{{#Wiki_filter:COPY 5) Pillsbury Winthrop Shaw Pittnian,, 2300 N Street NW Te1202.663.8142 , Washmgton, DC 20037-1 122 Fax 202.663.8007 www.pillsburybw.com . , RELATED CORRESPONDENCE June 18,2007 ~atiks F. Travieso-Diaz e , Phone: 202.663.8 142 , matias.travieso-diaz@pillsbvlaw.com BY OVERNIGHT MAIL I I DOCKETED USNRC Karen Tyler, Esq.
{{#Wiki_filter:COPY 5 )                                                                               2300 N Street NW           Te1202.663.8142 Pillsbury                                                                ,   Washmgton, DC 20037-1122    Fax 202.663.8007 www.pillsburybw.com     .,
Shems, Dunkiel, Kassel & Saunders, PLLC June 27,2007 (3:39pm 91 college Street Burlington, VT 05401 OFFICE OF SECRETARY
Winthrop Shaw                                        RELATED CORRESPONDENCE Pittnian,,
' RULEMAKINGS AND ADJUDICflIONS STAFF . . c. ., . In the Matter of , Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc. (Vermont Yankee NucIear Power Station)
June 18,2007                                                                     ~atiksF. Travieso-Diaz         e ,
Docket No. 50-271-LR; ASLBP.No.
Phone:202.663.8142              ,
06-849-03-LR  
matias.travieso-diaz@pillsbvlaw.com BY OVERNIGHT MAIL                                         I DOCKETED I                                 USNRC Karen Tyler, Esq.
,',, .., , Re: ' Steam Dwer inspection Documentation ,  
Shems, Dunkiel, Kassel & Saunders, PLLC                                               June 27,2007 (3:39pm 91 college Street                                                                   OFFICE OF SECRETARY            '
Burlington, VT 05401                                                                   RULEMAKINGS AND ADJUDICflIONS
                                                                                                  . .
STAFF c   .           ., .
In the Matter of ,
Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.
(Vermont Yankee NucIear Power Station)
Docket No. 50-271-LR; ASLBP.No. 06-849-03-LR
                                ,',, .., ,
Re:     ' Steam Dwer inspection Documentation
                                .'
          ,  


==Dear Ms. Tyler:==
==Dear Ms. Tyler:==
. ' As discussed at the telephone prehearing conference with the Licensing Board in the above captioned proceeding, an inspection of the steam dryer was conducted during the May 2007 refueling outage (RF026) at the Vermont Yankee Nuclear Station
 
("VY"). A number of reports were generated as a result of the inspection, which have now become available.
As discussed at the telephone prehearing conference with the Licensing Board in the above captioned proceeding, an inspection of the steam dryer was conducted during the May 2007 refueling outage (RF026) at the Vermont Yankee Nuclear Station ("VY"). A number of reports were generated as a result of the inspection, which have now become available.
Enclosed with this letter are seventeen (1 7) Steam Dryer Indication Notification Reports prepared by GE Nuclear Energy describing the results of the inspection. Also enclosed is Entergy's Engineering Report No. VY-RPT-07-00011 (Rev.
Enclosed with this letter are seventeen (1 7) Steam Dryer Indication Notification Reports prepared by GE Nuclear Energy describing the results of the inspection. Also enclosed is Entergy's Engineering Report No. VY-RPT-07-00011 (Rev. 0, June 15,2007), entitled "Evaluation of New RF026 Steam Dryer Indication".
0, June 15,2007), entitled "Evaluation of New RF026 Steam Dryer Indication".
In addition to the documents enclosed herewith, GE Nuclear prepared two evaluation reports, Nos. GENE 0000-0068-4787 (May 29,2007) and GENE-0000-0068-7307 (June 4,2007) that evaluate the indications observed during the steam dryer inspections. These two reports are not enclosed because they are proprietary to GE. They are, however, available for inspection at the VY site.
In addition to the documents enclosed herewith, GE Nuclear prepared two evaluation reports, Nos. GENE 0000-0068-4787 (May 29,2007) and GENE-0000-0068-7307 (June 4,2007) that evaluate the indications observed during the steam dryer inspections.
 
These two reports are not enclosed because they are proprietary to GE. They are, however, available for inspection at the VY site.
Karen Tyler, Esq.
Karen Tyler, Esq.June 18, 2007 Page 2 The documents enclosed herewith will be formally produced in the Eighth Supplemental Disclosure on July 5, 2007. The two additional reports prepared by GE Nuclear will be listed in the privilege log that will accompany the July 5, 2007 disclosure.
June 18, 2007 Page 2 The documents enclosed herewith will be formally produced in the Eighth Supplemental Disclosure on July 5, 2007. The two additional reports prepared by GE Nuclear will be listed in the privilege log that will accompany the July 5, 2007 disclosure.
Please note that in making these documents available to NEC we are not admitting that they are in any way relevant to Entergy's pending motion for summary disposition of NEC Contention 3 (steam dryer).Sincerely, Matias F. Travieso-Diaz Enclosures cc: Mary Baty, Esq. (w/enclosures)
Please note that in making these documents available to NEC we are not admitting that they are in any way relevant to Entergy's pending motion for summary disposition of NEC Contention 3 (steam dryer).
Sincerely, Matias F. Travieso-Diaz Enclosures cc: Mary Baty, Esq. (w/enclosures)
Service List (w/o enclosures)
Service List (w/o enclosures)
Pillsbury Winthrop Shaw Pittman LLP}}
Pillsbury Winthrop Shaw Pittman LLP}}

Revision as of 05:00, 23 November 2019

2007/06/18-Letter from Matias F. Travieso-Diaz to Karen Tyler Regarding the Vermont Yankee Steam Dryer Inspection Documentation
ML071790203
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 06/18/2007
From: Travieso-Diaz M
Pillsbury, Winthrop, Shaw, Pittman, LLP
To: Tyler K
Office of Nuclear Reactor Regulation, Shems, Dunkiel, Kassel, & Saunders, PLLC
SECY RAS
References
50-271-LR, ASLBP 06-849-03-LR, RAS 13805
Download: ML071790203 (2)


Text

COPY 5 ) 2300 N Street NW Te1202.663.8142 Pillsbury , Washmgton, DC 20037-1122 Fax 202.663.8007 www.pillsburybw.com .,

Winthrop Shaw RELATED CORRESPONDENCE Pittnian,,

June 18,2007 ~atiksF. Travieso-Diaz e ,

Phone:202.663.8142 ,

matias.travieso-diaz@pillsbvlaw.com BY OVERNIGHT MAIL I DOCKETED I USNRC Karen Tyler, Esq.

Shems, Dunkiel, Kassel & Saunders, PLLC June 27,2007 (3:39pm 91 college Street OFFICE OF SECRETARY '

Burlington, VT 05401 RULEMAKINGS AND ADJUDICflIONS

. .

STAFF c . ., .

In the Matter of ,

Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations, Inc.

(Vermont Yankee NucIear Power Station)

Docket No. 50-271-LR; ASLBP.No. 06-849-03-LR

,',, .., ,

Re: ' Steam Dwer inspection Documentation

.'

,

Dear Ms. Tyler:

As discussed at the telephone prehearing conference with the Licensing Board in the above captioned proceeding, an inspection of the steam dryer was conducted during the May 2007 refueling outage (RF026) at the Vermont Yankee Nuclear Station ("VY"). A number of reports were generated as a result of the inspection, which have now become available.

Enclosed with this letter are seventeen (1 7) Steam Dryer Indication Notification Reports prepared by GE Nuclear Energy describing the results of the inspection. Also enclosed is Entergy's Engineering Report No. VY-RPT-07-00011 (Rev. 0, June 15,2007), entitled "Evaluation of New RF026 Steam Dryer Indication".

In addition to the documents enclosed herewith, GE Nuclear prepared two evaluation reports, Nos. GENE 0000-0068-4787 (May 29,2007) and GENE-0000-0068-7307 (June 4,2007) that evaluate the indications observed during the steam dryer inspections. These two reports are not enclosed because they are proprietary to GE. They are, however, available for inspection at the VY site.

Karen Tyler, Esq.

June 18, 2007 Page 2 The documents enclosed herewith will be formally produced in the Eighth Supplemental Disclosure on July 5, 2007. The two additional reports prepared by GE Nuclear will be listed in the privilege log that will accompany the July 5, 2007 disclosure.

Please note that in making these documents available to NEC we are not admitting that they are in any way relevant to Entergy's pending motion for summary disposition of NEC Contention 3 (steam dryer).

Sincerely, Matias F. Travieso-Diaz Enclosures cc: Mary Baty, Esq. (w/enclosures)

Service List (w/o enclosures)

Pillsbury Winthrop Shaw Pittman LLP