ML15281A177: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 10/16/2015
| issue date = 10/16/2015
| title = Notice of Availability of the Final Environmental Impact Statement for the Construction Permit for the Proposed Shine Medical Radioisotope Production Facility
| title = Notice of Availability of the Final Environmental Impact Statement for the Construction Permit for the Proposed Shine Medical Radioisotope Production Facility
| author name = Wrona D J
| author name = Wrona D
| author affiliation = NRC/NRR/DLR
| author affiliation = NRC/NRR/DLR
| addressee name = Nelson R
| addressee name = Nelson R
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637
 
October 16, 2015  
 
Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY


==Dear Mr. Nelson:==
==Dear Mr. Nelson:==


The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, "Environmental Impact Statement fo r the Construction Permit for the SHINE Radioisotope Production Facility, Final Report" (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.
The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.  
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.
 
If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely, 
  /RA/  David J. Wrona, Chief Environmental Review and
 
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation


Docket No. 50-608  
R. Nelson                                      If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                            /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608


==Enclosure:==
==Enclosure:==
As stated cc w/encls: Distribution List  
As stated cc w/encls: Distribution List


ML15281A235 (Package) ML15281A177 (Letter) ML15288A046 (Final EIS)
ML15281A235 (Package) ML15281A177 (Letter)
  *concurred via email
ML15288A046 (Final EIS)
                                                            *concurred via email RERB Technical      BC:RERB:DLR OFFICE LA:DLR          PM:RERB:DLR Staff Member NAME      IBetts      MMoser              RHoffman            DWrona DATE      10/ 13 /15 10/ 13 /15          10/ 14 /15          10/ 16 /15


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:
 
E-MAIL:
DISTRIBUTION:
PUBLIC Public                 DHowe           SLynch     JLynch  SHarwell RTR r/f                 MAdams         CWeber     CFrazier MConley RidsNrrDpr             MMoser         DBarss     LLondon  JWeil RidsNrrDprPrta         AAdams         ASapountzis MYoung   VHuckabay RidsNrrDprPrtb         LTran           DSeymour   TZaki   DWrona RidsOgcRp Resource                                           RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY:
E-MAIL: PUBLIC Public   DHowe   SLynch JLynch  SHarwell RTR r/f   MAdams CWeber CFrazier MConley RidsNrrDpr   MMoser DBarss   LLondon  JWeil RidsNrrDprPrta   AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb   LTran   DSeymour TZaki DWrona RidsOgcRp Resource       RHoffman RidsAcrsAcnw_MailCTR Resource  
Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.
 
2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585
HARD COPY:
Laura Bub Environmental Analysis and Review   Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. 2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration,   NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585  
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001


October 16, 2015  
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637
 
Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY


==Dear Mr. Nelson:==
==Dear Mr. Nelson:==


The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, "Environmental Impact Statement fo r the Construction Permit for the SHINE Radioisotope Production Facility, Final Report" (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.
The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.  
In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.
 
If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely, 
  /RA/  David J. Wrona, Chief Environmental Review and
 
Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation


Docket No. 50-608  
R. Nelson                                      If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.
Sincerely,
                                            /RA/
David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608


==Enclosure:==
==Enclosure:==
As stated cc w/encls: Distribution List  
As stated cc w/encls: Distribution List


ML15281A235 (Package) ML15281A177 (Letter) ML15288A046 (Final EIS)
ML15281A235 (Package) ML15281A177 (Letter)
  *concurred via email
ML15288A046 (Final EIS)
                                                            *concurred via email RERB Technical      BC:RERB:DLR OFFICE LA:DLR          PM:RERB:DLR Staff Member NAME      IBetts      MMoser              RHoffman            DWrona DATE      10/ 13 /15 10/ 13 /15          10/ 14 /15          10/ 16 /15


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:
 
E-MAIL:
DISTRIBUTION:
PUBLIC Public                 DHowe           SLynch     JLynch  SHarwell RTR r/f                 MAdams         CWeber     CFrazier MConley RidsNrrDpr             MMoser         DBarss     LLondon  JWeil RidsNrrDprPrta         AAdams         ASapountzis MYoung   VHuckabay RidsNrrDprPrtb         LTran           DSeymour   TZaki   DWrona RidsOgcRp Resource                                           RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY:
E-MAIL: PUBLIC Public   DHowe   SLynch JLynch  SHarwell RTR r/f   MAdams CWeber CFrazier MConley RidsNrrDpr   MMoser DBarss   LLondon  JWeil RidsNrrDprPrta   AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb   LTran   DSeymour TZaki DWrona RidsOgcRp Resource       RHoffman RidsAcrsAcnw_MailCTR Resource  
Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.
 
2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585}}
HARD COPY:
Laura Bub Environmental Analysis and Review   Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc. 2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration,   NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585}}

Latest revision as of 06:51, 31 October 2019

Notice of Availability of the Final Environmental Impact Statement for the Construction Permit for the Proposed Shine Medical Radioisotope Production Facility
ML15281A177
Person / Time
Site: SHINE Medical Technologies
Issue date: 10/16/2015
From: David Wrona
Division of License Renewal
To: Nelson R
US Advisory Council On Historic Preservation
Hoffman R,NRR/DLR,415-1107
References
DLR-15-0464
Download: ML15281A177 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Mr. Nelson:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

R. Nelson If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

As stated cc w/encls: Distribution List

ML15281A235 (Package) ML15281A177 (Letter)

ML15288A046 (Final EIS)

  • concurred via email RERB Technical BC:RERB:DLR OFFICE LA:DLR PM:RERB:DLR Staff Member NAME IBetts MMoser RHoffman DWrona DATE 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:

E-MAIL:

PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY:

Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Mr. Reid Nelson, Director Office of Federal Agency Programs Advisory Council on Historic Preservation 401 F Street NW, Suite 308 Washington, DC 20001-2637

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Mr. Nelson:

The U.S. Nuclear Regulatory Commission (NRC) has completed the enclosed final NUREG-2183, Environmental Impact Statement for the Construction Permit for the SHINE Radioisotope Production Facility, Final Report (final EIS) regarding the construction permit application for the SHINE Medical Technologies, Inc. (SHINE) Radioisotope Production Facility (SHINE facility) in accordance with the National Environmental Policy Act of 1969, as amended (NEPA). With this letter, I am forwarding you a copy of the final EIS.

In a letter dated May 13, 2015, the NRC submitted a copy of the draft EIS to your office. As documented in the draft EIS, NRC considered potential impacts to historic, archeological and cultural properties from construction, operation, and decommissioning activities associated with the proposed facility. In the context of NEPA, the NRC staff determined that any impacts from the proposed action on historical and archaeological resources located in the area of potential affect would be small. Under the provisions of the National Historic Preservation Act of 1966, the NRC staff determined that no historic properties would be affected by this undertaking. In preparing the final EIS, the NRC staff did not identify any new information that would change these findings.

R. Nelson If you have any questions regarding this matter, please contact Robert Hoffman, Environmental Scientist, at 301-415-1107 or by e-mail at Robert.Hoffman@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Update Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosure:

As stated cc w/encls: Distribution List

ML15281A235 (Package) ML15281A177 (Letter)

ML15288A046 (Final EIS)

  • concurred via email RERB Technical BC:RERB:DLR OFFICE LA:DLR PM:RERB:DLR Staff Member NAME IBetts MMoser RHoffman DWrona DATE 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT FOR THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:

E-MAIL:

PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RHoffman RidsAcrsAcnw_MailCTR Resource HARD COPY:

Laura Bub Environmental Analysis and Review Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713 Randy Howell National Nuclear Security Administration, NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585