ML17326A335: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 6: Line 6:
| number = ML17326A337
| number = ML17326A337
| issue date = 11/07/1979
| issue date = 11/07/1979
| title = Forwards LER 79-053/03L-0
| title = LER 79-053/03L-0:on 791012,loop 3 Channel 4 Steam Generator Level Failed.Caused by Faulty Containment Cable Penetration. Penetration Feedthrough Switched to Spare Penetration & New Feedthrough Checked for Operability
| author name = Delong S
| author name = Delong S
| author affiliation = INDIANA MICHIGAN POWER CO.
| author affiliation = INDIANA MICHIGAN POWER CO.

Latest revision as of 05:05, 7 March 2020

Forwards LER 79-053/03L-0
Date released: 05/31/2018 Download: ML17326A335


LER 79-053/03L-0:on 791012,loop 3 Channel 4 Steam Generator Level Failed.Caused by Faulty Containment Cable Penetration. Penetration Feedthrough Switched to Spare Penetration & New Feedthrough Checked for Operability
ML17326A337
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/07/1979
From: Delong S
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17326A337 (2)
Forwards LER 79-053/03L-0
ML17326A334
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 11/07/1979
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
TASK-OS, TASK-RS-902-4
Download: ML17326A334 (2)