ML18106A173: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 32: Line 32:
DSN NO. EXPLANATION NONE   
DSN NO. EXPLANATION NONE   
. ' COUNTY OF SALEM STATE OF NEW JERSEY I, A. Christopher Bakken III, of full age, being duly sworn according to law, upon my oath depose and say: 1. I am General Manager of Salem Generating Station, and as such, am authorized to sign Discharge Monitoring Reports submitted to the New Jersey Department of Environmental Protection pursuant to the Station's New Jersey Pollutant Discharge Elimination System permit. 2. I have reviewed the attached Discharge Monitoring Reports. Pursuant to N.J. A C. 7: 14A-2.4, I certify under penalty oflaw that I have personally examined and am familiar with the information submitted in this document and all attachments and that based on my inquiry of those individuals responsible for obtaining the information, I believe the submitted information is true, accurate and complete.
. ' COUNTY OF SALEM STATE OF NEW JERSEY I, A. Christopher Bakken III, of full age, being duly sworn according to law, upon my oath depose and say: 1. I am General Manager of Salem Generating Station, and as such, am authorized to sign Discharge Monitoring Reports submitted to the New Jersey Department of Environmental Protection pursuant to the Station's New Jersey Pollutant Discharge Elimination System permit. 2. I have reviewed the attached Discharge Monitoring Reports. Pursuant to N.J. A C. 7: 14A-2.4, I certify under penalty oflaw that I have personally examined and am familiar with the information submitted in this document and all attachments and that based on my inquiry of those individuals responsible for obtaining the information, I believe the submitted information is true, accurate and complete.
I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.  
I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.
: 3. The signature on the attached Discharge Monitoring Reports is my signature and 'I-am submitting this affidavit in satisfaction of the requirement that my signature be notarized.
: 3. The signature on the attached Discharge Monitoring Reports is my signature and 'I-am submitting this affidavit in satisfaction of the requirement that my signature be notarized.
Sworn and subscribed before nie this/fllilay of4;DL 1997. k/MA)'A D. HADDEN Publtcof MvCommisslon f;xpires 03-29-2000 A Christopher Bakken III General Manager -Salem Operations}}
Sworn and subscribed before nie this/fllilay of4;DL 1997. k/MA)'A D. HADDEN Publtcof MvCommisslon f;xpires 03-29-2000 A Christopher Bakken III General Manager -Salem Operations}}

Revision as of 13:37, 25 April 2019

Forwards New Jersey NPDES Discharge Monitoring Repts, for Oct 1997 for Plant.Observed Results of Measurements & Analysis Required to Be Performed
ML18106A173
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/18/1997
From: BAKKEN A C
Public Service Enterprise Group
To:
NEW JERSEY, STATE OF
Shared Package
ML18106A174 List:
References
NUDOCS 9711280125
Download: ML18106A173 (5)


Text

(

Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit New Jersey Department of Environmental Protection Division of Water Quality Bureau of Permit Management CN029 Trenton, NJ 08625-0029 Certified Mail Number P 462 770 308 November 18, 1997 NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORTS SALEM GENERATING STATION PERMIT NO. NJ0005622 Attached is the Discharge Monitoring Report for Salem Generating Station containing the information as required in Permit No. NJ0005622 for the month, of October, 1997. This report is required by and prepared specifically for the Environmental Protection Agency (EPA) and the New Jersey Department of Protection (NJDEP). It presents only the observed results of measurements and analyses required to be performed by the above agencies.

The choice of the measurement devices and analytical methods is controlled by EPA and NJDEP, not by the company, and there are limitations on the accuracy of such measurement devices and analytical techniques even when used and maintained as required.

Accordingly, this report is not intended as an assertion that any instrument has measured, or any reading or analytical result *represents, the true value with absolute accuracy, nor is it an endorsement of the suitability of any analytical or measurement procedure.

Attachments 9711280125 971118 PDR ADOCK 05000272 R PDR The power is in your hands. Sincerely, A. Christopher Bakken 111 General Manager -Salem Operations I llllll lllll lllll lllll lllll llllll Ill llll ! I *&&867F*j 95*2168 REV. 6/94 NJPDES Report October, 1997 2 C Mr. Gerald M. Hansler -Executive Director USNRC -Document Control Desk Unit#1-50-272 Unit#2-50-311 General Manager -Salem Operations Manager-Licensing

& Regulation M. Vaskis D. Hurka D. Dowiak R. Quinn Central Record Facility E. Keating NJPDES Report Explanation of Deviations October, 1997 The following explanations are included to clarify possible deviations from permit conditions.

General -The columns labeled, "No. Ex. " on the enclosed DMR, tabulate the number of daily discharge values outside the indicated limits. Data reporting and accuracy reflect the working environment, the design capabilities and reliability of the monitoring instruments and operating equipment.

All reported concentrations are based on daily discharge values. Total residual chlorine is performed three times per week during chlorination unless otherwise indicated . . Analytical values which are less than detectable are reported as zero unless otherwise indicated.

Analytical results for all parameters other than pH, temperature, TSS, TRC and Bioassay results are provided by Raytheon Environmental Services Laboratory. (NJDEP certification 77373) or South Jersey Testing Laboratory (NJDEP certification 06431). Bioassay results are provided by ENSR Environmental Toxicology Laboratory (NJDEP certification 82888). Net negative discharge values are reported as negative.

489C-Flow thru outfall 489 is calculated based on Oil Water Separator Lift Pump run times. 481-486 -Chlorination of the circulation water system normally does not occur except as otherwise noted. Service water system chlorination is normally continuous and is monitored on the circulating water system outfall. Chlorination of both systems will be indicated by results reported for both and represents their combined effect upon the circulating water outfall.

NJPDES Report Explanation of Deviations October, 1997 48C -Non-Radioactive Liquid Waste -This system continues to be operated in a batch mode to treat for hydrazine and ammonia by the addition of sodium hypochlorite.

No hydrazine has been discharged from this outfall during the reporting period. Residual chlorine is monitored at the outfalls of DSN's 481, 482, 484, and 485, and has not exceeded the permit limits at these outfalls.

The following excursions are included in the attached report and are explained below. Excursions have not endangered nor significantly impacted public health or the environment.

DSN NO. EXPLANATION NONE

. ' COUNTY OF SALEM STATE OF NEW JERSEY I, A. Christopher Bakken III, of full age, being duly sworn according to law, upon my oath depose and say: 1. I am General Manager of Salem Generating Station, and as such, am authorized to sign Discharge Monitoring Reports submitted to the New Jersey Department of Environmental Protection pursuant to the Station's New Jersey Pollutant Discharge Elimination System permit. 2. I have reviewed the attached Discharge Monitoring Reports. Pursuant to N.J. A C. 7: 14A-2.4, I certify under penalty oflaw that I have personally examined and am familiar with the information submitted in this document and all attachments and that based on my inquiry of those individuals responsible for obtaining the information, I believe the submitted information is true, accurate and complete.

I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

3. The signature on the attached Discharge Monitoring Reports is my signature and 'I-am submitting this affidavit in satisfaction of the requirement that my signature be notarized.

Sworn and subscribed before nie this/fllilay of4;DL 1997. k/MA)'A D. HADDEN Publtcof MvCommisslon f;xpires 03-29-2000 A Christopher Bakken III General Manager -Salem Operations