ML18064A572: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:,, ., --,,,. | {{#Wiki_filter:* | ||
* Reactor Engineer CC: RAFenech, Palisades JMartin, USNRC RAVincent, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI.* BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA GMKatt, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports 1 | ,, | ||
., | |||
(. | |||
-- ,,,. | |||
', I, consumers Power POWERING | |||
/llllCHIGAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 | |||
\ | |||
January 6, 1995 US Nucleir Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 | |||
'> .. | |||
. Enclosed is a copy of the Monthly Oper~tirtg*Dat~. and Summary of Op~rating Experience for the Pali sades Nuclear Pl ant for th'e *month of December, 1994. | |||
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113. | |||
Sincerely, | |||
/JIJ/, /(__ | |||
KY1(;11 i ams | |||
.1filAA - | |||
* Reactor Engineer CC: RAFenech, Palisades JMartin, USNRC RAVincent, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI.* | |||
BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA GMKatt, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports 1 9501200292 9045015~~55 '* "] | |||
I1 | |||
' | |||
"PDR ADOCK | |||
...~. .,,,_..,..,,. :"."'"- .. *-***** | |||
PDR | |||
.. *-*"' . | |||
--~ \ A CMS' ENERGY COMPANY | |||
r t, OPERATING DATA REPORT DOCKET NO 50-255 DATE 01-03-95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 OPERATING STATUS: | |||
* AVERAGE DAILY UNIT POWER LEVEL MONTH ---=D'"""'"e-=-' | NOTES: | ||
*1 . UN IT NAME Palisades | |||
,, | : 2. REPORTING PERIOD: .941201-941231 | ||
' . | : 3. LICENSED THERMAL POWER (MWt) 2530.0 | ||
: 4. NAMEPLATE RATING (GROSS MWe) 811. 7 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWe) 805.0 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730 | |||
: 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
This Month Yr-to-Date Cumulative | |||
: 11. HOURS IN REPORTING PERIOD 744.0 8760.0 201927.0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5872.0 114312.0 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS | |||
: 14. HOURS GENERATOR ON-LINE 744.0 5860.5 109662.1 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS | |||
: 16. GROSS THERMAL ENERtY GENERATED (MWH) 1867368.0 *14627832. 0 238290651.0 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 611208.0 4746288.0 75364791.0 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 581734.0 4513826.0 71096561.0 | |||
: 19. UNIT SERVICE FACTOR 100.0% 66.9% 54.3% | |||
: 20. UNIT AVAILABILITY FACTOR 100.0% 66.9% 54.3% | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 107.1% 70.6% 52.2%* | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 97.1% 64.0% 43. ?"!. | |||
: 23. UNIT FORCED OUTAGE RATE 0.0% 33.1% 29.8% | |||
: 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | |||
Refueling, 5/20/95, 100 Days | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | |||
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | |||
** Based on condenser backpressure | |||
* Weighted Average (635 MWe used as MDC Net prior to October 1985) | |||
*AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 01/04/95 COMPLETED BY BWBerles MONTH ---=D'"""'"e-=-'ce=m=b=er'--- TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) | |||
: 1. 786 17. 783 | |||
: 2. 786 18. 779 | |||
: 3. 786 19. 787 | |||
: 4. 785 20. 779 | |||
: 5. 785 21. 779 | |||
: 6. 786 22. 779 | |||
: 7. 787 23. 787 | |||
: 8. 794 24. 780 | |||
: 9. 780 25. 779 | |||
: 10. 782 26. 783 | |||
: 11. 792 27. 784 | |||
: 12. 789 28. 784 | |||
: 13. 790 29. 787 | |||
: 14. 768 30. 786 | |||
: 15. 725 31. 784 | |||
: 16. 778 INSTRUCTIONS: | |||
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt~ | |||
,, | |||
. '. | |||
* | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR DECEMBER 1994 The unit ran at fu 11 power for the entire month of December, except on 12/14/94 and 12/15/94. | OF OPERATING EXPERIENCE FOR DECEMBER 1994 The unit ran at fu 11 power for the entire month of December, except on 12/14/94 and 12/15/94. On 12/14/94, power was reduced to 83% during the performance of turbine valve testing. Following completion of testing on 12/15/94, power was increased to full power for the remainder of the month. | ||
On 12/14/94, power was reduced to 83% during the performance of turbine valve testing. Following completion of testing on 12/15/94, power was increased to full power for the remainder of the month. | |||
II l'j | |||
. ,* | |||
., .~ | |||
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor | DOCKET NO 50-255 UNIT Palisades DATE Ol/JJ4/95 COMPLETED BY _ _B~W~B~e_r~le~s REPORT MONTH --~D~E~CE~M~B=ER~1~99~4~-- TELEPHONE (616)764-8913 | ||
: | ) | ||
UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause &Corrective 4 5 (Hours) Shutting Event Code Code Action to 3 | |||
Down Reactor Report # Prevent Recurrence | |||
. 1 12/14/94 s 22 B n/a n/a n/a n/a Planned power reduction to 83% for turbine valve testing. | |||
No corrective action needed. | |||
: 1. 2. 3. 4. 5. | |||
F: Forced Reason: Method: Exhibit G - Instructions Exhibit - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refue ling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161) | |||
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) | |||
H-Other (Explain)}} |
Revision as of 17:25, 21 October 2019
ML18064A572 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 12/31/1994 |
From: | Berles B, Anthony Williams CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
NUDOCS 9501200292 | |
Download: ML18064A572 (5) | |
Text
,,
.,
(.
-- ,,,.
', I, consumers Power POWERING
/llllCHIGAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043
\
January 6, 1995 US Nucleir Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255
'> ..
. Enclosed is a copy of the Monthly Oper~tirtg*Dat~. and Summary of Op~rating Experience for the Pali sades Nuclear Pl ant for th'e *month of December, 1994.
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
Sincerely,
/JIJ/, /(__
KY1(;11 i ams
.1filAA -
- Reactor Engineer CC: RAFenech, Palisades JMartin, USNRC RAVincent, Palisades Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI.*
BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA GMKatt, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC Document Control, 950*22*35*10/L Cycle 11 Reports 1 9501200292 9045015~~55 '* "]
I1
'
"PDR ADOCK
...~. .,,,_..,..,,. :"."'"- .. *-*****
.. *-*"' .
--~ \ A CMS' ENERGY COMPANY
r t, OPERATING DATA REPORT DOCKET NO 50-255 DATE 01-03-95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 OPERATING STATUS:
NOTES:
- 1 . UN IT NAME Palisades
- 2. REPORTING PERIOD: .941201-941231
- 3. LICENSED THERMAL POWER (MWt) 2530.0
- 4. NAMEPLATE RATING (GROSS MWe) 811. 7
- 5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
- 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month Yr-to-Date Cumulative
- 11. HOURS IN REPORTING PERIOD 744.0 8760.0 201927.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 5872.0 114312.0
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS GENERATOR ON-LINE 744.0 5860.5 109662.1
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERtY GENERATED (MWH) 1867368.0 *14627832. 0 238290651.0
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 611208.0 4746288.0 75364791.0
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 581734.0 4513826.0 71096561.0
- 19. UNIT SERVICE FACTOR 100.0% 66.9% 54.3%
- 20. UNIT AVAILABILITY FACTOR 100.0% 66.9% 54.3%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 107.1% 70.6% 52.2%*
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.1% 64.0% 43. ?"!.
- 23. UNIT FORCED OUTAGE RATE 0.0% 33.1% 29.8%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
Refueling, 5/20/95, 100 Days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Weighted Average (635 MWe used as MDC Net prior to October 1985)
- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 01/04/95 COMPLETED BY BWBerles MONTH ---=D'"""'"e-=-'ce=m=b=er'--- TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)
- 1. 786 17. 783
- 2. 786 18. 779
- 3. 786 19. 787
- 4. 785 20. 779
- 5. 785 21. 779
- 6. 786 22. 779
- 7. 787 23. 787
- 8. 794 24. 780
- 9. 780 25. 779
- 10. 782 26. 783
- 11. 792 27. 784
- 12. 789 28. 784
- 13. 790 29. 787
- 14. 768 30. 786
- 15. 725 31. 784
- 16. 778 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt~
,,
. '.
SUMMARY
OF OPERATING EXPERIENCE FOR DECEMBER 1994 The unit ran at fu 11 power for the entire month of December, except on 12/14/94 and 12/15/94. On 12/14/94, power was reduced to 83% during the performance of turbine valve testing. Following completion of testing on 12/15/94, power was increased to full power for the remainder of the month.
II l'j
. ,*
., .~
DOCKET NO 50-255 UNIT Palisades DATE Ol/JJ4/95 COMPLETED BY _ _B~W~B~e_r~le~s REPORT MONTH --~D~E~CE~M~B=ER~1~99~4~-- TELEPHONE (616)764-8913
)
UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause &Corrective 4 5 (Hours) Shutting Event Code Code Action to 3
Down Reactor Report # Prevent Recurrence
. 1 12/14/94 s 22 B n/a n/a n/a n/a Planned power reduction to 83% for turbine valve testing.
No corrective action needed.
- 1. 2. 3. 4. 5.
F: Forced Reason: Method: Exhibit G - Instructions Exhibit - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refue ling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)