ENS 43430: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 06/19/2007 06:35 CDT | | event date = 06/19/2007 06:35 CDT | ||
| last update date = 06/19/2007 | | last update date = 06/19/2007 | ||
| title = Tech Spec Required Shutdown Due | | title = Tech Spec Required Shutdown Due to Instrument Line Steam Leak | ||
| event text = During performance of a plant shut down personnel entered the Drywell to investigate a steam leak. At 0635 hours, personnel identified steam leaking from a flexible hose instrument line (approximately 1" diameter) that is welded to an elbow tap on the C Main Steam line and concluded that the leak constitutes pressure boundary leakage. This required entry into TS 3.4.5, Condition C. This requires that the unit be in Mode 3 in 12 hours and Mode 4 in 36 hours, which is a TS required shutdown. | | event text = During performance of a plant shut down personnel entered the Drywell to investigate a steam leak. At 0635 hours, personnel identified steam leaking from a flexible hose instrument line (approximately 1" diameter) that is welded to an elbow tap on the C Main Steam line and concluded that the leak constitutes pressure boundary leakage. This required entry into TS 3.4.5, Condition C. This requires that the unit be in Mode 3 in 12 hours and Mode 4 in 36 hours, which is a TS required shutdown. | ||
The station has determined that this event is reportable under the provisions of: 10 CFR 50.72 (b)(2)(i) for the plant shutdown required by Technical Specifications, as a 4-hour notification; 10 CFR 50.72 (b)(3)(ii)(A) as an event or condition that resulted in the condition of the nuclear power plant, including its principal safety barriers being seriously degraded, as an 8-hour notification. | The station has determined that this event is reportable under the provisions of: 10 CFR 50.72 (b)(2)(i) for the plant shutdown required by Technical Specifications, as a 4-hour notification; 10 CFR 50.72 (b)(3)(ii)(A) as an event or condition that resulted in the condition of the nuclear power plant, including its principal safety barriers being seriously degraded, as an 8-hour notification. |
Latest revision as of 22:16, 1 March 2018
Where | |
---|---|
Clinton Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded | |
Time - Person (Reporting Time:+-0.43 h-0.0179 days <br />-0.00256 weeks <br />-5.89014e-4 months <br />) | |
Opened: | Ron Frantz 11:09 Jun 19, 2007 |
NRC Officer: | Bill Huffman |
Last Updated: | Jun 19, 2007 |
43430 - NRC Website
| |