the installation of the fuel pool gates based on the calculated fuel pool heat load.

Cycle-specific analysis conditions:

(1) Predicted decay heat for both the spent fuel pool and reactor core are determined by utilizing a TVA code (DHEAT) that complies with the methods of ANSI/ANS 5.1. The history of previous fuel discharges is used as input into the decay heat load determination for the spent fuel pool. The decay heat results are best-estimate values and are provided for a range of decay times that may be needed for the spent fuel pool evaluations.

(2) Cooling system heat removal is calculated utilizing a spreadsheet based on heat balances of the affected systems. Fuel pool cooling capacity of the systems is based upon inlet cooling temperatures, system flow rates, trains in service, and heat exchanger performance values.

(3) As described in (2) above, heat removal capabilities are determined for each of the BFN cooling trains, including the normal spent fuel pool cooling system, the ADHR system, and the supplemental fuel pool cooling mode of RHR.

(4) The limiting parameter for heat load and heat removal capability is the insertion of the fuel pool gates following core offload. When the fuel pool gates are removed and spent fuel movement begins, additional E2-10

cooling is provided by the shutdown cooling system that provides decay heat removal directly to the reactor vessel. Evaluations of the spent fuel pool temperature following discharge of the partial core offload are performed based on cooling system configurations to ensure that the spent fuel pool temperature can be maintained without the additional heat removal capacity of the shutdown cooling system.

(5) (As discussed with the NRC staff on April 13, 2006, TVA will address this item in a supplemental reply.)

(6) Administrative controls are provided as part of ORAM to ensure that appropriate controls are provided for shutdown safety. These controls ensure proper assessment of key shutdown areas (i.e., reactivity control, shutdown cooling, AC power, fuel pool cooling, etc.). Spent fuel pool cooling assessments are performed prior to the outage and updated during the outage to ensure appropriate controls are maintained for the safe operation of spent fuel pool cooling.

3.2 Adequate Make-Up Supply The evaluations described in Sections 3.1.1.1 and 3.1.1.2 above are used to determine the time to boil for make-up capability. These evaluations assume only one train of each cooling system is in operation to determine the peak spent fuel pool temperature. At the time of peak spent fuel pool temperature, it is assumed that all spent fuel pool cooling is lost. Based on decay heat, the time to reach boiling conditions is then calculated. The results are provided in Tables 1 through 4 above.

The minimum time to reach boiling is four hours based on the case presented in Table 3. This case involves a full core offload and assumed loss of all cooling at the peak spent fuel pool temperature of 149.8°F. The associated boil off rate is 80 gpm.

The maximum boil off rate is 104 gpm based on the case presented in Table 4. This case involves a full core offload and assumed loss of all cooling at the peak spent fuel pool temperature of 121.5°F. The associated time to reach boiling is five hours.

For BFN the RHR/RHRSW crosstie provides a permanently installed seismic Class I qualified makeup water source for the spent fuel pool. This supply can be aligned within the E2-11

minimum four hours calculated above and can supply greater than 150 gpm to the spent fuel pool.

Two additional sources of spent fuel pool water makeup are provided via a standpipe and hose connection on each of the two EECW headers. Each hose is capable of supplying makeup water at 150 gpm to the spent fuel pool within the minimum four hours calculated above.

E2-12

ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2, AND 3 TECHNICAL SPECIFICATIONS (TS) CHANGE NOS. TS-418 AND TS-431 -

COMMITMENT LISTING Prior to implementing EPU, procedure changes will be generated (1) to define and control the generation of cycle-specific fuel pool heat load calculations, and (2) to control the installation of the fuel pool gates based on the calculated fuel pool heat load.

E3-1