                      *~                                                         TOLEDO                       i EDISON                       i A Centerior Energy Company 6 0001 January 8, 1993                                                                             -!
TOLEDO i
i KB93-0081 l
EDISON A Centerior Energy Company 6 0001 January 8, 1993 KB93-0081 i
Docket No. 50-346                                                                           -l
l Docket No. 50-346
                                                                                                            'l License No. NPF-3 U.S. Nuclear Regulatory Corrmission Document Control Desk Vashington, D.C.       20555 Gentlemen:
'l License No. NPF-3 U.S. Nuclear Regulatory Corrmission Document Control Desk Vashington, D.C.
20555 Gentlemen:
Monthly Operating Report December 1992 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1 for the month of December 1992.
Monthly Operating Report December 1992 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1 for the month of December 1992.
If you have any questions, please contact Bilal Sarsour at (419) 321-7384.
If you have any questions, please contact Bilal Sarsour at (419) 321-7384.
Very truly yours, V                    C)
Very truly yours, C)
M66<o.         [/ -(c9a/
. [/ -(c9 /
Louis F. Storz         h' Plant Manager Davis-Besse Nuclear Power Station
V M66<o a
              .BMS/ tid Enclosures cc:     Mr. A. B. Davis Regional Administrator, Region III Mr. J. B. Hopkins NRC Senior Project Manager Mr. S. Stasek NRC Senior Resident Inspector 4
Louis F. Storz h'
F 930121015e 921231                                                                       r PDR :ADOCK 05000346 R                     PDR
Plant Manager Davis-Besse Nuclear Power Station
.BMS/ tid Enclosures cc:
Mr. A. B. Davis Regional Administrator, Region III Mr. J. B. Hopkins NRC Senior Project Manager Mr. S. Stasek NRC Senior Resident Inspector 4
F r
930121015e 921231 PDR :ADOCK 05000346 PDR R


      .                                                AVERAGE D AILY UNIT POWER LEVEL DOCKET NO.         50-346 UNIT. Davis-Besse DATE January 8, 1993 COMPLETED BY Bilal Sarsour TELEPHONE (419)321-7384-MONT11 December 1992 DAY       AVER AGE DAILY POWER LEVEL                         DAY       AVERAGE DAILY POWER LEVEL (MWe Net)                                               (MWe-Net) g 885                                g7                   883 2
AVERAGE D AILY UNIT POWER LEVEL 50-346 DOCKET NO.
886                                ig                   887 886                               gg                    883 3
UNIT. Davis-Besse DATE January 8, 1993 COMPLETED BY Bilal Sarsour (419)321-7384-TELEPHONE December 1992 MONT11 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
4 887                                                     886 20 5                                                         21 6
(MWe-Net) 885 883 g
885                              ;)                     885 7
g7 886 2
887                                                      885 23 g                       886                                                      884 24 9                       887                              25                     888 10                         885                              26                     887 j                       885                              37                     886 12 884                              28                     885 13 880                                                      884' 79 34 875                              30                     884 15 876                              33                     883                                   ,
ig 887 886 883 3
16 880 INSTRUCTIONS On this tormat. list the werage daily umt power toelin MWe Net for each day in the reporting anonth. Compute to the nearest whole mepwatt.
gg 887 886 4
                                                                                                                            .(4 /77 )
20 5
21 885 6
;)
885 887 7
23 885 886 g
24 884 887 9
25 888 885 10 26 887 885 j
37 886 884 12 28 885 880 13 79 884' 875 34 30 884 876 15 33 883 880 16 INSTRUCTIONS On this tormat. list the werage daily umt power toelin MWe Net for each day in the reporting anonth. Compute to the nearest whole mepwatt.
.(4 /77 )


7                                                                                                                                     1 t
7 1
j r
t j
OPERATING DATA REPORT DOCKET NO. 50-346 DATE January 8. 1993 COMPLETED By .Bilal Sarsour TELEPil0NE (419)321-7384 1
r OPERATING DATA REPORT 50-346 DOCKET NO.
OPERATING STAlUS                                                                                                     j Davis-Besse fil                               Not'5
DATE January 8. 1993 COMPLETED By.Bilal Sarsour TELEPil0NE (419)321-7384 1
: 1. Unit Name:                                         _
OPERATING STAlUS j
Not'5 Davis-Besse fil
: 1. Unit Name:
December 1992
: 2. Reporting Period:
: 2. Reporting Period:
December 1992
2772
: 3. Licensed Thermal Power (MWt):
: 3. Licensed Thermal Power (MWt):
2772
925
: 4. Nameplate Rating (Gross MWe):                 925                                                                    ,
: 4. Nameplate Rating (Gross MWe):
906
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
906                                                                    l
921
: 6. Maximum Dependable Capacity (Gross MWe):
: 6. Maximum Dependable Capacity (Gross MWe):
921
877
: 7. Maximum Dependable Capacity (Net MWe):                 877
: 7. Maximum Dependable Capacity (Net MWe):
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Gise Reasons:
: 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Gise Reasons:
: 9. Power Lesel To Which Restricted,1f Any (Net MWe):
: 9. Power Lesel To Which Restricted,1f Any (Net MWe):
: 10. Reasons For Restrictions,if Any: _ _ _ _
: 10. Reasons For Restrictions,if Any: _ _ _ _
This Month             Yr. to-Date         Cumulatise i1. Hours in Reporting Period                                744.0             -8,784.0               126,433
This Month Yr. to-Date Cumulatise 744.0
: 12. Number Of Hours Reactor Was Critical 744.0               8.759.2               74,935 0.0                   24.8             5,532.0
-8,784.0 126,433 i1. Hours in Reporting Period 744.0 8.759.2 74,935
: 12. Number Of Hours Reactor Was Critical 0.0 24.8 5,532.0
: 13. Reactor Resene Shutdown Hours
: 13. Reactor Resene Shutdown Hours
: 14. Hours Generator On.Line                                 744.0               R 749.1             72.775.4
: 14. Hours Generator On.Line 744.0 R 749.1 72.775.4
: 15. Unit Resene Shutdown Hours                                 0.0                     0.0           1. 7 '! 2 . 5
: 15. Unit Resene Shutdown Hours 0.0 0.0
: 16. Gross Thermal Energy Generated lMWH)               2,059,707           24.069,830           180.679,123 17, Gross Electrical Energy Generated (MWH)                 690.676           8.038.936           59.917.111 IK Net Electrical Energy Generated (MWH)                   657,940           7,650.485-           56.442.973
: 1. 7 '! 2. 5
: 19. Unit Senice Factor                                        100.0                   99.5                   37.6 20.' Unit Availability Factor                                 100.0                   99,5                   58,9
: 16. Gross Thermal Energy Generated lMWH) 2,059,707 24.069,830 180.679,123 17, Gross Electrical Energy Generated (MWH) 690.676 8.038.936 59.917.111 IK Net Electrical Energy Generated (MWH) 657,940 7,650.485-56.442.973 100.0 99.5 37.6
: 21. Unit Capacity Factor (Using MDC Net)                      100.8                   99.3                   50.9-
: 19. Unit Senice Factor 20.' Unit Availability Factor 100.0 99,5 58,9 100.8 99.3 50.9-
: 22. Unit Capacity Factor (Using DER Net)                       97.6                   96.1                   49.3
: 21. Unit Capacity Factor (Using MDC Net) 97.6 96.1 49.3
: 23. Unit Forced Outage Rate                                     0.0                   0.47                   92.9
: 22. Unit Capacity Factor (Using DER Net)
.          24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each):
: 23. Unit Forced Outage Rate 0.0 0.47 92.9
: 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each):
Scheduled Maintenance and Refueling Outage - March 1, 1993 - June 1. 1993
Scheduled Maintenance and Refueling Outage - March 1, 1993 - June 1. 1993
: 25. If Snut Down At End Of Report Period. Estimated Date of Startup:
: 25. If Snut Down At End Of Report Period. Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):                       Forecast.           Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION (W77 ) .
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast.
Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION (W77 ).


tMIT SRL*TIO6etS AND POWER PIDUCTIcMS oocrrr no. 50-346       .
tMIT SRL*TIO6etS AND POWER PIDUCTIcMS 50-346 oocrrr no.
tMIT MAME Davis-Besse #1           ,
tMIT MAME Davis-Besse #1 care Januarv 8, 1993 COMPIITED BY Bilal Sarsour December 1992 g3,,,
care Januarv 8, 1993           .
arscRT Mcerm 4d caus. 6 Corr.etiv.
COMPIITED BY Bilal Sarsour arscRT Mcerm      December 1992                                                 g3,, ,
4 M
4d                                               &
o Licen=*e c
o                                                                    caus. 6 Corr.etiv.
7 t.
a M
a e o g;
                                                  *;                Licen=*e                         c   4
c Action to g
                      -        g;          c          t.                                   .      e o c U                        Action to No.         Date gg_
c U
o g    7 ",j
. f.
: m. o Event
p Event o
                                                                                          .g f.      p                      Prevent R.currence j0 e
,j g
m    ggg              ** Pert 8             gu         <,
m.
8 No significant sl:utdowns           or power reductions.
No.
                                                                    ' Method:
Date gg_
* Exhibit G - Instructior.s for Preparation of Data Ft Fotcod     Reason:
m Prevent R.currence
1-m nual                     Entry Sheets for Licensee Event Report (f.ER) 5: Scheduled   A-Equipment failure (Explain) 2-Manual Scram               File (NUREG-0161) fHisintenance or Test C-Refueling                                       3-Automatic Scram D-Regulatory RestIiction                         4-Conti.~ 4t bn from E-Operator Training E License Examination               Previous Month         Exhibit I - Same Source 5-toad Reduction
** Pert 8 gu e
* Report challenges to Power Operated Relief valves F-Adeinistrative 9-other (Explain)             (forts ) and Pressuriser Code Safety valves (PCSVs>
o j0 ggg 8
G-operational Error (Explain)
No significant sl:utdowns or power reductions.
' Method:
* Exhibit G - Instructior.s for Preparation of Data Ft Fotcod Reason:
1-m nual Entry Sheets for Licensee Event Report (f.ER) 5: Scheduled A-Equipment failure (Explain) fHisintenance or Test 2-Manual Scram File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory RestIiction 4-Conti.~ 4t bn from E-Operator Training E License Examination Previous Month Exhibit I - Same Source F-Adeinistrative 5-toad Reduction
* Report challenges to Power Operated Relief valves G-operational Error (Explain) 9-other (Explain)
(forts ) and Pressuriser Code Safety valves (PCSVs>
H-other (Explaini
H-other (Explaini


Line 98: Line 125:
After completion of turbine valve testing, reactor power was slowly increased =
After completion of turbine valve testing, reactor power was slowly increased =
to approximately 100 percent full power, which was achieved at 0300 hours on December 13, 1992;
to approximately 100 percent full power, which was achieved at 0300 hours on December 13, 1992;
  ~
~
          ' Reactor power was maintained at approximately 100-percent full power until 2130 hours on December 14, 1992, vhen reactor power was reduced to approximately 90 percent of full power when boric acid was inadvertently added to the reactor coolant system due to the boric acid pumps' pneumatic discharge-control valve (MU23) leakage.
' Reactor power was maintained at approximately 100-percent full power until 2130 hours on December 14, 1992, vhen reactor power was reduced to approximately 90 percent of full power when boric acid was inadvertently added to the reactor coolant system due to the boric acid pumps' pneumatic discharge-control valve (MU23) leakage.
At 0120 hours on Decemberf15, 1992, reactor pover vas slowly increased to-approximately 100 percent full power, which was achieved at 0500 hours on December 15, 1992, and maintained at this power level for the rest of the-month.}}
At 0120 hours on Decemberf15, 1992, reactor pover vas slowly increased to approximately 100 percent full power, which was achieved at 0500 hours on December 15, 1992, and maintained at this power level for the rest of the-month.}}

Latest revision as of 16:38, 12 December 2024

Monthly Operating Rept for Dec 1992 for Dbnps,Unit 1.W/
ML20127G136
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/31/1992
From: Sarsour B, Storz L
TOLEDO EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
KB93-0081, KB93-81, NUDOCS 9301210158
Download: ML20127G136 (5)


Text

_-

I t:

  • ~

TOLEDO i

EDISON A Centerior Energy Company 6 0001 January 8, 1993 KB93-0081 i

l Docket No. 50-346

'l License No. NPF-3 U.S. Nuclear Regulatory Corrmission Document Control Desk Vashington, D.C.

20555 Gentlemen:

Monthly Operating Report December 1992 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1 for the month of December 1992.

If you have any questions, please contact Bilal Sarsour at (419) 321-7384.

Very truly yours, C)

. [/ -(c9 /

V M66<o a

Louis F. Storz h'

Plant Manager Davis-Besse Nuclear Power Station

.BMS/ tid Enclosures cc:

Mr. A. B. Davis Regional Administrator, Region III Mr. J. B. Hopkins NRC Senior Project Manager Mr. S. Stasek NRC Senior Resident Inspector 4

F r

930121015e 921231 PDR :ADOCK 05000346 PDR R

AVERAGE D AILY UNIT POWER LEVEL 50-346 DOCKET NO.

UNIT. Davis-Besse DATE January 8, 1993 COMPLETED BY Bilal Sarsour (419)321-7384-TELEPHONE December 1992 MONT11 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 885 883 g

g7 886 2

ig 887 886 883 3

gg 887 886 4

20 5

21 885 6

)

885 887 7

23 885 886 g

24 884 887 9

25 888 885 10 26 887 885 j

37 886 884 12 28 885 880 13 79 884' 875 34 30 884 876 15 33 883 880 16 INSTRUCTIONS On this tormat. list the werage daily umt power toelin MWe Net for each day in the reporting anonth. Compute to the nearest whole mepwatt.

.(4 /77 )

7 1

t j

r OPERATING DATA REPORT 50-346 DOCKET NO.

DATE January 8. 1993 COMPLETED By.Bilal Sarsour TELEPil0NE (419)321-7384 1

OPERATING STAlUS j

Not'5 Davis-Besse fil

1. Unit Name:

December 1992

2. Reporting Period:

2772

3. Licensed Thermal Power (MWt):

925

4. Nameplate Rating (Gross MWe):

906

5. Design Electrical Rating (Net MWe):

921

6. Maximum Dependable Capacity (Gross MWe):

877

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Gise Reasons:
9. Power Lesel To Which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions,if Any: _ _ _ _

This Month Yr. to-Date Cumulatise 744.0

-8,784.0 126,433 i1. Hours in Reporting Period 744.0 8.759.2 74,935

12. Number Of Hours Reactor Was Critical 0.0 24.8 5,532.0
13. Reactor Resene Shutdown Hours
14. Hours Generator On.Line 744.0 R 749.1 72.775.4
15. Unit Resene Shutdown Hours 0.0 0.0
1. 7 '! 2. 5
16. Gross Thermal Energy Generated lMWH) 2,059,707 24.069,830 180.679,123 17, Gross Electrical Energy Generated (MWH) 690.676 8.038.936 59.917.111 IK Net Electrical Energy Generated (MWH) 657,940 7,650.485-56.442.973 100.0 99.5 37.6
19. Unit Senice Factor 20.' Unit Availability Factor 100.0 99,5 58,9 100.8 99.3 50.9-
21. Unit Capacity Factor (Using MDC Net) 97.6 96.1 49.3
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0 0.47 92.9
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each):

Scheduled Maintenance and Refueling Outage - March 1, 1993 - June 1. 1993

25. If Snut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast.

Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION (W77 ).

tMIT SRL*TIO6etS AND POWER PIDUCTIcMS 50-346 oocrrr no.

tMIT MAME Davis-Besse #1 care Januarv 8, 1993 COMPIITED BY Bilal Sarsour December 1992 g3,,,

arscRT Mcerm 4d caus. 6 Corr.etiv.

4 M

o Licen=*e c

7 t.

a e o g;

c Action to g

c U

. f.

p Event o

,j g

m.

No.

Date gg_

m Prevent R.currence

    • Pert 8 gu e

o j0 ggg 8

No significant sl:utdowns or power reductions.

' Method:

  • Exhibit G - Instructior.s for Preparation of Data Ft Fotcod Reason:

1-m nual Entry Sheets for Licensee Event Report (f.ER) 5: Scheduled A-Equipment failure (Explain) fHisintenance or Test 2-Manual Scram File (NUREG-0161)

C-Refueling 3-Automatic Scram D-Regulatory RestIiction 4-Conti.~ 4t bn from E-Operator Training E License Examination Previous Month Exhibit I - Same Source F-Adeinistrative 5-toad Reduction

  • Report challenges to Power Operated Relief valves G-operational Error (Explain) 9-other (Explain)

(forts ) and Pressuriser Code Safety valves (PCSVs>

H-other (Explaini

e m e.

OperationalfSummary December 1992 Reactor power was maintained at approximately 100 percent full power until 0002 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> on December 13, 1992~ when a manual power reduction to-approximately 93 percent of full power was initiated to performLturbine valve testing and control rod drive exercise' testing.

After completion of turbine valve testing, reactor power was slowly increased =

to approximately 100 percent full power, which was achieved at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> on December 13, 1992;

~

' Reactor power was maintained at approximately 100-percent full power until 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> on December 14, 1992, vhen reactor power was reduced to approximately 90 percent of full power when boric acid was inadvertently added to the reactor coolant system due to the boric acid pumps' pneumatic discharge-control valve (MU23) leakage.

At 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> on Decemberf15, 1992, reactor pover vas slowly increased to approximately 100 percent full power, which was achieved at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> on December 15, 1992, and maintained at this power level for the rest of the-month.