ENS 43527: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 07/26/2007 EDT | | event date = 07/26/2007 EDT | ||
| last update date = 07/27/2007 | | last update date = 07/27/2007 | ||
| title = Part 21 Notification - Failure | | title = Part 21 Notification - Failure of Enersys (Exide) Battery | ||
| event text = In March 2005, battery cell internal resistance for an EDG battery bank revealed five cells with abnormal resistance. "There was one cell for which no reading could be obtained and was replaced immediately. A second cell had a reading that was nearly four times the average of the associated string and was subsequently replaced as a proactive measure during the EDG maintenance outage. Three (3) other cells were noted with higher than average readings that are not considered to be operability concerns. In total, five (5) cells out of a total of 240 were found with higher than expected internal resistance values. | | event text = In March 2005, battery cell internal resistance for an EDG battery bank revealed five cells with abnormal resistance. "There was one cell for which no reading could be obtained and was replaced immediately. A second cell had a reading that was nearly four times the average of the associated string and was subsequently replaced as a proactive measure during the EDG maintenance outage. Three (3) other cells were noted with higher than average readings that are not considered to be operability concerns. In total, five (5) cells out of a total of 240 were found with higher than expected internal resistance values. | ||
The failed battery was destructively tested revealing significant corrosion within the battery. The unit-2 batteries have been replaced. The unit-1 batteries will be replaced in the fall 2007 outage. | The failed battery was destructively tested revealing significant corrosion within the battery. The unit-2 batteries have been replaced. The unit-1 batteries will be replaced in the fall 2007 outage. |
Latest revision as of 21:16, 1 March 2018
Where | |
---|---|
North Anna Virginia (NRC Region 2) | |
Reporting | |
10 CFR 21.21 | |
Time - Person (Reporting Time:+29.08 h1.212 days <br />0.173 weeks <br />0.0398 months <br />) | |
Opened: | Tom Shaub 09:05 Jul 27, 2007 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Jul 27, 2007 |
43527 - NRC Website
| |