ML18038A176: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REQUL ORY INFOR~)1ATION DISTRIBUTE BYBTEN (RIDB)'CCESSION NBR: 8607070388 DQC.DATE: 86/06/26 NOTARIZED:
{{#Wiki_filter:REQUL   ORY INFOR~)1ATION   DISTRIBUTE     BYBTEN (RIDB)
YEB DOCKET 0 FACIL: 50-410 Nine Nile Point Nuclear Station>Unit 2>Niagara aloha 05000410 AUTH.NANE AUTHOR AFFILI ATION NANGAN>C.V.Niagav a Nohawl: Power Cov p.RECIP NANE RECIPIENT AFFILIATION ADENSAN>E.Q.BllR Pv object Div ectov ate 3  
'CCESSION NBR: 8607070388             DQC. DATE: 86/06/26 NOTARIZED: YEB             DOCKET 0 FACIL: 50-410 Nine Nile       Point Nuclear Station> Unit 2> Niagara         aloha 05000410 AUTH. NANE             AUTHOR   AFFILIATION NANGAN> C. V.         Niagav a Nohawl: Power Cov p.
RECIP NANE             RECIPIENT AFFILIATION ADENSAN> E. Q.         BllR Pv object Div ectov ate 3


==SUBJECT:==
==SUBJECT:==
Forwards changes to FBAR Sections 9.5.1 8c 9A.3 v'e f iv e pv otection pv ogv'am cav bon dioxide sos>fov appl oYal.Changes v emove c ommi tment to use CQ2 in nonsa f et'-related av'eas.FBAR will be amended in future.lJ/three oversize encls.DISTRIBUTION CODE: B002D COPIES RECEIVED: LTR ENCL SI ZE: TITLE: I icensing Submittal:
Forwards changes     to FBAR Sections 9. 5. 1 8c 9A. 3 v'e f iv e pv otection pv ogv'am cav bon dioxide sos> fov appl oYal. Changes v emove c ommi tment to use CQ2 in nonsa f et'-related av'eas. FBAR will be amended in future. lJ/three oversize encls.
Fire Protection NOTES: REC IP lENT ID CODE/MANE BWR ADTS 0/JR PD3 PD CQP IEB LTTR ENCL 1 1 RECIP I ENT ID CODE/NANE BWR PD3 LA HAUQHEY>N 01 COP IES LTTR ENCL 1 0 1 1 INTERNAL: ACRB ELD/HDB3 10 04 6 6 1 0 1 ADN/LFNB NRR STANQ>J RQNi 1 0 3 3 1 EXTERNAL LPDR NSIC 03 05 1'RC PDR 1 1 02 TOTAL NUNBER OF COPIES REQUIRED: LTTR 20 ENCL 17 0 S f1 il NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE.N,Y.13202/TELEPHONE (315)474-1511 t June 25, 1986 (NMP2L 0758)Ms.Elinor G.Adensam, Director BWR Project Directorate No.3 U.S.Nuclear Regulatory Commission 7920 Norfolk Avenue Washington, DC 20555
DISTRIBUTION CODE: B002D         COPIES RECEIVED: LTR         ENCL     SI ZE:
TITLE: I icensing Submittal: Fire Protection NOTES:
REC IP lENT         CQP IEB            RECIP I ENT        COP  IES ID CODE/MANE         LTTR ENCL        ID CODE/NANE        LTTR ENCL BWR   ADTS                               BWR PD3 LA            1      0 0/JR PD3 PD               1     1     HAUQHEY> N       01   1     1 INTERNAL: ACRB               10       6     6       ADN/LFNB              1     0 ELD/HDB3                  1     0      NRR STANQ>   J         3     3 04              1      RQNi                          1 EXTERNAL   LPDR             03             1   'RC   PDR         02 NSIC              05      1     1 TOTAL NUNBER OF COPIES REQUIRED:           LTTR   20   ENCL     17


==Dear Ms.Adensam:==
0 S
Re: Nine Mile Point Unit 2 Docket No.50-410 The Nine Mile Point Unit 2 Final Safety Analysis Report describes the Fire Protection Program.Carbon dioxide systems are installed in both safety related and nonsafety related areas as described in Sections 9.5.1.and 9A.3.Carbon dioxide systems will comply with NFPA Standard 12 for safety related areas.Preoperational testing of the four C02 systems in safety related switchgear rooms is complete and accepted.The safety related rooms are poured in place concrete structures, while the nonsafety related rooms use masonary walls.During the testing of C02 systems in the safety related areas, as expected, a positive pressure occurred in the rooms in order to meet NFPA 12 concentrations.
f1 il
These pressures may exceed the design allowable values for the nonsafety related masonary walls.At this time, we are evaluating these designs.The use of the C02 system in these nonsafety related areas will be under strict administrative controls under the direct control of the Station Shift Supervisor.
In the interim, we plan to use backup hose streams and portable extinguishers for protection of these nonsafety related areas.Niagara Mohawk is continuing to pursue a resolution; however, we anticipate that the design solution could go beyond fuel load.Based upon this schedule, a Final Safety Analysis change to Sections 9.5.1 and 9A.3 is provided in Attachment 1 for Nuclear Regulatory Commission review and approval.The change removes the commitment to use C02 in the nonsafety related areas, which is still consistent with the Standard Review Plan.Further, this change does not affect the Technical Specifications.
8b07070388 860Ei261 PDR ADOCK 05000410 F PDR
~~r 4 ,~*I II I, tl 4~~~I~~4 4 4 4, I 4 4 I r C II C~'4 I Ms.Elinor G.Adensam Page 2 As soon as the design solution is implemented and testing complete, the Final Safety Analysis Report will be amended to reflect the installation of the C02 protection for nonsafety related areas.Very truly yours, C.V.Manga Senior Vice President NLR:ja 1737G Attachment xc: R.A.Gramm, NRC Resident Inspector Project File (2) m II k f'I (f C 1 L~~
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Niagara Mohawk Power Corporation
)(Nine Mile Point Unit 2)Docket No.50-410 AFFIDAVIT C.V.Man an , being duly sworn, states that he is Senior Vice President of Niagara Mohawk Power Corporation; that he is authorized on the part of said Corporation to sign and file with the Nuclear Regulatory Commission the documents attached hereto;and that all such documents are true and correct to the best of his knowledge, information and belief.Subscribed and sworn'o before me, a Notary Pgblic in and for the State of New York and County of a., this g5'ay of C 1986.Qlz5is Notary Public in and for a County, New York y Co"'iIiSlNfkMIIip-'" Hohe Public in the State of Hew Yorfr alified in Onondaga Co.No.47876&g.y Commission Extnrea March 30, 1R!c VdTZN 3H)YEN'kg AaY e:H lo ei:Q oQ ni aiHrQ gdcH VNT8'CD ail.o3 agabnaa0 nl b~l>>lcvg Ml,06 dowU touqQ o."~u;m:no3 yM ATTACHMENT 1 9.5.1.2.9 Carbon dioxide systems are provided for Category I equipment rooms and will comply with NFPA Standard 12.The low pressure carbon dioxide system consists of two 13-ton storage tanks (300 psig O'), refrigeration unit, valves, and piping that conveys C02 to fixed nozzles at individual hazards.Total flooding carbon dioxide systems are automatically actuated by cross-zoned smoke detectors.
Total flooding systems are provided for: 1.Standby switchgear rooms A and B and HPCS switchgear room in the control building.2.600V switchgear room in the reactor building.9A.3.6.5 C02 Suppression Systems (NFPA Standard 12)C02 systems are used in all safety related switchgear rooms.C02 systems comply with NFPA Standard 12 and the requirements of BTP CMEB 9.5-1, Section C.G.e.Disarming of C02 suppression systems will comply with the requirements of BTP CMEB 9.5-1, Section C.2.j.
~1~4 I~~~~~I 4~
~~Nine Mile Point Unit 2 FSAR maximum allowable..In any case, cable tray water sprinkler'ystems are provided for these areas.In calculating fire loading for the diesel generator room, a fuel oil pipe rupture has been assumed with the entire contents of the fuel oil day tank spilled on the floor.It was also considered that all of the lube oil contained in the crankcase of the engine would leak out.These assumptions resulted in a fire loading of 2 hr 24 min, which is still less than the 3-hr walls that have been.provided.Automatic pre-action water sprinkler systems have been provided for the diesel generator building.The normal switchgear building also has a high fire loading, but it is J.ess than the 3-br fire walls that have been provide.d.
Fire loading for all other areas is approximately 2 hr or less.In spite of the low fire loading, 3-hr fire walls have been provided wherever separation is required or desirable.
9A.3.1.2.5 Qetailed Fire Hazards Analysis by Building The following sections provide the detailed fire hazards analysis and a summar'y of the effects of fires in fire zones.This summary shows that the fire protection system will provide adequate ability to detect, prevent, and suppress postulated fire outbreaks in and around the plant.9A.3.1.2.5.1 Standby Gas Treatment Building Introduction The standby gas treatment (SGT)building is adjacent to the reactor building.It houses the SGTS units, reactor building ventilation supply unit, and railroad access bay, all of which are separated from each other by 3-hr fire walls and floors.Construction of the SGT building is detailed in Section 3.8.4.1.9.
Safet-Related S stems The SGTS units are the only safety-related equipment in this building.Amendment 9A.3-8


Nine Mile Point Unit 2 FSAR During normal operation, the opening of one heat vent does not result in a release of radioactivity because the exhaust fan maintains the turbine building at a negative pressure.In the event of a fire with multiple operation of the heat vents, the design objectives of 10CFR100 would not be exceeded.Fire Detection and Su ression S stems Each area of the turbine building is protected by a zoned, early warning smoke detection system arranged to alarm locally and in the control room.Automatic wet-pipe sprinkler systems are provided for protection of general areas at el 250 ft 0 in and 277 ft 6 in.A system of six automatically operated foam water sprinkler systems (foam injection is manually controlled) covers the area under the turbine generator below el 306 ft 0 in.These systems would lay a blanket of foam on the floor under the turbine generator at el 277 ft 6 in to cover any accumulation of burning or unburned oil being discharged from a leak on the machine and to flow down the sides of the machine'nd lay a blanket of foam in the condenser pit, at el 239 ft 4 in.The foam water sprinkler systems utilize open foam water sprinkler heads spaced to achieve area coverage, and the water phase is actuated automatically by heat detectors.
NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE. N,Y. 13202/TELEPHONE (315) 474-1511 t
The water supply to the systems is controlled by automatic flow control valves.The foam concentrate pump is manually started.Two equal capacity foam pumps are provided for the foam water sprinkler systems.One is on automatic standby.Two foam concentrate tanks are provided for foam water sprinker systems and foam hose reels.To assist manual firefighting around the turbine ge'nerator, the water hose stations in the vicinity of the unit are provided with piped foam concentrate so that either water or foam'streams are available at these stations.CO<hose reels are also provided.Carbon dioxide total-flooding systems are,'provided for the alternator exciter enclosure, and the lube oil reservoir.
June 25, 1986 (NMP2L 0758)
Manual local application CO<systems are provided for turbine bearings and turbine lube oil piping.Manual water Amendment 9A.3-15
Ms. Elinor G. Adensam, Director BWR  Project Directorate No. 3 U.S. Nuclear Regulatory Commission 7920  Norfolk Avenue Washington,     DC  20555


Nine Mile Point Unit 2 CESAR Manual water and CO~hose reels and portable extinguiehers are provided for backup protection.
==Dear Ms. Adensam:==
 
Re: Nine Mile Point Unit     2 Docket No. 50-410 The Nine    Mile Point Unit 2 Final Safety Analysis Report describes the Fire Protection Program. Carbon dioxide systems are installed in both safety related and nonsafety related areas as described in Sections 9.5.1. and 9A.3.
Carbon dioxide systems will comply with NFPA Standard 12 for safety related areas. Preoperational testing of the four C02 systems in safety related switchgear rooms is complete and accepted. The safety related rooms are poured in place concrete structures, while the nonsafety related rooms use masonary walls. During the testing of C02 systems in the safety related areas, as expected, a positive pressure occurred in the rooms in order to meet NFPA 12 concentrations.      These pressures may exceed the design allowable values for the nonsafety related masonary walls. At this time, we are evaluating these designs. The use of the C02 system in these nonsafety related areas will be under strict administrative controls under the direct control of the Station Shift Supervisor. In the interim, we plan to use backup hose streams and portable extinguishers for protection of these nonsafety related areas.      Niagara Mohawk is continuing to pursue a resolution; however,    we  anticipate that the design solution could go beyond fuel load.
Based upon this schedule, a Final Safety Analysis change to Sections 9.5.1 and 9A.3 is provided in Attachment 1 for Nuclear Regulatory Commission review and approval. The change removes the commitment to use C02 in the nonsafety related areas, which is      still  consistent with the Standard Review Plan.
Further, this change does not affect the Technical Specifications.
8b07070388 860Ei261 PDR    ADOCK 05000410 F                  PDR
 
                                                              ~  ~
r 4
                      ~
                    ,
* I II I, tl 4
~ ~              ~ I    ~ ~ 4 4
4 4,  I r
C 4 4    I                            II C
    ~    '
4 I
 
Ms. Elinor G. Adensam Page 2 As soon as the design solution is implemented and testing complete, the Final Safety Analysis Report will be amended to reflect the installation of the C02 protection for nonsafety related areas.
Very truly yours, C. V. Manga Senior Vice President NLR:ja 1737G Attachment xc:  R. A. Gramm, NRC Resident Inspector Project File (2)
 
m II
              'I k
f      (
f C
1 L
                    ~ ~
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Niagara Mohawk Power Corporation                  )                    Docket No. 50-410 (Nine Mile Point Unit 2)
AFFIDAVIT C. V. Man an                            , being duly sworn, states    that he is Senior Vice President of Niagara Mohawk Power Corporation; that he is authorized on the part of said Corporation to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information and belief.
Subscribed and sworn'o before me, York and County of                            a.,    a  Notary Pgblic in and this g5'ay    of  C for the State of New 1986.
Qlz5is Notary Public in and for a    County, New York y Co"'iIiSlNfkMIIip-'"
Hohe Public in the State of Hew Yorfr alified in Onondaga Co. No. 47876&g.
y Commission Extnrea March 30, 1R!c
 
VdTZN 3H)YEN'kg AaY e:H lo ei:Q oQ ni aiHrQ gdcH VNT8'CD ail .o3 agabnaa0 nl b~l>>lcvg Ml,06 dowU touqQ o."~u;m:no3      yM
 
ATTACHMENT  1 9.5.1.2.9 Carbon dioxide systems are provided for Category I equipment rooms and will comply with NFPA Standard 12. The low pressure carbon dioxide system consists of two 13-ton storage tanks (300 psig O'), refrigeration unit, valves, and piping that conveys C02 to fixed nozzles at individual hazards. Total flooding carbon dioxide systems are automatically actuated by cross-zoned smoke detectors. Total flooding systems are provided for:
: 1. Standby switchgear rooms A and  B  and HPCS  switchgear room in the control building.
: 2. 600V  switchgear room in the reactor building.
9A.3.6.5  C02  Suppression  Systems (NFPA  Standard 12)
C02 systems are used in all safety related switchgear rooms.      C02 systems comply with NFPA Standard 12 and the requirements of BTP CMEB 9.5-1, Section C.G.e. Disarming of C02 suppression systems will comply with the requirements of  BTP CMEB  9.5-1, Section C.2.j.
 
                  ~  1 ~
4 I
                ~  ~
~ ~ ~    I 4 ~
 
                    ~                              ~
Nine Mile Point Unit    2 FSAR maximum      allowable are provided
                        ..In  any case, cable for these areas.
tray water sprinkler 'ystems In calculating fire loading for the diesel generator room, a fuel oil pipe rupture has been assumed with the entire contents of the fuel oil day tank spilled on the floor. It was also considered that all of the lube oil contained            in the      crankcase      of the engine would leak out. These assumptions resulted in a fire loading of 2 hr 24 min, which is still less than the 3-hr walls that have been. provided.
Automatic pre-action water sprinkler systems have been provided for the diesel generator building.
The normal switchgear building also has a high fire loading, but  it provide.d.
is J.ess than the 3-br fire walls that have been Fire loading for all other areas is approximately 2 hr or less. In spite of the low fire loading, 3-hr fire walls have been provided wherever separation                is required or desirable.
9A.3.1.2.5 Qetailed Fire Hazards Analysis by Building The following sections            provide the detailed fire hazards analysis and a summar'y of the effects of fires in fire zones.      This summary shows that the fire protection system will provide adequate ability to detect, prevent, and suppress      postulated fire outbreaks in and around the plant.
9A. 3. 1. 2. 5. 1 Standby Gas Treatment Building Introduction The standby gas treatment (SGT) building is adjacent to the reactor building.          It houses the SGTS units, reactor building ventilation supply unit, and railroad access bay, all of which are separated from each other by 3-hr fire walls and floors.            Construction of the SGT building is detailed in Section 3.8.4.1.9.
Safet -Related      S  stems The SGTS    units are the only safety-related equipment in this building.
Amendment                          9A.3-8
 
Nine Mile Point Unit    2 FSAR During normal operation, the opening of one heat vent does not result in a release of radioactivity because the exhaust fan maintains the turbine building at a negative pressure.
In the event of a fire with multiple operation of the heat vents, the design objectives of 10CFR100 would not be exceeded.
Fire Detection and Su ression S stems Each area      of the turbine building is protected by a zoned, early warning smoke detection system arranged to alarm locally and in the control room.
Automatic      wet-pipe sprinkler    systems    are  provided  for protection      of general areas      at    el    250  ft 0  in  and 277  ft 6  in.
A system of six automatically operated foam water sprinkler systems (foam injection is manually controlled) covers the area under the turbine generator below el 306 ft 0 in.
These systems would lay a blanket of foam on the floor under the      turbine generator at el 277 ft 6 in to cover any accumulation of burning or unburned oil being discharged from a leak on the machine and to flow down the sides of the machine'nd lay a blanket of foam in the condenser pit, at el  239  ft 4  in.
The    foam    water sprinkler systems utilize open foam water sprinkler    heads spaced to achieve area coverage,          and the water phase is actuated automatically by heat detectors.
The water supply to the systems is controlled by automatic flow control valves. The foam concentrate pump is manually started. Two equal capacity foam pumps are provided for the foam water sprinkler systems.        One is on automatic standby.
Two foam concentrate      tanks are provided for foam water sprinker systems and foam hose reels.
To    assist manual firefighting around the turbine ge'nerator, the water hose stations in the vicinity of the unit are provided with piped foam concentrate so that either water or foam 'streams are available at these          stations.      CO<  hose reels are also provided.
Carbon    dioxide total- flooding systems are,'provided for the alternator exciter enclosure, and the lube oil reservoir.
Manual local application CO< systems            are provided for turbine bearings and    turbine  lube  oil  piping. Manual water Amendment                      9A.3-15
 
Nine Mile Point Unit        2 CESAR Manual     water and CO~ hose reels and portable extinguiehers are provided for backup protection.
Drains are discuss'ed in Section 9A.3.5.1.12.
Drains are discuss'ed in Section 9A.3.5.1.12.
9A.3.1, 2.5.9 Auxiliary Boiler Building Yntroductian The auxiliary boiler building is a single-story structure with metal siding walls, I.t houses two electric boilers which are utilized during startup and shutdown, It has no interior walls and contains only 5mall amounts of combu s tib le s, The ventilation system consists of outside aix'ntake louvers and power roof exhaust fans.Safet-Related E i ment The auxiliary boiler building does not contain any safety-related equipment.
9A. 3. 1, 2. 5. 9   Auxiliary Boiler Building Yntroductian The   auxiliary boiler building is a single-story structure with metal siding walls, I.t houses two electric boilers which are utilized during startup and shutdown, It has no interior walls and contains only 5mall amounts of combu s tib le s, The ventilation system         consists of outside aix'ntake louvers and power roof exhaust fans.
Post Fire Anal sis There is no equipment in this building required for safe plant shutdown.Radioactive Release Anal sis A fire in the aukiliary boiler building will not result in excessive leakage of airborne radioactivity; t he desf gn objectives of 10CFR100 would not be exceeded.Pire Detection and Su ression The bui lding i s px ot ected by an early wax ning, smoke detection system axxanged to alarm and..annunciate in the control room.Since the fixe hazards analysis indicates a vexy low quantity of combustib'les and since the area is easily accessible for manual firefighting, fixed protection has not been provided.Mater hose xeels and portable extinguishers are provided for complete building coverage.O'A.3 22~Ofgty<igloo 0~~llf)1%'t I V+~~Sl~  
Safet -Related       E i ment The     auxiliary       boiler   building       does       not     contain     any safety-related equipment.
Post Fire Anal sis There     is   no   equipment in this building required for                     safe plant shutdown.
Radioactive Release Anal sis A   fire in the aukiliary boiler building will not result in excessive leakage of airborne radioactivity; t he desf gn objectives of 10CFR100 would not be exceeded.
Pire Detection and Su ression The bui lding i s px ot ected by an early wax ning, smoke detection system axxanged to alarm and .. annunciate in the control room.
Since the fixe hazards analysis indicates a vexy low quantity of combustib'les and since the area is easily accessible for manual firefighting, fixed protection has not been provided. Mater hose xeels and portable extinguishers are provided       for complete building coverage.
O'A.3 22
                                      ~ Ofgty <igloo 0 ~ ~ llf)1%'t IV +~ ~ Sl ~
 
                      'Nine Mile Point Unit  2 FSAR 9A.3.7.4    Plant Computer Room The plant computer is not safety related; to shut down the reactor or limit the it  is not required
                                                      ~
release      of radioactivity to the environment.            The computer room is located within the control room pressure boundary on the relay room elevation.          The computer room walls have glass panels and are not fire rated. The relay room elevation of the control room pressure boundary is separated from all other areas by 3-hr barriers. A smoke detection system that alarms in the control room and an automatic total-flooding Halon suppression system have been provided in the computer room.      Manual COz and water hose reels and portable extinguishers are available for backup.
9A.3.7.5 Switchgear Rooms Rooms with safety re'lated switchgear          are protected with automatic total- flooding- COz extinguishing systems.          Manual COz    and water hose        reels and portable extinguishers are available for backup            protection. Detection      systems annunciate in the control room and alarm locally, Three-hour walls separate switchgear rooms from each other and from the remainder of the plant. Manually actuated smoke removal capability is provided for              normal    switchgear building and the control building switchgear rooms. For further details, refer to Section 9.4.              Smoke      removal  .
capability would be provided through the use of portable fans  if required for other switchgear rooms.
9A.3.7.6 Remote Safety-Related Panels Unit    2  has  two    remote shutdown rooms separated    from each other    and  other plant areas by 3-hr barriers. An automatic fire detection system annunciates in the control room and alarms locally.; Manual COz and water hose reels and portable extinguishers have been provided outside this room.
9A'.3.7.7 Safety-Related Battery Rooms Battery rooms are separated from each other and from the remainder of the plant by 3-hr fire walls, which are in excess of the fire load calculated in the fire hazards
                                              =
analysis. All penetrations have a 3-hr rating.
Separate      ventilation systems have been provided for battery rooms to limit hydrogen buildup to 2 percent maximum.                Fan failure is annunciated in the control room. Ross of flow initiates the redundant fan and prints out on the computer.
Amendment                        9A.3-56
 
0 4 Nine Nile Point    Vnit 2 PSAR TABLE  9A.3-6 THNBINE BBILDING Figure  Pire Area (FA) or                                          safety-                                                                                      Pire Nom    Pire Sub Area (FSA)            Pire  Zone                  Related                          Fire Hazard                                    Fire        Barrier Area    Equipment                Combus-            Quantitv            Total Btu      Loading      8eq u ired    Detection      Extinguishing Number                                  in Area  Name            tible        Lb          Gal Btu/Lb  (thousands'I                              Svstem        System 9A.3-6  FA 84                740 XL    El 277r-6<<            1, 720 None      Nisc eguip    Insul.            706        12,000      0, 472      220, 370  2. 3  hr      Smoke Turbine building                      Cable  trays  Insul.        25,346          12, 000  304 L= 152                            detection normal switchgear                                                                              312, 624                              Crer S room west                                                                                                                            zoned 9A.3-6  FA 83                726 XL    El 277'-6>>          2, 300  None      Nisc equip    Insul.            979        12,000      11,740      258,740  3.2 hr        Smoke Turbine building                      Notor contcol                                                                                  detection normal switchgear                        centers      Fiber.            402        10, 000      7,236                                ccoss-room east                              Cable  trays  Insul.        48,010          12,000    576 120                                zoned 595, 104 9A  3-6 FA 50                725  NZ  El 288'-6>>          5, 160  None      Bise equip    Insu1.            156        12,000      1, 072      24,752  19 min        Smoko Ventilation    coom                    Motors        Insul.              36        10,000            360                            detectiqn l'able l ra y" lnsul..        10,457          12, 000    125 L. rl04 127, 716
,9A.3-6  FA 50                722  NZ    El 277'-6>>          4,840  None      Notors        Insul.              72        10,000            720      15, 947 12  min      Smoke Condensate  demin-                    Cable  trays  Insul.          6,372          12,000      76 L 464                            detection eralizer                                                                                        77, 104 9A.3-6  FA 50                721 NZ    El 280'-6<<          2,345  None      Notors        Insul.                3        10, 000            30    26,900  20 min        smoke Off-gas room                          Bise equip    Insul.              208        12, 000      2,496                              detoction Cable trays    Insul.          5r062        12,000      60 744 63, 270 9A.3-6  FA 50                723HZ (A)  El 277 r 6>>        4,050  Ncne      Notocs        Insul.                1      10, 000            10    12,3QQ  10  min      smoke 724HZ (8)  Heater bay  A  room 4,050            Cable trays    Insul.          4,152          12,000      49 824                                detection 7 25NZ (C) (similar for        4050                                                                      49,034 heater hays 8  and C) 1 of  5
 
Nine Nile Point Unit    2 PSAR TABLE  9A.3-9 (Cont)
Figure  Fire Area (Fh) or                                        Safety-No.      Fire Sub brea (FSAB)              Pire  Zone            Belated                                                                                  Fire Area  Equipment                    Fire Hazard                                    Fire      Barrier Name                      in Area<<v            Combus-            Ouantitv    Btu/Lb  Total Btus  Loading      Bequired    Detection      Ertinguj shing Name        tible        Lb          Gal        (thousands'I fB~tu  ftvL              System          Svstem 9A.3-7  PA  59              951 NM  El 309'-0"          6, 535 None      Motors      Insul.        10              10,000      100      15          Negli gi ble Smoke          Automatic Truck loading    6                                                                                                            detection      sprinkler  system MSS  storage 9A.3-5  PA 70                905 NM  El  261'u          4,750  None      Motors      Insul.                          10,000      20      4          Negligible  Smoke          Automatic Decon area 6                                                                                                                  detect io n    sprinkler  system dirty    vorkshop 9A.3-6  PA 70                395 XL  El 279'-0"          2, 250 None      Cables      Insul.        8436            12,000  101232      44992      34 min      Smoke Radvaste svitch-                                                                                                              detection gear room 9A. 3-6  PA 70                390 XG 8 El 279 -Ou
                                                ~
2,500  None      Cables      Insul.        10350            12,000  124200      49680      38 min      Smoke          Total floodlnn 907 NZ  Badvaste    control                                                                                                            detection      Union room and 9A. 3-7  FA 70                903  NZ  El 306'Ou          4,750  None      Misc equip Insul.        21              10, 000 210                      Negligible  Smoke Decon bldg                                                                                                                    detection HVAC    equipment room 9 A. 3-6  PA 58              904  NZ  El LMS 287  'u evaporators 650    None    No combus-tibles                                                                                    Smoke detection
                                                                                                                                                                                          )TI 5LPERmaZ
                                                                                                                                                                                        ,CABD Amendment            3  of 3


'Nine Mile Point Unit 2 FSAR 9A.3.7.4 Plant Computer Room The plant computer is not safety related;it is not required to shut down the reactor or limit the~release of radioactivity to the environment.
Nine Nile Point Unit     2 FSAR TABLE 9A. 3-10 NORNAL SMITCHGEAR    BUILDING Pire Area (PA) or                                       Safety-                                                                                        Pire Figure No.      Pire Sub Area gFSA)             Pire Zone               Belated                          Fire Hazard                                      Fire      Barrier Area     Equipment               Combus-             Ouantitv    Btu/Lb Total Btu       Loading     Required  Detection       Extinguishing Number  Name                         in Area Name           tible           Lh          Gal         tthousandsl    gBt~uft~z fhrgmin      System         S Istem 9 A. 3-4 FA 51               601 XL El 237',715 General area vest None     N isc. equip.
The computer room is located within the control room pressure boundary on the relay room elevation.
Cable trays Insul.
The computer room walls have glass panels and are not fire rated.The relay room elevation of the control room pressure boundary is separated from all other areas by 3-hr barriers.A smoke detection system that alarms in the control room and an automatic total-flooding Halon suppression system have been provided in the computer room.Manual COz and water hose reels and portable extinguishers are available for backup.9A.3.7.5 Switchgear Rooms Rooms with safety re'lated switchgear are protected with automatic total-flooding-COz extinguishing systems.Manual COz and water hose reels and portable extinguishers are available for backup protection.
Insul.
Detection systems annunciate in the control room and alarm locally, Three-hour walls separate switchgear rooms from each other and from the remainder of the plant.Manually actuated smoke removal capability is provided for normal switchgear building and the control building switchgear rooms.For further details, refer to Section 9.4.Smoke removal.capability would be provided through the use of portable fans if required for other switchgear rooms.9A.3.7.6 Remote Safety-Related Panels Unit 2 has two remote shutdown rooms separated from each other and other plant areas by 3-hr barriers.An automatic fire detection system annunciates in the control room and alarms locally.;Manual COz and water hose reels and portable extinguishers have been provided outside this room.9A'.3.7.7 Safety-Related Battery Rooms Battery rooms are separated from each other and from the remainder of the plant by 3-hr fire walls, which are in excess of the fire load calculated
797 24, 281 12,000 12, 000 9, 564 291 L 372 110,842 1.4 hp       Smoke detection 300,936                                cross-zoned 9A   3-4 PA 52               602 XL El 2371 0<<         4,590     None     Cable trays In sul.         39,838           12,000 478,056          105,060  1.3 hr        Smoke General area east                      Nisc. equip. Insul.              341          12, 000   4,092                                detection Notors        Insul.                  7        12, 000         70                              cross-482,218                                zoned 9 A- 3-4 FA 53              603  NZ El 237'-0<<        830    . None      Batteries    Styrene            1,964          18,000    35,352         111,600 1.4 hr       Smoke 1A  battery  room                      Cable trays  Insul.           4,773          12,000    57 276                                detection 92,628 9A 3-4   FA 53               603 NZ El 237'-0<<         830       None     Batteries     Styren e         1,964         18,000   35,352         127,420   1.6 hr       Smoke 18 battery  room                      Cable trays  Insul.            5,867          12, 000  70-L 404                              detection 105,756 9A. 3-4   FA 53             603 NZ El 2371 0<<       220       None     Cable   trays Insul.             1,736         12,000   20,832         94,695   1. 2 hr     Smoke Room  4A                                                                                                                              detectxon 9A. 3-4   FA 53               603 NZ El 237'-0<<         220       None     Cable  trays Insul.            1,736          12,000    20,832          94,695  1. 2  hr    Saoke Room  4B                                                                                                                              detection 9A  35  PA 78              612 XL El 261'-0<<         4,820   None     Bise. equip. Insul.             6,522          12,000  782,264          163,675  2.1 hr      Smoke          Total flooding General area vest                      Cable trays   Insul.           58,870           12, 000 706, 440                               detection      COz Notor control                                                                                  cross-centers    Piher.                233        18,000       L 194                             zoned 788,898 9A. 3-5 PA 79              613 XL  El 261'-0<<        4, 590    None    Bise. equip. Insul.            4,315          12, 000   51, 780        164,220   2.1 hr       Smoke           Total flooding General area east                    Notcr control                                                                                  detection   ~
=in the fire hazards analysis.All penetrations have a 3-hr rating.Separate ventilation systems have been provided for battery rooms to limit hydrogen buildup to 2 percent maximum.Fan failure is annunciated in the control room.Ross of flow initiates the redundant fan and prints out on the computer.Amendment 9A.3-56 0 4 Nine Nile Point Vnit 2 PSAR TABLE 9A.3-6 THNBINE BBILDING Figure Nom 9A.3-6 FA 84 Pire Area (FA)or Pire Sub Area (FSA)Number 740 XL Pire Zone El 277r-6<<Turbine building normal switchgear room west Area 1, 720 safety-Related Equipment in Area None Name Nisc eguip Cable trays Insul.Insul.706 25,346 Fire Hazard Combus-Quantitv tible Lb Gal Btu/Lb 12,000 12, 000 Total Btu (thousands'I 0, 472 304 152 L=-312, 624 Fire Loading Pire Barrier 8eq u ired 220, 370 2.3 hr Detection Svstem Smoke detection Crer S zoned Extinguishing System 9A.3-6 FA 83 726 XL El 277'-6>>Turbine building normal switchgear room east 2, 300 None Nisc equip Notor contcol centers Cable trays Insul.Fiber.Insul.979 402 48,010 12,000 10, 000 12,000 11,740 7,236 576 120 595, 104 258,740 3.2 hr Smoke detection ccoss-zoned 9A 3-6 FA 50 725 NZ El 288'-6>>Ventilation coom 5, 160 None Bise equip Motors l'able l ra y" Insu1.Insul.lnsul..156 36 10,457 12,000 10,000 12, 000 1, 072 360 125 rl04 L.127, 716 24,752 19 min Smoko detectiqn ,9A.3-6 FA 50 9A.3-6 FA 50 9A.3-6 FA 50 722 NZ 721 NZ 723HZ (A)724HZ (8)7 25NZ (C)El 277'-6>>Condensate demin-eralizer El 280'-6<<Off-gas room El 277 r-6>>Heater bay A room (similar for heater hays 8 and C)2,345 None 4,050 4,050 4050 Ncne 4,840 None Notors Cable trays Notors Bise equip Cable trays Notocs Cable trays Insul.Insul.Insul.Insul.Insul.Insul.Insul.72 6,372 3 208 5r062 1 4,152 10,000 12,000 10, 000 12, 000 12,000 10, 000 12,000 30 2,496 60 744 63, 270 10 49 824 49,034 720 76 464 L-77, 104 15, 947 12 min 26,900 20 min 12,3QQ 10 min Smoke detection smoke detoction smoke detection 1 of 5 Nine Nile Point Unit 2 PSAR TABLE 9A.3-9 (Cont)Figure No.Fire Area (Fh)or Fire Sub brea (FSAB)Pire Zone Area Name Safety-Belated Equipment in Area<<v Name Combus-tible Fire Hazard Ouantitv Lb Gal Btu/Lb Total Btus (thousands'I Fire Loading fB~tu ftvL Fire Barrier Bequired Detection System Ertinguj shing Svstem 9A.3-7 PA 59 951 NM El 309'-0" 6, 535 Truck loading 6 MSS storage None Motors Insul.10 10,000 100 15 Negli gi ble Smoke detection Automatic sprinkler system 9A.3-5 PA 70 905 NM El 261'u Decon area 6 dirty vorkshop 4,750 None Motors Insul.10,000 20 4 Negligible Smoke detect io n Automatic sprinkler system 9A.3-6 PA 70 395 XL El 279'-0" Radvaste svitch-gear room 2, 250 None Cables Insul.8436 12,000 101232 44992 34 min Smoke detection 9A.3-6 PA 70 390 XG 8 El 279~-Ou 907 NZ Badvaste control room and 2,500 None Cables Insul.10350 12,000 124200 49680 38 min Smoke Total floodlnn detection Union 9A.3-7 FA 70 903 NZ El 306'Ou Decon bldg HVAC equipment room 4,750 None Misc equip Insul.21 10, 000 210 Negligible Smoke detection 9 A.3-6 PA 58 904 NZ El 287'u LMS evaporators 650 None No combus-tibles Smoke detection)TI 5LPERmaZ ,CABD Amendment 3 of 3 Nine Nile Point Unit 2 FSAR TABLE 9A.3-10 NORNAL SMITCHGEAR BUILDING Figure No.9 A.3-4 FA 51 Pire Area (PA)or Pire Sub Area gFSA)Number Pire Zone Area Name 601 XL El 237',715 General area vest Safety-Belated Equipment in Area None Name N isc.equip.Cable trays Combus-tible Insul.Insul.Fire Hazard Ouantitv Lh Gal 797 24, 281 Btu/Lb 12,000 12, 000 Total Btu tthousandsl 9, 564 291 372 L 300,936 110,842 Fire Loading gBt~uft~z Pire Barrier Required fhrgmin 1.4 hp Detection System Smoke detection cross-zoned Extinguishing S stem I 9A 3-4 PA 52 9 A-3-4 FA 53 603 NZ El 237'-0<<1A battery room 830.None 602 XL El 2371 0<<4,590 None General area east Cable trays Nisc.equip.Notors Batteries Cable trays In sul.Insul.Insul.Styrene Insul.39,838 341 7 1,964 4,773 12,000 12, 000 12, 000 18,000 12,000 478,056 4,092 70 482,218 35,352 57 276 92,628 105,060 111,600 1.3 hr 1.4 hr Smoke detection cross-zoned Smoke detection 9A 3-4 FA 53 603 NZ El 237'-0<<18 battery room 830 None Batteries Cable trays Styren e Insul.1,964 5,867 18,000 12, 000 35,352 70 404-L 105,756 127,420 1.6 hr Smoke detection 9A.3-4 FA 53 603 NZ El 2371 0<<Room 4A 220 None Cable trays Insul.1,736 12,000 20,832 94,695 1.2 hr Smoke detectxon 9A.3-4 FA 53 9A 35 PA 78 9A.3-5 PA 79 603 NZ El 237'-0<<Room 4B 220 None 613 XL El 261'-0<<4, 590 None General area east 612 XL El 261'-0<<4,820 None General area vest Cable trays Bise.equip.Cable trays Notor control centers Bise.equip.Notcr control centers Cable trays Insul.Insul.Insul.Piher.Insul.Fiber.Insul.1,736 6,522 58,870 233 4,315 297 58,053 12,000 12, 000 782,264 706, 440 18,000 194 L 788,898 12, 000 51, 780 18,000 12, 000 5, 346 696 636 753, 762 12,000 20,832 94,695 1.2 hr 163,675 2.1 hr 164,220 2.1 hr Saoke detection Smoke detection cross-zoned Smoke detection cross-zoned Total flooding COz Total flooding~COx Amendment 1 of 2~gg-c33}}
COx centers    Fiber.                297        18,000      5, 346                              cross-Cable trays  Insul.          58,053          12, 000 696 636                                zoned 753, 762 Amendment                 1 of 2
                                                                                                                                                                                      ~           gg-c33}}

Revision as of 22:49, 21 October 2019

Forwards Changes to FSAR Sections 9.5.1 & 9A.3 Re Fire Protection Program Carbon Dioxide Sys,For Approval.Changes Remove Commitment to Use CO2 in nonsafety-related Areas.Fsar Will Be Amended in Future.W/Three Oversize Encls
ML18038A176
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/26/1986
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Adensam E
Office of Nuclear Reactor Regulation
References
(NMP2L-0758), (NMP2L-758), NUDOCS 8607070388
Download: ML18038A176 (21)


Text

REQUL ORY INFOR~)1ATION DISTRIBUTE BYBTEN (RIDB)

'CCESSION NBR: 8607070388 DQC. DATE: 86/06/26 NOTARIZED: YEB DOCKET 0 FACIL: 50-410 Nine Nile Point Nuclear Station> Unit 2> Niagara aloha 05000410 AUTH. NANE AUTHOR AFFILIATION NANGAN> C. V. Niagav a Nohawl: Power Cov p.

RECIP NANE RECIPIENT AFFILIATION ADENSAN> E. Q. BllR Pv object Div ectov ate 3

SUBJECT:

Forwards changes to FBAR Sections 9. 5. 1 8c 9A. 3 v'e f iv e pv otection pv ogv'am cav bon dioxide sos> fov appl oYal. Changes v emove c ommi tment to use CQ2 in nonsa f et'-related av'eas. FBAR will be amended in future. lJ/three oversize encls.

DISTRIBUTION CODE: B002D COPIES RECEIVED: LTR ENCL SI ZE:

TITLE: I icensing Submittal: Fire Protection NOTES:

REC IP lENT CQP IEB RECIP I ENT COP IES ID CODE/MANE LTTR ENCL ID CODE/NANE LTTR ENCL BWR ADTS BWR PD3 LA 1 0 0/JR PD3 PD 1 1 HAUQHEY> N 01 1 1 INTERNAL: ACRB 10 6 6 ADN/LFNB 1 0 ELD/HDB3 1 0 NRR STANQ> J 3 3 04 1 RQNi 1 EXTERNAL LPDR 03 1 'RC PDR 02 NSIC 05 1 1 TOTAL NUNBER OF COPIES REQUIRED: LTTR 20 ENCL 17

0 S

f1 il

NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE. N,Y. 13202/TELEPHONE (315) 474-1511 t

June 25, 1986 (NMP2L 0758)

Ms. Elinor G. Adensam, Director BWR Project Directorate No. 3 U.S. Nuclear Regulatory Commission 7920 Norfolk Avenue Washington, DC 20555

Dear Ms. Adensam:

Re: Nine Mile Point Unit 2 Docket No. 50-410 The Nine Mile Point Unit 2 Final Safety Analysis Report describes the Fire Protection Program. Carbon dioxide systems are installed in both safety related and nonsafety related areas as described in Sections 9.5.1. and 9A.3.

Carbon dioxide systems will comply with NFPA Standard 12 for safety related areas. Preoperational testing of the four C02 systems in safety related switchgear rooms is complete and accepted. The safety related rooms are poured in place concrete structures, while the nonsafety related rooms use masonary walls. During the testing of C02 systems in the safety related areas, as expected, a positive pressure occurred in the rooms in order to meet NFPA 12 concentrations. These pressures may exceed the design allowable values for the nonsafety related masonary walls. At this time, we are evaluating these designs. The use of the C02 system in these nonsafety related areas will be under strict administrative controls under the direct control of the Station Shift Supervisor. In the interim, we plan to use backup hose streams and portable extinguishers for protection of these nonsafety related areas. Niagara Mohawk is continuing to pursue a resolution; however, we anticipate that the design solution could go beyond fuel load.

Based upon this schedule, a Final Safety Analysis change to Sections 9.5.1 and 9A.3 is provided in Attachment 1 for Nuclear Regulatory Commission review and approval. The change removes the commitment to use C02 in the nonsafety related areas, which is still consistent with the Standard Review Plan.

Further, this change does not affect the Technical Specifications.

8b07070388 860Ei261 PDR ADOCK 05000410 F PDR

~ ~

r 4

~

,

  • I II I, tl 4

~ ~ ~ I ~ ~ 4 4

4 4, I r

C 4 4 I II C

~ '

4 I

Ms. Elinor G. Adensam Page 2 As soon as the design solution is implemented and testing complete, the Final Safety Analysis Report will be amended to reflect the installation of the C02 protection for nonsafety related areas.

Very truly yours, C. V. Manga Senior Vice President NLR:ja 1737G Attachment xc: R. A. Gramm, NRC Resident Inspector Project File (2)

m II

'I k

f (

f C

1 L

~ ~

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Niagara Mohawk Power Corporation ) Docket No. 50-410 (Nine Mile Point Unit 2)

AFFIDAVIT C. V. Man an , being duly sworn, states that he is Senior Vice President of Niagara Mohawk Power Corporation; that he is authorized on the part of said Corporation to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true and correct to the best of his knowledge, information and belief.

Subscribed and sworn'o before me, York and County of a., a Notary Pgblic in and this g5'ay of C for the State of New 1986.

Qlz5is Notary Public in and for a County, New York y Co"'iIiSlNfkMIIip-'"

Hohe Public in the State of Hew Yorfr alified in Onondaga Co. No. 47876&g.

y Commission Extnrea March 30, 1R!c

VdTZN 3H)YEN'kg AaY e:H lo ei:Q oQ ni aiHrQ gdcH VNT8'CD ail .o3 agabnaa0 nl b~l>>lcvg Ml,06 dowU touqQ o."~u;m:no3 yM

ATTACHMENT 1 9.5.1.2.9 Carbon dioxide systems are provided for Category I equipment rooms and will comply with NFPA Standard 12. The low pressure carbon dioxide system consists of two 13-ton storage tanks (300 psig O'), refrigeration unit, valves, and piping that conveys C02 to fixed nozzles at individual hazards. Total flooding carbon dioxide systems are automatically actuated by cross-zoned smoke detectors. Total flooding systems are provided for:

1. Standby switchgear rooms A and B and HPCS switchgear room in the control building.
2. 600V switchgear room in the reactor building.

9A.3.6.5 C02 Suppression Systems (NFPA Standard 12)

C02 systems are used in all safety related switchgear rooms. C02 systems comply with NFPA Standard 12 and the requirements of BTP CMEB 9.5-1, Section C.G.e. Disarming of C02 suppression systems will comply with the requirements of BTP CMEB 9.5-1, Section C.2.j.

~ 1 ~

4 I

~ ~

~ ~ ~ I 4 ~

~ ~

Nine Mile Point Unit 2 FSAR maximum allowable are provided

..In any case, cable for these areas.

tray water sprinkler 'ystems In calculating fire loading for the diesel generator room, a fuel oil pipe rupture has been assumed with the entire contents of the fuel oil day tank spilled on the floor. It was also considered that all of the lube oil contained in the crankcase of the engine would leak out. These assumptions resulted in a fire loading of 2 hr 24 min, which is still less than the 3-hr walls that have been. provided.

Automatic pre-action water sprinkler systems have been provided for the diesel generator building.

The normal switchgear building also has a high fire loading, but it provide.d.

is J.ess than the 3-br fire walls that have been Fire loading for all other areas is approximately 2 hr or less. In spite of the low fire loading, 3-hr fire walls have been provided wherever separation is required or desirable.

9A.3.1.2.5 Qetailed Fire Hazards Analysis by Building The following sections provide the detailed fire hazards analysis and a summar'y of the effects of fires in fire zones. This summary shows that the fire protection system will provide adequate ability to detect, prevent, and suppress postulated fire outbreaks in and around the plant.

9A. 3. 1. 2. 5. 1 Standby Gas Treatment Building Introduction The standby gas treatment (SGT) building is adjacent to the reactor building. It houses the SGTS units, reactor building ventilation supply unit, and railroad access bay, all of which are separated from each other by 3-hr fire walls and floors. Construction of the SGT building is detailed in Section 3.8.4.1.9.

Safet -Related S stems The SGTS units are the only safety-related equipment in this building.

Amendment 9A.3-8

Nine Mile Point Unit 2 FSAR During normal operation, the opening of one heat vent does not result in a release of radioactivity because the exhaust fan maintains the turbine building at a negative pressure.

In the event of a fire with multiple operation of the heat vents, the design objectives of 10CFR100 would not be exceeded.

Fire Detection and Su ression S stems Each area of the turbine building is protected by a zoned, early warning smoke detection system arranged to alarm locally and in the control room.

Automatic wet-pipe sprinkler systems are provided for protection of general areas at el 250 ft 0 in and 277 ft 6 in.

A system of six automatically operated foam water sprinkler systems (foam injection is manually controlled) covers the area under the turbine generator below el 306 ft 0 in.

These systems would lay a blanket of foam on the floor under the turbine generator at el 277 ft 6 in to cover any accumulation of burning or unburned oil being discharged from a leak on the machine and to flow down the sides of the machine'nd lay a blanket of foam in the condenser pit, at el 239 ft 4 in.

The foam water sprinkler systems utilize open foam water sprinkler heads spaced to achieve area coverage, and the water phase is actuated automatically by heat detectors.

The water supply to the systems is controlled by automatic flow control valves. The foam concentrate pump is manually started. Two equal capacity foam pumps are provided for the foam water sprinkler systems. One is on automatic standby.

Two foam concentrate tanks are provided for foam water sprinker systems and foam hose reels.

To assist manual firefighting around the turbine ge'nerator, the water hose stations in the vicinity of the unit are provided with piped foam concentrate so that either water or foam 'streams are available at these stations. CO< hose reels are also provided.

Carbon dioxide total- flooding systems are,'provided for the alternator exciter enclosure, and the lube oil reservoir.

Manual local application CO< systems are provided for turbine bearings and turbine lube oil piping. Manual water Amendment 9A.3-15

Nine Mile Point Unit 2 CESAR Manual water and CO~ hose reels and portable extinguiehers are provided for backup protection.

Drains are discuss'ed in Section 9A.3.5.1.12.

9A. 3. 1, 2. 5. 9 Auxiliary Boiler Building Yntroductian The auxiliary boiler building is a single-story structure with metal siding walls, I.t houses two electric boilers which are utilized during startup and shutdown, It has no interior walls and contains only 5mall amounts of combu s tib le s, The ventilation system consists of outside aix'ntake louvers and power roof exhaust fans.

Safet -Related E i ment The auxiliary boiler building does not contain any safety-related equipment.

Post Fire Anal sis There is no equipment in this building required for safe plant shutdown.

Radioactive Release Anal sis A fire in the aukiliary boiler building will not result in excessive leakage of airborne radioactivity; t he desf gn objectives of 10CFR100 would not be exceeded.

Pire Detection and Su ression The bui lding i s px ot ected by an early wax ning, smoke detection system axxanged to alarm and .. annunciate in the control room.

Since the fixe hazards analysis indicates a vexy low quantity of combustib'les and since the area is easily accessible for manual firefighting, fixed protection has not been provided. Mater hose xeels and portable extinguishers are provided for complete building coverage.

O'A.3 22

~ Ofgty <igloo 0 ~ ~ llf)1%'t IV +~ ~ Sl ~

'Nine Mile Point Unit 2 FSAR 9A.3.7.4 Plant Computer Room The plant computer is not safety related; to shut down the reactor or limit the it is not required

~

release of radioactivity to the environment. The computer room is located within the control room pressure boundary on the relay room elevation. The computer room walls have glass panels and are not fire rated. The relay room elevation of the control room pressure boundary is separated from all other areas by 3-hr barriers. A smoke detection system that alarms in the control room and an automatic total-flooding Halon suppression system have been provided in the computer room. Manual COz and water hose reels and portable extinguishers are available for backup.

9A.3.7.5 Switchgear Rooms Rooms with safety re'lated switchgear are protected with automatic total- flooding- COz extinguishing systems. Manual COz and water hose reels and portable extinguishers are available for backup protection. Detection systems annunciate in the control room and alarm locally, Three-hour walls separate switchgear rooms from each other and from the remainder of the plant. Manually actuated smoke removal capability is provided for normal switchgear building and the control building switchgear rooms. For further details, refer to Section 9.4. Smoke removal .

capability would be provided through the use of portable fans if required for other switchgear rooms.

9A.3.7.6 Remote Safety-Related Panels Unit 2 has two remote shutdown rooms separated from each other and other plant areas by 3-hr barriers. An automatic fire detection system annunciates in the control room and alarms locally.; Manual COz and water hose reels and portable extinguishers have been provided outside this room.

9A'.3.7.7 Safety-Related Battery Rooms Battery rooms are separated from each other and from the remainder of the plant by 3-hr fire walls, which are in excess of the fire load calculated in the fire hazards

=

analysis. All penetrations have a 3-hr rating.

Separate ventilation systems have been provided for battery rooms to limit hydrogen buildup to 2 percent maximum. Fan failure is annunciated in the control room. Ross of flow initiates the redundant fan and prints out on the computer.

Amendment 9A.3-56

0 4 Nine Nile Point Vnit 2 PSAR TABLE 9A.3-6 THNBINE BBILDING Figure Pire Area (FA) or safety- Pire Nom Pire Sub Area (FSA) Pire Zone Related Fire Hazard Fire Barrier Area Equipment Combus- Quantitv Total Btu Loading 8eq u ired Detection Extinguishing Number in Area Name tible Lb Gal Btu/Lb (thousands'I Svstem System 9A.3-6 FA 84 740 XL El 277r-6<< 1, 720 None Nisc eguip Insul. 706 12,000 0, 472 220, 370 2. 3 hr Smoke Turbine building Cable trays Insul. 25,346 12, 000 304 L= 152 detection normal switchgear 312, 624 Crer S room west zoned 9A.3-6 FA 83 726 XL El 277'-6>> 2, 300 None Nisc equip Insul. 979 12,000 11,740 258,740 3.2 hr Smoke Turbine building Notor contcol detection normal switchgear centers Fiber. 402 10, 000 7,236 ccoss-room east Cable trays Insul. 48,010 12,000 576 120 zoned 595, 104 9A 3-6 FA 50 725 NZ El 288'-6>> 5, 160 None Bise equip Insu1. 156 12,000 1, 072 24,752 19 min Smoko Ventilation coom Motors Insul. 36 10,000 360 detectiqn l'able l ra y" lnsul.. 10,457 12, 000 125 L. rl04 127, 716

,9A.3-6 FA 50 722 NZ El 277'-6>> 4,840 None Notors Insul. 72 10,000 720 15, 947 12 min Smoke Condensate demin- Cable trays Insul. 6,372 12,000 76 L 464 detection eralizer 77, 104 9A.3-6 FA 50 721 NZ El 280'-6<< 2,345 None Notors Insul. 3 10, 000 30 26,900 20 min smoke Off-gas room Bise equip Insul. 208 12, 000 2,496 detoction Cable trays Insul. 5r062 12,000 60 744 63, 270 9A.3-6 FA 50 723HZ (A) El 277 r 6>> 4,050 Ncne Notocs Insul. 1 10, 000 10 12,3QQ 10 min smoke 724HZ (8) Heater bay A room 4,050 Cable trays Insul. 4,152 12,000 49 824 detection 7 25NZ (C) (similar for 4050 49,034 heater hays 8 and C) 1 of 5

Nine Nile Point Unit 2 PSAR TABLE 9A.3-9 (Cont)

Figure Fire Area (Fh) or Safety-No. Fire Sub brea (FSAB) Pire Zone Belated Fire Area Equipment Fire Hazard Fire Barrier Name in Area<<v Combus- Ouantitv Btu/Lb Total Btus Loading Bequired Detection Ertinguj shing Name tible Lb Gal (thousands'I fB~tu ftvL System Svstem 9A.3-7 PA 59 951 NM El 309'-0" 6, 535 None Motors Insul. 10 10,000 100 15 Negli gi ble Smoke Automatic Truck loading 6 detection sprinkler system MSS storage 9A.3-5 PA 70 905 NM El 261'u 4,750 None Motors Insul. 10,000 20 4 Negligible Smoke Automatic Decon area 6 detect io n sprinkler system dirty vorkshop 9A.3-6 PA 70 395 XL El 279'-0" 2, 250 None Cables Insul. 8436 12,000 101232 44992 34 min Smoke Radvaste svitch- detection gear room 9A. 3-6 PA 70 390 XG 8 El 279 -Ou

~

2,500 None Cables Insul. 10350 12,000 124200 49680 38 min Smoke Total floodlnn 907 NZ Badvaste control detection Union room and 9A. 3-7 FA 70 903 NZ El 306'Ou 4,750 None Misc equip Insul. 21 10, 000 210 Negligible Smoke Decon bldg detection HVAC equipment room 9 A. 3-6 PA 58 904 NZ El LMS 287 'u evaporators 650 None No combus-tibles Smoke detection

)TI 5LPERmaZ

,CABD Amendment 3 of 3

Nine Nile Point Unit 2 FSAR TABLE 9A. 3-10 NORNAL SMITCHGEAR BUILDING Pire Area (PA) or Safety- Pire Figure No. Pire Sub Area gFSA) Pire Zone Belated Fire Hazard Fire Barrier Area Equipment Combus- Ouantitv Btu/Lb Total Btu Loading Required Detection Extinguishing Number Name in Area Name tible Lh Gal tthousandsl gBt~uft~z fhrgmin System S Istem 9 A. 3-4 FA 51 601 XL El 237',715 General area vest None N isc. equip.

Cable trays Insul.

Insul.

797 24, 281 12,000 12, 000 9, 564 291 L 372 110,842 1.4 hp Smoke detection 300,936 cross-zoned 9A 3-4 PA 52 602 XL El 2371 0<< 4,590 None Cable trays In sul. 39,838 12,000 478,056 105,060 1.3 hr Smoke General area east Nisc. equip. Insul. 341 12, 000 4,092 detection Notors Insul. 7 12, 000 70 cross-482,218 zoned 9 A- 3-4 FA 53 603 NZ El 237'-0<< 830 . None Batteries Styrene 1,964 18,000 35,352 111,600 1.4 hr Smoke 1A battery room Cable trays Insul. 4,773 12,000 57 276 detection 92,628 9A 3-4 FA 53 603 NZ El 237'-0<< 830 None Batteries Styren e 1,964 18,000 35,352 127,420 1.6 hr Smoke 18 battery room Cable trays Insul. 5,867 12, 000 70-L 404 detection 105,756 9A. 3-4 FA 53 603 NZ El 2371 0<< 220 None Cable trays Insul. 1,736 12,000 20,832 94,695 1. 2 hr Smoke Room 4A detectxon 9A. 3-4 FA 53 603 NZ El 237'-0<< 220 None Cable trays Insul. 1,736 12,000 20,832 94,695 1. 2 hr Saoke Room 4B detection 9A 35 PA 78 612 XL El 261'-0<< 4,820 None Bise. equip. Insul. 6,522 12,000 782,264 163,675 2.1 hr Smoke Total flooding General area vest Cable trays Insul. 58,870 12, 000 706, 440 detection COz Notor control cross-centers Piher. 233 18,000 L 194 zoned 788,898 9A. 3-5 PA 79 613 XL El 261'-0<< 4, 590 None Bise. equip. Insul. 4,315 12, 000 51, 780 164,220 2.1 hr Smoke Total flooding General area east Notcr control detection ~

COx centers Fiber. 297 18,000 5, 346 cross-Cable trays Insul. 58,053 12, 000 696 636 zoned 753, 762 Amendment 1 of 2

~ gg-c33