Davis Besse: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
| Line 6: | Line 6: | ||
|state=Ohio | |state=Ohio | ||
|town=Oak Harbor | |town=Oak Harbor | ||
|ISFSI docket=07200014 | |||
|mapping location=41° 35' 43.62" N, 83° 5' 22.23" W | |mapping location=41° 35' 43.62" N, 83° 5' 22.23" W | ||
|company=Cleveland Electric | |company=Cleveland Electric | ||
Revision as of 10:33, 11 January 2019
| Plant | |
|---|---|
| Company | Cleveland Electric |
| Where | Oak Harbor, Ohio |
| Regulatory | |
| Region | NRC Region 3 |
| ISFSI docket | 07200014 |
| wikipedia link | |
| Docket | 05000346 |
|---|---|
| Licensed Power Level (Thermal) | 2,817 MWt |
| Unit type | B&W-R-LP |
| Containment | Dry, Ambient Pressure |
| Status | |
| Commission | July 31, 1978 |
| Renewal | 12/08/2015 |
| NRC Website | |