{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION I==
475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406 1415
 
August 29, 2024
 
David Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)
Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555
 
SUBJECT: UPDATED INSPECTION PLAN FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2024 005 AND 05000318/2024 005)
 
==Dear David Rhoades:==
The enclosed inspection plan lists t he i nspections scheduled through June 30, 2026, for Calvert Cliffs Nu clear P ower P lant, Units 1 a nd 2. Th e NRC pr ovides the inspection plan to al low f or the resolution of any sch eduling conflicts and personnel ava ilability i ssues. Routine inspections performed by resident i nspectors a re not included in the i nspection pl an. The inspections l isted during the l ast 12 months of t he i nspection pl an are tentative and m ay be revised. The N RC w ill contact you as soon as p ossible to discuss ch anges t o t he i nspection pl an should circumstances w arrant any changes.
 
This l etter and i ts encl osure will be made ava ilable for publ ic i nspection and copying at http://www.nrc.gov/reading-rm/adams.html and at t he N RC P ublic Document R oom i n accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Please contact me at (610) 337 -5312 with any questions yo u have r egarding this letter.
 
Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety
 
Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69
 
Enclosure:
As stated
 
cc w/encl: Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2024 005 AND 05000318/2024 005) DATED AUGUST 29, 2024
 
DISTRIBUTION:
RLorson, RA (R1ORAMAIL RESOURCE)
DCollins, DRA (R1ORAMAIL RESOURCE)
BWelling, DORS (R1DORSMAIL RESOURCE)
RMckinley DORS (R1DORSMAIL RESOURCE)
PKrohn, DRSS (R1DRSSMAIL RESOURCE)
JZimmerman, DRSS (R1DRSS MAIL RESOURCE)
BBickett, DORS RClagg, DORS SQuiroga, DORS EDiPaolo, DORS, SRI ATran, DORS, RI CFragman, DORS, AA MSimmons, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO ROPassessment Resource
 
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -25 Second Quarter Process/Branch 3/2QAL_CC_ROP25.docx ADAMS Accession No. ML24240A198 SUNSI Review n -Sensitive Publvlle
 
Sensitive n -Publiclyvlable
 
OFFICE RI/DORS RI/DORS ME RClagg BBickett TE 8/ 4 27/24 OFFIAL RERD CO Site Inspection Activity Plan Calvert Cliffs
 
07/01/2024 - 06/30/2026
 
Unit Start End Activity CAC Title Staff Count
 
ISFSI Loading Campaign Inspection (60855) - CC 2
 
1,2 8/5/2024 9/30/2024 IP 60855 001001 Operation Of An ISFSI
 
EP Exercise Inspection - Calvert Cliffs 5
 
1,2 9/9/2024 9/13/2024 IP 71114.01 000716 Exercise Evaluation
 
1,2 9/9/2024 9/13/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
 
1,2 9/9/2024 9/13/2024 IP 71151 001397 Performance Indicator Verification
 
RP - 71124.06 RETS 1
 
1,2 9/9/2024 9/13/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
 
RP-71124.07-REMP and 71151 PIV 1
 
1,2 9/23/2024 9/27/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program
 
1,2 9/23/2024 9/27/2024 IP 71151 000746 Performance Indicator Verification
 
Inservice Inspection - Calvert Cliffs Unit 2 1
 
2 2/24/2025 3/7/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
 
RP-71124.01-RadHazard 1
 
2 3/3/2025 3/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
Access Control, Equipment, Sec Trng, Sec Plan Review, PI - CC 3
 
1,2 3/31/2025 4/4/2025 IP 71130.02 000734 Access Control
 
1,2 3/31/2025 4/4/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
 
1,2 3/31/2025 4/4/2025 IP 71130.07 000739 Security Training
 
1,2 3/31/2025 4/4/2025 IP 71130.09 001656 Security Plan Changes
 
1,2 3/31/2025 4/4/2025 IP 71151 001338 Performance Indicator Verification
 
Cyber Security - Calvert Cliffs 4
 
1,2 4/21/2025 4/25/2025 IP 71130.10 000741 Cybersecurity
 
2025 CC Initial Operator Licensing Exam 4
 
1,2 5/5/2025 5/9/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
 
1,2 6/23/2025 6/27/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
 
Comprehensive Engineering Team Inspection - Calvert Cliffs 7
 
1,2 6/9/2025 6/13/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
 
1,2 6/23/2025 6/27/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection
 
Material Control and Accounting - Calvert Cliffs 1
 
1,2 8/11/2025 8/15/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)
 
EP Program Inspection - Calvert Cliffs 2
 
1,2 9/8/2025 9/12/2025 IP 71114.02 000717 Alert and Notification System Testing
 
Prepared on 8/14/2024 2:22:33 PM 1 of 3 Site Inspection Activity Plan
 
1,2 9/8/2025 9/12/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
 
1,2 9/8/2025 9/12/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
 
1,2 9/8/2025 9/12/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness
 
1,2 9/8/2025 9/12/2025 IP 71151 001397 Performance Indicator Verification
 
RP-71124.08-Radwaste 1
 
1,2 9/22/2025 9/26/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation
 
PI&R Biennial Team Inspection - Calvert Cliffs 4
 
1,2 9/15/2025 9/19/2025 IP 71152B 000747 Problem Identification and Resolution
 
1,2 9/29/2025 10/3/2025 IP 71152B 000747 Problem Identification and Resolution
 
FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CC 5
 
1,2 10/6/2025 10/10/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
 
1,2 10/27/2025 10/31/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
 
RP-71124.05-Instrumentation and IP-71151-PIV 1
 
1,2 11/3/2025 11/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation
 
1,2 11/3/2025 11/7/2025 IP 71151 000746 Performance Indicator Verification
 
CC Requal Inspection with P/F Results 2
 
1,2 11/17/2025 11/21/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 11/17/2025 11/21/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
 
Inservice Inspection - Calvert Cliffs Unit 1 1
 
1 2/23/2026 3/6/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
 
Sec - AA, FFD - CC 2
 
1,2 1/26/2026 1/30/2026 IP 71130.01 000733 Access Authorization
 
1,2 1/26/2026 1/30/2026 IP 71130.08 000740 Fitness-For-Duty Program
 
1,2 2/23/2026 2/27/2026 IP 71130.01 000733 Access Authorization
 
1,2 2/23/2026 2/27/2026 IP 71130.08 000740 Fitness-For-Duty Program
 
RP - 71124.01 Rad Hazards 1
 
2 3/2/2026 3/6/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
Fire Protection - Calvert Cliffs 3
 
1,2 4/20/2026 4/24/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
 
1,2 5/4/2026 5/8/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
 
2026 CC Initial Operator Licensing Exam 4
 
1,2 5/4/2026 5/8/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
 
1,2 6/22/2026 6/26/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
 
RP - 71124.03 Airborne and 71124.04 Dose 1
 
Prepared on 8/14/2024 2:22:33 PM 2 of 3 Site Inspection Activity Plan
 
1,2 5/11/2026 5/15/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1,2 5/11/2026 5/15/2026 IP 71124.04 000728 Occupational Dose Assessment
 
Prepared on 8/14/2024 2:22:33 PM 3 of 3
}}
}}

Latest revision as of 23:05, 3 October 2024

Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005)
ML24240A198
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/29/2024
From: Brice Bickett
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2024005
Download: ML24240A198 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD, SUITE 102 KING OF PRUSSIA, PA 19406 1415

August 29, 2024

David Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT: UPDATED INSPECTION PLAN FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2024 005 AND 05000318/2024 005)

Dear David Rhoades:

The enclosed inspection plan lists t he i nspections scheduled through June 30, 2026, for Calvert Cliffs Nu clear P ower P lant, Units 1 a nd 2. Th e NRC pr ovides the inspection plan to al low f or the resolution of any sch eduling conflicts and personnel ava ilability i ssues. Routine inspections performed by resident i nspectors a re not included in the i nspection pl an. The inspections l isted during the l ast 12 months of t he i nspection pl an are tentative and m ay be revised. The N RC w ill contact you as soon as p ossible to discuss ch anges t o t he i nspection pl an should circumstances w arrant any changes.

This l etter and i ts encl osure will be made ava ilable for publ ic i nspection and copying at http://www.nrc.gov/reading-rm/adams.html and at t he N RC P ublic Document R oom i n accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at (610) 337 -5312 with any questions yo u have r egarding this letter.

Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety

Docket Nos. 05000317 and 05000318 License Nos. DPR-53 and DPR-69

Enclosure:

As stated

cc w/encl: Distribution via ListServ SUBJECT: UPDATED INSPECTION PLAN FOR CALVERT CLIFFS NUCLEAR POWER PLANT, UNITS 1 AND 2 (REPORT 05000317/2024 005 AND 05000318/2024 005) DATED AUGUST 29, 2024

DISTRIBUTION:

RLorson, RA (R1ORAMAIL RESOURCE)

DCollins, DRA (R1ORAMAIL RESOURCE)

BWelling, DORS (R1DORSMAIL RESOURCE)

RMckinley DORS (R1DORSMAIL RESOURCE)

PKrohn, DRSS (R1DRSSMAIL RESOURCE)

JZimmerman, DRSS (R1DRSS MAIL RESOURCE)

BBickett, DORS RClagg, DORS SQuiroga, DORS EDiPaolo, DORS, SRI ATran, DORS, RI CFragman, DORS, AA MSimmons, RI OEDO RidsNrrPMCalvertCliffs Resource RidsNrrDorlLpl1 Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO ROPassessment Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP -25 Second Quarter Process/Branch 3/2QAL_CC_ROP25.docx ADAMS Accession No. ML24240A198 SUNSI Review n -Sensitive Publvlle

Sensitive n -Publiclyvlable

OFFICE RI/DORS RI/DORS ME RClagg BBickett TE 8/ 4 27/24 OFFIAL RERD CO Site Inspection Activity Plan Calvert Cliffs

07/01/2024 - 06/30/2026

Unit Start End Activity CAC Title Staff Count

ISFSI Loading Campaign Inspection (60855) - CC 2

1,2 8/5/2024 9/30/2024 IP 60855 001001 Operation Of An ISFSI

EP Exercise Inspection - Calvert Cliffs 5

1,2 9/9/2024 9/13/2024 IP 71114.01 000716 Exercise Evaluation

1,2 9/9/2024 9/13/2024 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 9/9/2024 9/13/2024 IP 71151 001397 Performance Indicator Verification

RP - 71124.06 RETS 1

1,2 9/9/2024 9/13/2024 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

RP-71124.07-REMP and 71151 PIV 1

1,2 9/23/2024 9/27/2024 IP 71124.07 000731 Radiological Environmental Monitoring Program

1,2 9/23/2024 9/27/2024 IP 71151 000746 Performance Indicator Verification

Inservice Inspection - Calvert Cliffs Unit 2 1

2 2/24/2025 3/7/2025 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP-71124.01-RadHazard 1

2 3/3/2025 3/7/2025 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

Access Control, Equipment, Sec Trng, Sec Plan Review, PI - CC 3

1,2 3/31/2025 4/4/2025 IP 71130.02 000734 Access Control

1,2 3/31/2025 4/4/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1,2 3/31/2025 4/4/2025 IP 71130.07 000739 Security Training

1,2 3/31/2025 4/4/2025 IP 71130.09 001656 Security Plan Changes

1,2 3/31/2025 4/4/2025 IP 71151 001338 Performance Indicator Verification

Cyber Security - Calvert Cliffs 4

1,2 4/21/2025 4/25/2025 IP 71130.10 000741 Cybersecurity

2025 CC Initial Operator Licensing Exam 4

1,2 5/5/2025 5/9/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 6/23/2025 6/27/2025 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

Comprehensive Engineering Team Inspection - Calvert Cliffs 7

1,2 6/9/2025 6/13/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

1,2 6/23/2025 6/27/2025 IP 71111.21M 000713 Comprehensive Engineering Team Inspection

Material Control and Accounting - Calvert Cliffs 1

1,2 8/11/2025 8/15/2025 IP 71130.11 000742 Material Control and Accounting (MC&A)

EP Program Inspection - Calvert Cliffs 2

1,2 9/8/2025 9/12/2025 IP 71114.02 000717 Alert and Notification System Testing

Prepared on 8/14/2024 2:22:33 PM 1 of 3 Site Inspection Activity Plan

1,2 9/8/2025 9/12/2025 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1,2 9/8/2025 9/12/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1,2 9/8/2025 9/12/2025 IP 71114.05 000720 Maintenance of Emergency Preparedness

1,2 9/8/2025 9/12/2025 IP 71151 001397 Performance Indicator Verification

RP-71124.08-Radwaste 1

1,2 9/22/2025 9/26/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation

PI&R Biennial Team Inspection - Calvert Cliffs 4

1,2 9/15/2025 9/19/2025 IP 71152B 000747 Problem Identification and Resolution

1,2 9/29/2025 10/3/2025 IP 71152B 000747 Problem Identification and Resolution

FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - CC 5

1,2 10/6/2025 10/10/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

1,2 10/27/2025 10/31/2025 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

RP-71124.05-Instrumentation and IP-71151-PIV 1

1,2 11/3/2025 11/7/2025 IP 71124.05 000729 Radiation Monitoring Instrumentation

1,2 11/3/2025 11/7/2025 IP 71151 000746 Performance Indicator Verification

CC Requal Inspection with P/F Results 2

1,2 11/17/2025 11/21/2025 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1,2 11/17/2025 11/21/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Inservice Inspection - Calvert Cliffs Unit 1 1

1 2/23/2026 3/6/2026 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

Sec - AA, FFD - CC 2

1,2 1/26/2026 1/30/2026 IP 71130.01 000733 Access Authorization

1,2 1/26/2026 1/30/2026 IP 71130.08 000740 Fitness-For-Duty Program

1,2 2/23/2026 2/27/2026 IP 71130.01 000733 Access Authorization

1,2 2/23/2026 2/27/2026 IP 71130.08 000740 Fitness-For-Duty Program

RP - 71124.01 Rad Hazards 1

2 3/2/2026 3/6/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

Fire Protection - Calvert Cliffs 3

1,2 4/20/2026 4/24/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1,2 5/4/2026 5/8/2026 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

2026 CC Initial Operator Licensing Exam 4

1,2 5/4/2026 5/8/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)

1,2 6/22/2026 6/26/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)

RP - 71124.03 Airborne and 71124.04 Dose 1

Prepared on 8/14/2024 2:22:33 PM 2 of 3 Site Inspection Activity Plan

1,2 5/11/2026 5/15/2026 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1,2 5/11/2026 5/15/2026 IP 71124.04 000728 Occupational Dose Assessment

Prepared on 8/14/2024 2:22:33 PM 3 of 3