ENS 40396: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/17/2003 03:15 PST
| event date = 12/17/2003 03:15 PST
| last update date = 12/17/2003
| last update date = 12/17/2003
| title = Technical Specification Required Shutdown Due To Loss Of Both Trains Of Safety Injection  
| title = Technical Specification Required Shutdown Due to Loss of Both Trains of Safety Injection  
| event text = The following information was obtained from the licensee via facsimile:
| event text = The following information was obtained from the licensee via facsimile:
1. SYSTEMS AFFECTED:  High Pressure Safety Injection (HPSI), Low Pressure Safety Injection (LPSI), Recirculation  Actuation [System] (RAS), Containment Spray (CS).
1. SYSTEMS AFFECTED:  High Pressure Safety Injection (HPSI), Low Pressure Safety Injection (LPSI), Recirculation  Actuation [System] (RAS), Containment Spray (CS).

Latest revision as of 21:24, 1 March 2018

ENS 40396 +/-
Where
San Onofre Southern California Edison icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown
Time - Person (Reporting Time:+-2.67 h-0.111 days <br />-0.0159 weeks <br />-0.00366 months <br />)
Opened: John Braisted
08:35 Dec 17, 2003
NRC Officer: Howie Crouch
Last Updated: Dec 17, 2003
40396 - NRC Website
Loading map...