| | issue date = 09/30/1995 | | | issue date = 09/30/1995 |
| | title = Monthly Operating Rept for Sept 1995 for Palisades Nuclear Plant.W/951004 Ltr | | | title = Monthly Operating Rept for Sept 1995 for Palisades Nuclear Plant.W/951004 Ltr |
| | author name = BERLES B W, WILLIAMS A L | | | author name = Berles B, Williams A |
| | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), |
| | addressee name = | | | addressee name = |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr ML18068A5351999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr ML18066A3931999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr ML18066A3651998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr ML18066A3421998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With 981202 Ltr ML18068A4921998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 981103 Ltr ML18066A3181998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant ML18066A2901998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With 980903 Ltr ML18066A3191998-08-31031 August 1998 Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant ML18066A2701998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Palisades Nuclear Plant.W/980803 Ltr ML18066A2311998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Palisades Nuclear Plant ML18066A2321998-05-31031 May 1998 Revised MOR for May 1998 for Palisades Nuclear Plant ML18066A1741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Palisades Nuclear Plant.W/980601 Ltr ML18066A2331998-04-30030 April 1998 Revised MOR for Apr 1998 for Palisades Nuclear Plant ML18068A3461998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Palisades Nuclear Plant.W/980501 Ltr ML18065B2071998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant.W/980403 Ltr ML18066A2341998-03-31031 March 1998 Revised MOR for Mar 1998 for Palisades Nuclear Plant ML18068A3041998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Palisades Nuclear Plant.W/980302 Ltr ML18066A2351998-02-28028 February 1998 Revised MOR for Feb 1998 for Palisades Nuclear Plant ML18067A8211998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Palisades Nuclear Plant.W/980203 Ltr ML18065B1341997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Palisades Nuclear Plant.W/980106 Ltr ML18065B1041997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Palisades Nuclear Plant.W/971202 Ltr ML18067A7661997-10-31031 October 1997 Revised MOR for Oct 1997 for Palisades Nuclear Plant ML18067A7021997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for PNPP.W/971002 Ltr ML18067A6701997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Palisades Nuclear Plant.W/970903 Ltr ML18067A6551997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Palisades Nuclear Plant.W/970804 Ltr ML18067A6231997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Palisades Nuclear Plant.W/970702 Ltr ML18067A5621997-05-31031 May 1997 Revised Monthly Operating Rept & Summary of Operating Experience for May 1997 for Pnpp ML18067A5251997-04-30030 April 1997 Revised MOR for April 1997 for Pnp ML18067A4741997-03-31031 March 1997 Monthly Operating Rept for March 1997 for Palisades Nuclear Plant.W/970402 Ltr ML18067A4851997-03-31031 March 1997 Revised Monthly Operating Rept for Mar 1997 for Palisades Nuclear Plant ML18066A8981997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Palisades Nuclear Plant.W/970304 Ltr ML18066A9011997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Palisades Nuclear Plant.W/970306 Ltr ML18066A8761997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Palisades Nuclear Plant.W/970204 Ltr ML18066A8281996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Palisades Nuclear Plant.W/970114 Ltr ML18065B1011996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Palisades Nuclear Plant.W/961203 Ltr ML18065B0701996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Palisades Nuclear Plant.W/961104 Ltr ML18065A9471996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Palisades Nuclear Plant.W/961002 Ltr ML20117K1511996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Palisades Nuclear Plant ML18065A8691996-07-31031 July 1996 Operating Data Rept for July 1996 for Palisades ML18065A8561996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Palisades Nuclear Plant.W/960805 Ltr ML18065A8121996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Palisades Nuclear Plant.W/960702 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18066A6901999-11-0101 November 1999 Rev 5 to Palisades Nuclear Plant Colr. ML18066A6761999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant ML18066A6271999-09-0202 September 1999 LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr ML18066A6351999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant ML18066A6771999-08-31031 August 1999 Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant ML18066A6221999-08-20020 August 1999 LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr ML18066A6061999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr ML18066A5201999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr ML18066A4841999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr ML18066A6371999-04-30030 April 1999 Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18068A5941999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant.With 990503 Ltr ML18066A4161999-04-0101 April 1999 Rev 4 to COLR, for Palisades Nuclear Plant ML18066A4501999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Palisades Nuclear Plant.With 990402 Ltr ML18066A4671999-03-31031 March 1999 Rev 0 to SIR-99-032, Flaw Tolerance & Leakage Evaluation Spent Fuel Pool Heat Exchanger E-53B Nozzle Palisades Nuclear Plant. ML18068A5351999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Palisades Nuclear Plant.With 990302 Ltr ML18066A3931999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Palisades Nuclear Plant.With 990202 Ltr ML18066A3781999-01-20020 January 1999 LER 98-013-00:on 981222,safeguards Transfer Tap Changer Failure Caused Inadvertant DG Start.Caused by Failed Motor Contactor.Contactor Was Replaced.With 990120 Ltr ML20206F6131998-12-31031 December 1998 1998 Consumers Energy Co Annual Rept. with ML18066A3651998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Palisades Nuclear Plant.With 990105 Ltr ML18066A3421998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Palisades Nuclear Plant.With 981202 Ltr ML18066A3301998-11-11011 November 1998 Part 21 Rept Re Potential Safety Hazard Associated with Wrist Pin Assemblies for FM-Alco 251 Engines at Palisades Nuclear Power Plant.Caused by Insufficient Friction Fit Between Pin & Sleeve.Supplier of Pin Will No Longer Be Used ML18068A4921998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Palisades Nuclear Plant.With 981103 Ltr ML18068A4851998-10-29029 October 1998 LER 97-011-01:on 971012,starting of Primary Coolant Pump with SG Temps Greater than Cold Leg Temps Occurred.Caused by Inadequate Procedures & Operator Decision.Sop Used for Starting Primary Coolant Pump Enhanced ML18066A3181998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Palisades Nuclear Plant ML18066A2901998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Palisades Nuclear Power Plant.With 980903 Ltr ML18066A3191998-08-31031 August 1998 Revised Monthly Operating Rept Data for Aug 1998 for Palisades Nuclear Plant ML18066A2831998-08-18018 August 1998 LER 98-010-00:on 980721,reactor Manually Tripped.Caused by Failure of Coupling Which Drives Feedwater Pump Main Lube Oil Pump.Main Lube Oil Pump Coupling & Associated Components Replaced & Satisfactorily Tested ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237E0301998-07-31031 July 1998 ISI Rept 3-3 ML18066A2701998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Palisades Nuclear Plant.W/980803 Ltr ML18066A2311998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Palisades Nuclear Plant ML18066A2261998-06-30030 June 1998 LER 98-009-00:on 980531,small Pinhole Leak Found on One of Welds,During Leak Test Following Replacement of Pcs Sample Isolation Valves.Caused by Welder Error.Leaking Welds Repaired ML18066A3061998-06-18018 June 1998 SG Tube Inservice Insp. ML20249C4951998-06-17017 June 1998 Rev 1 to EA-GEJ-98-01, Palisades Cycle 14 Disposition of Events Review ML18066A1781998-06-0909 June 1998 LER 98-008-00:on 980511,noted That Procedure Did Not Fully Satisfy Requirement to Test High Startup Rate Trip Function. Caused by Misunderstanding of Testing Requirements.Revised TS Surveillance Test Procedure & Reviewed Other Procedures ML18066A1711998-06-0101 June 1998 Part 21 Rept Re Impact of RELAP4 Excessive Variability on Palisades Large Break LOCA ECCS Results.Change in PCT Between Cycle 13 & Cycle 14 Does Not Constitute Significant Change Per 10CFR50.46 ML18066A1741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Palisades Nuclear Plant.W/980601 Ltr ML18066A2321998-05-31031 May 1998 Revised MOR for May 1998 for Palisades Nuclear Plant ML18068A4701998-05-31031 May 1998 Annual Rept of Changes in ECCS Models Per 10CFR50.46. ML18065B2451998-05-13013 May 1998 LER 98-007-00:on 980413,HPIS Sys Was Noted Inoperable During TS Surveillance Test.Caused by Performance of Flawed Procedure.Operators & Engineers Will Be Trained to Improve Operational Decision Making Through Resources & Knowledge ML18066A2331998-04-30030 April 1998 Revised MOR for Apr 1998 for Palisades Nuclear Plant ML18068A3461998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Palisades Nuclear Plant.W/980501 Ltr ML18066A3411998-04-22022 April 1998 Rev 0 to EMF-98-013, Palisades Cycle 14:Disposition & Analysis of SRP Chapter 15 Events. ML18065B2071998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Palisades Nuclear Plant.W/980403 Ltr ML20217C2741998-03-31031 March 1998 Independent Review - Is Consumers Energy Method (W Method) of Determining Palisades Nuclear Plant Best Estimate Fluence by Combining Transport Calculation & Dosimetry Measurements Technically Sound & Does It Meet Intent of Pts ML18066A2341998-03-31031 March 1998 Revised MOR for Mar 1998 for Palisades Nuclear Plant ML18068A3041998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Palisades Nuclear Plant.W/980302 Ltr ML18066A2351998-02-28028 February 1998 Revised MOR for Feb 1998 for Palisades Nuclear Plant ML18065B1641998-02-0505 February 1998 Rev 0 to Regression Analysis for Containment Prestressing Sys at 25th Year Surveillance. ML18067A8211998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Palisades Nuclear Plant.W/980203 Ltr 1999-09-30
[Table view] |
Text
.* ( I consumers Power POWERING lllllCHIGAN"S PROGRESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Coven. Ml 49043 October 4, 1995 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of September, 1995. If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113. Sincerely, A L Wi 11 i ams Reactor Engineer CC: RAVincent, Palisades Senior Resident Inspector, Palisades DRHahn, Div of Rad Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA CWMain, Palisades SMMclntyre, Pl3-121 Region III Administrator, USNRC
- Document Control, 950*22*35*10/L Cycle 12 Reports 9510110092 950930 PDR . 'AD.OCK 05000255 R -" ... : . --. ----. . ( . I;' l I A CMS' ENERGY COMPANY
- ._. OPERAT1NG STATUS
- 1. UNIT NAME 2. 3. . . . REPORTING PERIOD
- * LICENSED THERMAL .POWER (MWt) _4. NAMEPLATE RATING (GROSS MWei 5 *. 6ESIGN ELECTRICAL RATING (NET MWe) 6. MAXIMUM DEPENDABLE-CAPACITY* (GROSS MWe) OPERATING DATA REPORT Pal is"ades 2530.0. 811.7 805.0 . . **no 7. MAXIMUM DEPENDABLE CAPACITY CNET MWe) **730 DOCKET NO. 50-255* DATE COMPLETED BY BWBerles TELEPHONE (616)764-8913 NOTES: 8. IF. CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 THROUGH ?AND 7) SIN.CE LAST REPORT, GIVE REASONS: 9 .. POWER LEVEL TO WHICH RESTRICTED, _IF ANY (NET MWe): 10. REASONS FOR IF ANY: -l1. HOURS lN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR WAS CRITICAL 13.
- REACTOR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR ON-LINE* . . 15: UNIT RESERVE SHUTDOWN HOURS 16. GROSS THERMAL ENERGY GENERATED CMWH) 17. GROS_S EL_ECTRICAL ENERGY GENERATED.
CMWH). 18: NET GENERATED CMWH). 19. UNIT SERVICE. FACTOR 20. UNIT AVAILABILITY .FACTOR 21. "UNIT CAPACITY FACTOR (USIN°G MDC NET) . 22. UNIT. CAPACITY FACTOR (USING DE_R NET) 23. UNIT-. FORCED *OUTAGE *RATE* ----* This Month 720.0 720.0 674.7. 154.4662.3 502789.0.
476223.0 93.7% 93.7%. .90.6% .
24:
.6.: MONTHS (TYPE,* DATE AND DURATION OF EACH): _,:r:f
]'. " . . 25_. IF SHUTDOWN AT.END;,OF_REl?ORT-PERIOO, ESTI.MATED DATE OF STARTUP: 26. UNITS JN TEST *S-TATIJS'°CPRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on*condenser backpressure
- Weighted Av.er age (635 MWe used as MDC Net pr for to October 1985) * ,._. Yr-to-Date Cumulative 6551.0 208478.0 4430.3 4315.6 113977. 7 ----
248639441.0 3350229.0 . 787'15020.
0 . 3181433. 0 . 742n994.o 65;9% 54. ?"!. 65.9%: 54. ?"!. 66.5% 52.6%* ..
44.3% -* .. .. 4.5% 29.1% Forecast Achieved AVERAGE DAILY UNIT POWER LEVEL MONTH DAY AVERAGE DAILY POWER LEVEL DAY (MWe Net) 1. 267 17. 2. 159 18. 3. 453 19. 4. 728 20. 5. 758 21. 6. 756 22. 7. 763 23. 8. 777 24. 9. 776 25. 10. 778 26. 11. 726 27. 12. 0 28. 13. 172 29. 14. 592 30. 15. 770 31. 16. 766 INSTRUCTIONS:
DOCKET NO 50-255 UNIT Palisades DATE 10/04/95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 769 775 771 768 775 777 778 778 776 772 772 771 769 764 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole megawatt.
.. J '
SUMMARY
OF OPERATING EXPERIENCE FOR SEPTEMBER 1995 The unit began the month at 49% power. Power was reduced on 9/01/95 and the unit was taken off-line at 0208 on 9/02/95 (the reactor remained critical) for a forced outage to repair a Motor Operated Disconnect in the switchyard.
The unit was back on-1 ine at 1458 on 9/02/95. The unit was re.turned to 100% by 0900 on 9/04/95. On 9/11/95, a broken conductor was discovered between an i sophase bus and the main generator.
A power reduction was initiated from 100% at 1800 and the unit was off-line at 2106 ( the reactor remained cal) for a forced outage to repair the isophase bus. The unit was placed line on 9/13/95 at 0538, and 100% power was reached by 0600 on 9/15/95. The unit operated at 100% for the remainder of the month.
RE PORT MONTH -----'S"""E'--P T'-=E""'"MB=E=R-'1=9-=-9"'-5
__ No. Date Type 1 2 8/30/95 F 3 9/11/95 F l. F: Forced S: Scheduled Duration (Hours) 2. Reason: 12.8 32.5 Reason 2 A A A-Equipment Failure (Explain) 8-Maintenance or Test C-Refue ling D-Regulatory E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor 3 Report # 4 4 3. Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
- 4. System Code 4 Component Code 5 Exhibit G -Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
DOCKET NO 50-255 UN IT Pali sades DATE _____lg/04/95 COMPLETED BY BWBerles TELEPHONE (616)764-8913 Cause & Corrective Action to Prevent Recurrence Power was reduced from 99.6% due to a Motor Operated Disconnect in the switchyard overheating.
The unit was taken off-line at 0208 on 9/2/95 and placed back on-line at 1458 on 9/2. Power was reduced from 100% on 9/11 at 1800 and the unit was off-line at 2106 to repair a conductor between an isophase bus and the main generator.
The unit was on-line on 9/13 at 0538. 5. Exhibit I -Same Source !, I 1i .. . .