ML112440292: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 14: Line 14:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:Page 1 of 2                                                                                    Vogtle 09/01/2011    08:50:56                                                          Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit        Planned Dates                                                                                                                                    No. of Staff Number        Start      End    Inspection Activity                                                              Title                                            on Site PSB1-RP        - RAD HAZARD ASSESSMENT AND INSTRUMENTS                                                                                  3 1, 2      09/19/2011  09/23/2011  IP 2515/179            Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1, 2      09/19/2011  09/23/2011  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2      09/19/2011  09/23/2011  IP 71124.05            Radiation Monitoring Instrumentation EB3 ISI        - UNIT 2 INSERVICE INSPECTION                                                                                            1 2      09/26/2011  09/30/2011  IP 7111108P            Inservice Inspection Activities - PWR EB3SGISI      - UNIT 2 SG INSERVICE INSPECTION                                                                                        1 2      09/26/2011  09/30/2011  IP 7111108P            Inservice Inspection Activities - PWR OL RQ          - REQUAL INSPECTION                                                                                                      6 1, 2      10/24/2011  10/28/2011  IP 7111111B            Licensed Operator Requalification Program OL EXAM        - INITIAL EXAM PREP                                                                                                      4 1          03/05/2012  03/09/2012      V23368              VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES PSB1EP        - EMERGENCY PREPAREDNESS EXERCISE                                                                                        3 1, 2      03/19/2012  03/23/2012  IP 7111401              Exercise Evaluation 1, 2      03/19/2012  03/23/2012  IP 7111404              Emergency Action Level and Emergency Plan Changes 1, 2      03/19/2012  03/23/2012  IP 71151                Performance Indicator Verification OL EXAM        - INITIAL EXAM - WEEK 1                                                                                                  4 1          03/26/2012  03/30/2012      V23368              VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES OL EXAM        - INITIAL EXAM - WEEK 2                                                                                                  4 1          04/09/2012  04/13/2012      V23368              VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES OL EXAM        - INITIAL EXAM - WEEK 3                                                                                                  4 1          04/16/2012  04/20/2012      V23368              VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES TI-177        - TI-177 GAS INTRUSION                                                                                                  3 1, 2      05/21/2012  05/25/2012  IP 2515/177            Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1-RP        - OCCUPATIONAL RP BASELINE WK1                                                                                          3 1, 2      09/17/2012  09/21/2012  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2      09/17/2012  09/21/2012  IP 71124.02            Occupational ALARA Planning and Controls 1, 2      09/17/2012  09/21/2012  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1, 2      09/17/2012  09/21/2012  IP 71124.04            Occupational Dose Assessment 1, 2      09/17/2012  09/21/2012  IP 71124.05            Radiation Monitoring Instrumentation 1, 2      09/17/2012  09/21/2012  IP 71151                Performance Indicator Verification EB3 ISI        - UNIT 1 INSERVICE INSPECTION                                                                                            1 1          09/24/2012  09/28/2012  IP 7111108P            Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.                                              Enclosure
Page 2 of 2                                                                                    Vogtle 09/01/2011    08:50:56                                                        Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit        Planned Dates                                                                                              No. of Staff Number        Start      End    Inspection Activity                                                              Title      on Site PSB1-RP        - OCCUPATIONAL RP BASELINE WK2                                                    3 1, 2      10/01/2012  10/05/2012  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1, 2      10/01/2012  10/05/2012  IP 71124.02            Occupational ALARA Planning and Controls 1, 2      10/01/2012  10/05/2012  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1, 2      10/01/2012  10/05/2012  IP 71124.04            Occupational Dose Assessment 1, 2      10/01/2012  10/05/2012  IP 71124.05            Radiation Monitoring Instrumentation 1, 2      10/01/2012  10/05/2012  IP 71151                Performance Indicator Verification EB3SGISI      - UNIT 1 SG INSERVICE INSPECTION                                                  1 1          10/03/2012  10/07/2012  IP 7111108P            Inservice Inspection Activities - PWR VOG TFPI      - TRIENNIAL FIRE PROTECTION INSPECTION                                            10 1, 2      11/26/2012  11/30/2012  IP 7111105T            Fire Protection [Triennial]
1, 2      12/10/2012  12/10/2012  IP 7111105T            Fire Protection [Triennial]
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.        Enclosure}}

Latest revision as of 16:19, 12 November 2019

Report 22 - Vogtle
ML112440292
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/01/2011
From:
NRC/RGN-II
To:
Shared Package
ML112440284 List:
References
Download: ML112440292 (2)


Text

Page 1 of 2 Vogtle 09/01/2011 08:50:56 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - RAD HAZARD ASSESSMENT AND INSTRUMENTS 3 1, 2 09/19/2011 09/23/2011 IP 2515/179 Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 1, 2 09/19/2011 09/23/2011 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/19/2011 09/23/2011 IP 71124.05 Radiation Monitoring Instrumentation EB3 ISI - UNIT 2 INSERVICE INSPECTION 1 2 09/26/2011 09/30/2011 IP 7111108P Inservice Inspection Activities - PWR EB3SGISI - UNIT 2 SG INSERVICE INSPECTION 1 2 09/26/2011 09/30/2011 IP 7111108P Inservice Inspection Activities - PWR OL RQ - REQUAL INSPECTION 6 1, 2 10/24/2011 10/28/2011 IP 7111111B Licensed Operator Requalification Program OL EXAM - INITIAL EXAM PREP 4 1 03/05/2012 03/09/2012 V23368 VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES PSB1EP - EMERGENCY PREPAREDNESS EXERCISE 3 1, 2 03/19/2012 03/23/2012 IP 7111401 Exercise Evaluation 1, 2 03/19/2012 03/23/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 03/19/2012 03/23/2012 IP 71151 Performance Indicator Verification OL EXAM - INITIAL EXAM - WEEK 1 4 1 03/26/2012 03/30/2012 V23368 VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 2 4 1 04/09/2012 04/13/2012 V23368 VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES OL EXAM - INITIAL EXAM - WEEK 3 4 1 04/16/2012 04/20/2012 V23368 VOGTLE / MARCH 2012 EXAM AT POWER FACILITIES TI-177 - TI-177 GAS INTRUSION 3 1, 2 05/21/2012 05/25/2012 IP 2515/177 Managing Gas Accumulation In Emergency Core Cooling, Decay Heat Removal & Containment Spray System PSB1-RP - OCCUPATIONAL RP BASELINE WK1 3 1, 2 09/17/2012 09/21/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 09/17/2012 09/21/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 09/17/2012 09/21/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 09/17/2012 09/21/2012 IP 71124.04 Occupational Dose Assessment 1, 2 09/17/2012 09/21/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 09/17/2012 09/21/2012 IP 71151 Performance Indicator Verification EB3 ISI - UNIT 1 INSERVICE INSPECTION 1 1 09/24/2012 09/28/2012 IP 7111108P Inservice Inspection Activities - PWR This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure

Page 2 of 2 Vogtle 09/01/2011 08:50:56 Inspection / Activity Plan Report 22 09/01/2011 - 12/31/2012 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PSB1-RP - OCCUPATIONAL RP BASELINE WK2 3 1, 2 10/01/2012 10/05/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/01/2012 10/05/2012 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/01/2012 10/05/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1, 2 10/01/2012 10/05/2012 IP 71124.04 Occupational Dose Assessment 1, 2 10/01/2012 10/05/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 10/01/2012 10/05/2012 IP 71151 Performance Indicator Verification EB3SGISI - UNIT 1 SG INSERVICE INSPECTION 1 1 10/03/2012 10/07/2012 IP 7111108P Inservice Inspection Activities - PWR VOG TFPI - TRIENNIAL FIRE PROTECTION INSPECTION 10 1, 2 11/26/2012 11/30/2012 IP 7111105T Fire Protection [Triennial]

1, 2 12/10/2012 12/10/2012 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures. Enclosure