ML17289B226: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:seem,mam oonmmx orsx m"row svsxmr | {{#Wiki_filter:Ci ~ | ||
NO DOCKET FACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L. | seem,mam REGULA oonmmx INFORMATION DISTRIBUTI orsx m"row svsxmr YSTEM (RIDS) | ||
Washington Public Power Supply System BAKER,J.W. | ACCESSION NBR:9303190385 DOC.DATE: 93/02/28 NOTARIZED: NO DOCKET FACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION | ||
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating rept for Feb 1993 for Washington Nuclear Plant 2.W/undated ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD5 LA CLIFFORD,J INTERNAL: ACRS AEOD/DSP/TPAB NRR/DRIL/RPEB RGN5 EXTERNAL: EG6G BRYCE,J.H | Monthly operating rept for Feb 1993 for Washington Nuclear Plant 2.W/undated ltr. | ||
I'LEASE HELP US'fO REDUCE WASTE!CONTACT TIIE DOCUMENT CON'fROL DESK, ROOM Pl-37 (EXT.504-2065)TO | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: | ||
TITLE: Monthly Operating Report (per Tech Specs) | |||
NOTES: | |||
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCZ ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR DORS/OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FIL 01 1 1 RGN5 1 1 EXTERNAL: EG6G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS: | |||
I'LEASE HELP US 'fO REDUCE WASTE! CONTACT TIIE DOCUMENT CON'fROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | |||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 | |||
' | |||
'0 | |||
~ | |||
t aw 1 | |||
( q ., s, sn I | |||
'I | |||
vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 G02-93-059 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 | |||
==Dear Sir:== | ==Dear Sir:== | ||
==Subject:== | ==Subject:== | ||
NUCLEAR PLANT NO.2 | NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT FEBRUARY, 1993 Transmitted herewith is the Monthly Operating Report for the month of February, 1993 as required by our Technical Specifications 6.9.1.6. | ||
OPERATING DATA REPORT WNP-2 DATE: March 1, 1993 DOCKET: 50-397 REPORTING PERIOD: Feb-93 OUTAGE+ON-LINE HOURS: 672 3. | Very truly ours, J. W. Baker WNP-2 Plant Manager (MD 927M) | ||
0 I ,)I I-DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: MARCH 8;1993 COMPLETED BY: LB HUTCHISON TELEPHONE: | LBH/hh cc: Mr. W;: H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington, CT Mr. R. C. Barr, NRC Resident Inspector (901A) | ||
(509)377-~6 UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: FEBRUARY, 1993 NO.DATE TYPE HOURS REASON METHOD I.ER NO SYSTEM COMPONENT CAUSE&CORRECTIVE ACTION TO PREVENT RECURRENC 93-03 2/01/93 S 92.74 B | Mr. J. T. Wheelock, INPO Mr. F. Yost, Utility Data Institute tgyta I ~ | ||
Reactor automatically scrammed on low level due to loss of reactor feedwater pump.The cause of failure was an electric coil in the feed pump governor control circuitry. | 9303i90385 930228, | ||
After repairs were performed, startup activities were placed on administrative hold while an assessment was performed on recent plant problems.After compl of assessment, the plant was returned to service. | 'PDR R | ||
'-'" | |||
ADOCK 05000397 | |||
- . PDR | |||
4 g* wj 1 | |||
P | |||
. 4 fl,lt~., N I', | |||
l'I ~ | |||
OPERATING DATA REPORT WNP-2 DATE: March 1, 1993 DOCKET: 50-397 REPORTING PERIOD: Feb-93 OUTAGE + ON-LINE HOURS: 672 | |||
: 3. UTILITYCONTACT: Leonard Hutchison (509) 377-2486 4 LICENSED THERMAL POWER (MWt) 3323 | |||
: 5. RATING (GROSS MWe): 'AMEPLATE 1200.9 | |||
: 6. DESIGN ELECTRICAL RATING (NET MWe): 1120 | |||
: 7. MAXIMUMDEPENDABLE CAPACITY (GROSS MWe): 1165 | |||
: 8. MAXIMUMDEPENDABLE CAPACITY (NET MWe): 1112 | |||
: 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE | |||
: 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe): | |||
REASONS FOR RESTRICTIONS, IF ANY: N NE MONTH YEAR CUMULATIVE | |||
: 12. REPORT PERIOD HOURS 672.0 1,416.0 71,984.2 | |||
: 13. HOURS REACTOR CRITICAL 435.9 968.3 50,116.9 | |||
: 14. RX RESERVE SHUTDOWN HOURS 0.0 0.0 340.4 | |||
: 15. HOURS GENERATOR ON LINE 386.5 878.3 48,186.0 | |||
: 16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7 | |||
: 17. GROSS THERMAL ENERGY (MWH) 1,057,089 2,668,613 139,833,263 | |||
: 18. GROSS ELECTRICAL ENERGY (he<) 361,160 924,470 46,773,560 | |||
: 19. NET ELECTRICAL ENERGY (MWH) 339,012 873,977 44,824,396 | |||
: 20. UNIT SERVICE FACTOR 57.5% 62.0% 66.9% | |||
: 21. UNIT AVAILABILITY FACTOR 57.5% 62.0% 67.5% | |||
: 22. UNIT CAPACITY FACTOR (MDC NET) 45.4% 55.5% 56.9% | |||
: 23. UNIT CAPACITY FACTOR (DER NET) 45.0% 55.1% 56.6% | |||
: 24. UNIT FORCED OUTAGE RATE 33,3% 30.9% 13.7% | |||
: 25. FORCED OUTAGE HOURS 192.8 392.5 7,665.8 | |||
: 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION: | |||
REF ELIN TA E R8 S BED LED F R APRIL 30 1 93 FOR 4 DAY | |||
: 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE: | |||
0 I | |||
, )I I- | |||
DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: MARCH 8; 1993 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-~6 UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: FEBRUARY, 1993 NO. DATE TYPE HOURS REASON METHOD I.ER NO SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENC 93-03 2/01/93 S 92.74 B N/A HA Turbine Turbine bearing vibration reached unacceptable levels, resulting in plant shutdown. After completion of turbine balance, plant startup was further delayed due to containment isolation valve problems. After valves were repaired, the plant was returned to service. | |||
9344 2/06/93 F 32.42 A 93~ CB Pumpxx Reactor was manually scrammed when reactor recirc pump failed to transfer to 60 HZ operation due to false signal (noise) in the pump control circuitry. | |||
93%5 2/10/93 F 160.38 A 93-007 CH Pumpxx Reactor automatically scrammed on low level due to loss of reactor feedwater pump. The cause of failure was an electric coil in the feed pump governor control circuitry. After repairs were performed, startup activities were placed on administrative hold while an assessment was performed on recent plant problems. After compl of assessment, the plant was returned to service. | |||
==SUMMARY== | ==SUMMARY== | ||
: F-FORCED | : | ||
'4 lt~~LWW | REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBIT F & H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG -0161) | ||
~4+f~~0 AVERAGE | |||
50-397 WNP-2 FEBRUARY, 1993 LB HUTCHISON (509)377-2486 MONTH: FEBRUARY, 1993 DAY AVERAGE | ' | ||
4 lt ~ | |||
~ LWW 4 A C | |||
~ 4 + f ~ ~ | |||
0 AVERAGE DAILYVNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: FEBRUARY, 1993 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: FEBRUARY, 1993 DAY AVERAGE DAILYPOWER LEVEL DAY 'AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET) | |||
&2 17. 102 | |||
: 2. 18. 823 | |||
: 3. 19. 1078 | |||
: 4. 20. 1075 | |||
: 5. 21. | |||
I | |||
: 6. 72 22. 1110 | |||
: 7. 27 23. 1106 | |||
: 8. 24. | |||
: 9. 948 1113 | |||
: 10. o 657 26. 1091 | |||
: 27. 1103 12, 28. 1108 13. | |||
14. | |||
15. | |||
16. | |||
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT. | |||
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET | |||
, SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.}} |
Revision as of 13:50, 29 October 2019
ML17289B226 | |
Person / Time | |
---|---|
Site: | Columbia |
Issue date: | 02/28/1993 |
From: | John Baker, Hutchison L WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
GO2-93-059, GO2-93-59, NUDOCS 9303190385 | |
Download: ML17289B226 (9) | |
Text
Ci ~
seem,mam REGULA oonmmx INFORMATION DISTRIBUTI orsx m"row svsxmr YSTEM (RIDS)
ACCESSION NBR:9303190385 DOC.DATE: 93/02/28 NOTARIZED: NO DOCKET FACIAL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L. Washington Public Power Supply System BAKER,J.W. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for Feb 1993 for Washington Nuclear Plant 2.W/undated ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCZ ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 CLIFFORD,J 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR DORS/OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FIL 01 1 1 RGN5 1 1 EXTERNAL: EG6G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
I'LEASE HELP US 'fO REDUCE WASTE! CONTACT TIIE DOCUMENT CON'fROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24
'
'0
~
t aw 1
( q ., s, sn I
'I
vi WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 G02-93-059 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Dear Sir:
Subject:
NUCLEAR PLANT NO. 2 MONTHLYOPERATING REPORT FEBRUARY, 1993 Transmitted herewith is the Monthly Operating Report for the month of February, 1993 as required by our Technical Specifications 6.9.1.6.
Very truly ours, J. W. Baker WNP-2 Plant Manager (MD 927M)
LBH/hh cc: Mr. W;: H. Lovelace, NRC, Washington, DC Mr. J. B. Martin, NRC Region V Ms. Dottie Sherman, ANI, Farmington, CT Mr. R. C. Barr, NRC Resident Inspector (901A)
Mr. J. T. Wheelock, INPO Mr. F. Yost, Utility Data Institute tgyta I ~
9303i90385 930228,
'PDR R
'-'"
ADOCK 05000397
- . PDR
4 g* wj 1
P
. 4 fl,lt~., N I',
l'I ~
OPERATING DATA REPORT WNP-2 DATE: March 1, 1993 DOCKET: 50-397 REPORTING PERIOD: Feb-93 OUTAGE + ON-LINE HOURS: 672
- 3. UTILITYCONTACT: Leonard Hutchison (509) 377-2486 4 LICENSED THERMAL POWER (MWt) 3323
- 5. RATING (GROSS MWe): 'AMEPLATE 1200.9
- 6. DESIGN ELECTRICAL RATING (NET MWe): 1120
- 7. MAXIMUMDEPENDABLE CAPACITY (GROSS MWe): 1165
- 8. MAXIMUMDEPENDABLE CAPACITY (NET MWe): 1112
- 9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: NONE
- 10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):
REASONS FOR RESTRICTIONS, IF ANY: N NE MONTH YEAR CUMULATIVE
- 12. REPORT PERIOD HOURS 672.0 1,416.0 71,984.2
- 13. HOURS REACTOR CRITICAL 435.9 968.3 50,116.9
- 14. RX RESERVE SHUTDOWN HOURS 0.0 0.0 340.4
- 15. HOURS GENERATOR ON LINE 386.5 878.3 48,186.0
- 16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
- 17. GROSS THERMAL ENERGY (MWH) 1,057,089 2,668,613 139,833,263
- 18. GROSS ELECTRICAL ENERGY (he<) 361,160 924,470 46,773,560
- 19. NET ELECTRICAL ENERGY (MWH) 339,012 873,977 44,824,396
- 20. UNIT SERVICE FACTOR 57.5% 62.0% 66.9%
- 21. UNIT AVAILABILITY FACTOR 57.5% 62.0% 67.5%
- 22. UNIT CAPACITY FACTOR (MDC NET) 45.4% 55.5% 56.9%
- 23. UNIT CAPACITY FACTOR (DER NET) 45.0% 55.1% 56.6%
- 24. UNIT FORCED OUTAGE RATE 33,3% 30.9% 13.7%
- 25. FORCED OUTAGE HOURS 192.8 392.5 7,665.8
- 26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, DURATION:
REF ELIN TA E R8 S BED LED F R APRIL 30 1 93 FOR 4 DAY
- 27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:
0 I
, )I I-
DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: MARCH 8; 1993 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-~6 UNIT SHUTDOWNS REDUCTIONS REPORT PERIOD: FEBRUARY, 1993 NO. DATE TYPE HOURS REASON METHOD I.ER NO SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENC 93-03 2/01/93 S 92.74 B N/A HA Turbine Turbine bearing vibration reached unacceptable levels, resulting in plant shutdown. After completion of turbine balance, plant startup was further delayed due to containment isolation valve problems. After valves were repaired, the plant was returned to service.
9344 2/06/93 F 32.42 A 93~ CB Pumpxx Reactor was manually scrammed when reactor recirc pump failed to transfer to 60 HZ operation due to false signal (noise) in the pump control circuitry.
93%5 2/10/93 F 160.38 A 93-007 CH Pumpxx Reactor automatically scrammed on low level due to loss of reactor feedwater pump. The cause of failure was an electric coil in the feed pump governor control circuitry. After repairs were performed, startup activities were placed on administrative hold while an assessment was performed on recent plant problems. After compl of assessment, the plant was returned to service.
SUMMARY
REASON METHOD SYSTEM & COMPONENT F-FORCED A-EQUIP FAILURE F-ADMIN 1-MANUAL EXHIBIT F & H S-SCHED B-MAINTOR TEST G-OPER ERROR 2-MANUALSCRAM INSTRUCTIONS FOR C-REFUELING H-OTHER 3-AUTO SCRAM PREPARATION OF D-REGULATORY RESTRICTION 4-CONTINUED DATA ENTRY SHEET E-OPERATOR TRAINING & 5-REDUCED LOAD LICENSEE EVENT REPORT LICENSE EXAM 9-OTHER (LER) FILE (NUREG -0161)
'
4 lt ~
~ LWW 4 A C
~ 4 + f ~ ~
0 AVERAGE DAILYVNIT POWER LEVEL DOCKET NO.: 50-397 UNIT: WNP-2 DATE: FEBRUARY, 1993 COMPLETED BY: LB HUTCHISON TELEPHONE: (509) 377-2486 MONTH: FEBRUARY, 1993 DAY AVERAGE DAILYPOWER LEVEL DAY 'AVERAGE DAILYPOWER LEVEL (MWe-NET) (MWe-NET)
&2 17. 102
- 2. 18. 823
- 3. 19. 1078
- 4. 20. 1075
- 5. 21.
I
- 6. 72 22. 1110
- 7. 27 23. 1106
- 8. 24.
- 9. 948 1113
- 10. o 657 26. 1091
- 27. 1103 12, 28. 1108 13.
14.
15.
16.
INSTRUCTIONS ON THIS FORM, LIST THE AVERAGE DAILYUNIT POWER LEVEL IN MWe-NET FOR EACH DAY IN THE REPORTING MONTH. COMPUTE TO THE NEAREST WHOLE MEGAWATT.
THESE FIGURES WILLBE USED TO PLOT A GRAPH FOR EACH REPORTING MONTH. NOTE THAT WHEN MAXIMUMDEPENDABLE CAPACITYIS USED FOR THE NET ELECTRICALRATING OF THE UNIT, THRE MAY BE OCCASIONS WHEN THE DAILY AVERAGE POWER LEVEL EXCEEDS THE 100Fo LINE (OR THE RESTRICTED POWER LEVEL LINE). IN SUCH CASES, THE AVERAGE DAILYUNIT POWER OUTPUT SHEET
, SHOULD BE FOOTNOTED TO EXPLAINTHE APPARENT ANOMALY.