ENS 56645: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
| unit = 1
| unit = 1
| utype = W-4-LP
| utype = W-4-LP
| cfr = 10 CFR 50.72(b)(2)(iv)(B)
| cfr = 10 CFR 50.72(b)(2)(iv)(B), 10 CFR 50.72(b)(3)(iv)(A)
| emergency class = Non Emergency
| emergency class = Non Emergency
| notification date = 07/30/2023 18:20
| notification date = 07/30/2023 18:20
Line 21: Line 21:
This event is being reported pursuant to 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A).
This event is being reported pursuant to 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A).
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230731en.html#en56645
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2023/20230801en.html#en56645
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 14:57, 4 January 2024

ENS 56645 +/-
Where
Seabrook NextEra Energy icon.png
New Hampshire (NRC Region 1)
Reporting
10 CFR 50.72(b)(2)(iv)(B), RPS Actuation

10 CFR 50.72(b)(3)(iv)(A), System Actuation
Time - Person (Reporting Time:+-1.1 h-0.0458 days <br />-0.00655 weeks <br />-0.00151 months <br />)
Opened: Andrew Ferraioli
18:20 Jul 30, 2023
NRC Officer: Adam Koziol
Last Updated: Jul 30, 2023
56645 - NRC Website
Loading map...