Line 19: |
Line 19: |
| {{#Wiki_filter:_- | | {{#Wiki_filter:_- |
| I t: | | I t: |
| I I
| | * ~ |
| *~ TOLEDO i EDISON i A Centerior Energy Company 6 0001 January 8, 1993 -!
| | TOLEDO i |
| i KB93-0081 l
| | EDISON A Centerior Energy Company 6 0001 January 8, 1993 KB93-0081 i |
| Docket No. 50-346 -l | | l Docket No. 50-346 |
| 'l License No. NPF-3 U.S. Nuclear Regulatory Corrmission Document Control Desk Vashington, D.C. 20555 Gentlemen:
| | 'l License No. NPF-3 U.S. Nuclear Regulatory Corrmission Document Control Desk Vashington, D.C. |
| | 20555 Gentlemen: |
| Monthly Operating Report December 1992 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1 for the month of December 1992. | | Monthly Operating Report December 1992 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1 for the month of December 1992. |
| If you have any questions, please contact Bilal Sarsour at (419) 321-7384. | | If you have any questions, please contact Bilal Sarsour at (419) 321-7384. |
| Very truly yours, V C) | | Very truly yours, C) |
| M66<o. [/ -(c9a/
| | . [/ -(c9 / |
| Louis F. Storz h' Plant Manager Davis-Besse Nuclear Power Station | | V M66<o a |
| .BMS/ tid Enclosures cc: Mr. A. B. Davis Regional Administrator, Region III Mr. J. B. Hopkins NRC Senior Project Manager Mr. S. Stasek NRC Senior Resident Inspector 4
| | Louis F. Storz h' |
| F 930121015e 921231 r PDR :ADOCK 05000346 R PDR | | Plant Manager Davis-Besse Nuclear Power Station |
| | .BMS/ tid Enclosures cc: |
| | Mr. A. B. Davis Regional Administrator, Region III Mr. J. B. Hopkins NRC Senior Project Manager Mr. S. Stasek NRC Senior Resident Inspector 4 |
| | F r |
| | 930121015e 921231 PDR :ADOCK 05000346 PDR R |
|
| |
|
| . AVERAGE D AILY UNIT POWER LEVEL DOCKET NO. 50-346 UNIT. Davis-Besse DATE January 8, 1993 COMPLETED BY Bilal Sarsour TELEPHONE (419)321-7384-MONT11 December 1992 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe-Net) g 885 g7 883 2
| | AVERAGE D AILY UNIT POWER LEVEL 50-346 DOCKET NO. |
| 886 ig 887 886 gg 883 3
| | UNIT. Davis-Besse DATE January 8, 1993 COMPLETED BY Bilal Sarsour (419)321-7384-TELEPHONE December 1992 MONT11 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) |
| 4 887 886 20 5 21 6
| | (MWe-Net) 885 883 g |
| 885 ;) 885 7
| | g7 886 2 |
| 887 885 23 g 886 884 24 9 887 25 888 10 885 26 887 j 885 37 886 12 884 28 885 13 880 884' 79 34 875 30 884 15 876 33 883 ,
| | ig 887 886 883 3 |
| 16 880 INSTRUCTIONS On this tormat. list the werage daily umt power toelin MWe Net for each day in the reporting anonth. Compute to the nearest whole mepwatt. | | gg 887 886 4 |
| .(4 /77 )
| | 20 5 |
| | 21 885 6 |
| | ;) |
| | 885 887 7 |
| | 23 885 886 g |
| | 24 884 887 9 |
| | 25 888 885 10 26 887 885 j |
| | 37 886 884 12 28 885 880 13 79 884' 875 34 30 884 876 15 33 883 880 16 INSTRUCTIONS On this tormat. list the werage daily umt power toelin MWe Net for each day in the reporting anonth. Compute to the nearest whole mepwatt. |
| | .(4 /77 ) |
|
| |
|
| 7 1 t | | 7 1 |
| j r
| | t j |
| OPERATING DATA REPORT DOCKET NO. 50-346 DATE January 8. 1993 COMPLETED By .Bilal Sarsour TELEPil0NE (419)321-7384 1 | | r OPERATING DATA REPORT 50-346 DOCKET NO. |
| OPERATING STAlUS j Davis-Besse fil Not'5 | | DATE January 8. 1993 COMPLETED By.Bilal Sarsour TELEPil0NE (419)321-7384 1 |
| : 1. Unit Name: _ | | OPERATING STAlUS j |
| | Not'5 Davis-Besse fil |
| | : 1. Unit Name: |
| | December 1992 |
| : 2. Reporting Period: | | : 2. Reporting Period: |
| December 1992
| | 2772 |
| : 3. Licensed Thermal Power (MWt): | | : 3. Licensed Thermal Power (MWt): |
| 2772
| | 925 |
| : 4. Nameplate Rating (Gross MWe): 925 , | | : 4. Nameplate Rating (Gross MWe): |
| | 906 |
| : 5. Design Electrical Rating (Net MWe): | | : 5. Design Electrical Rating (Net MWe): |
| 906 l
| | 921 |
| : 6. Maximum Dependable Capacity (Gross MWe): | | : 6. Maximum Dependable Capacity (Gross MWe): |
| 921
| | 877 |
| : 7. Maximum Dependable Capacity (Net MWe): 877 | | : 7. Maximum Dependable Capacity (Net MWe): |
| : 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Gise Reasons: | | : 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Gise Reasons: |
| : 9. Power Lesel To Which Restricted,1f Any (Net MWe): | | : 9. Power Lesel To Which Restricted,1f Any (Net MWe): |
| : 10. Reasons For Restrictions,if Any: _ _ _ _ | | : 10. Reasons For Restrictions,if Any: _ _ _ _ |
| This Month Yr. to-Date Cumulatise i1. Hours in Reporting Period 744.0 -8,784.0 126,433 | | This Month Yr. to-Date Cumulatise 744.0 |
| : 12. Number Of Hours Reactor Was Critical 744.0 8.759.2 74,935 0.0 24.8 5,532.0
| | -8,784.0 126,433 i1. Hours in Reporting Period 744.0 8.759.2 74,935 |
| | : 12. Number Of Hours Reactor Was Critical 0.0 24.8 5,532.0 |
| : 13. Reactor Resene Shutdown Hours | | : 13. Reactor Resene Shutdown Hours |
| : 14. Hours Generator On.Line 744.0 R 749.1 72.775.4 | | : 14. Hours Generator On.Line 744.0 R 749.1 72.775.4 |
| : 15. Unit Resene Shutdown Hours 0.0 0.0 1. 7 '! 2 . 5 | | : 15. Unit Resene Shutdown Hours 0.0 0.0 |
| : 16. Gross Thermal Energy Generated lMWH) 2,059,707 24.069,830 180.679,123 17, Gross Electrical Energy Generated (MWH) 690.676 8.038.936 59.917.111 IK Net Electrical Energy Generated (MWH) 657,940 7,650.485- 56.442.973 | | : 1. 7 '! 2. 5 |
| : 19. Unit Senice Factor 100.0 99.5 37.6 20.' Unit Availability Factor 100.0 99,5 58,9
| | : 16. Gross Thermal Energy Generated lMWH) 2,059,707 24.069,830 180.679,123 17, Gross Electrical Energy Generated (MWH) 690.676 8.038.936 59.917.111 IK Net Electrical Energy Generated (MWH) 657,940 7,650.485-56.442.973 100.0 99.5 37.6 |
| : 21. Unit Capacity Factor (Using MDC Net) 100.8 99.3 50.9-
| | : 19. Unit Senice Factor 20.' Unit Availability Factor 100.0 99,5 58,9 100.8 99.3 50.9- |
| : 22. Unit Capacity Factor (Using DER Net) 97.6 96.1 49.3 | | : 21. Unit Capacity Factor (Using MDC Net) 97.6 96.1 49.3 |
| : 23. Unit Forced Outage Rate 0.0 0.47 92.9 | | : 22. Unit Capacity Factor (Using DER Net) |
| . 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each):
| | : 23. Unit Forced Outage Rate 0.0 0.47 92.9 |
| | : 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each): |
| Scheduled Maintenance and Refueling Outage - March 1, 1993 - June 1. 1993 | | Scheduled Maintenance and Refueling Outage - March 1, 1993 - June 1. 1993 |
| : 25. If Snut Down At End Of Report Period. Estimated Date of Startup: | | : 25. If Snut Down At End Of Report Period. Estimated Date of Startup: |
| : 26. Units in Test Status (Prior to Commercial Operation): Forecast. Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION (W77 ) . | | : 26. Units in Test Status (Prior to Commercial Operation): |
| | Forecast. |
| | Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION (W77 ). |
|
| |
|
| tMIT SRL*TIO6etS AND POWER PIDUCTIcMS oocrrr no. 50-346 . | | tMIT SRL*TIO6etS AND POWER PIDUCTIcMS 50-346 oocrrr no. |
| tMIT MAME Davis-Besse #1 , | | tMIT MAME Davis-Besse #1 care Januarv 8, 1993 COMPIITED BY Bilal Sarsour December 1992 g3,,, |
| care Januarv 8, 1993 . | | arscRT Mcerm 4d caus. 6 Corr.etiv. |
| COMPIITED BY Bilal Sarsour arscRT Mcerm December 1992 g3,, , | | 4 M |
| 4d & | | o Licen=*e c |
| o caus. 6 Corr.etiv.
| | 7 t. |
| a M
| | a e o g; |
| *; Licen=*e c 4
| | c Action to g |
| - g; c t. . e o c U Action to No. Date gg_
| | c U |
| o g 7 ",j | | . f. |
| : m. o Event
| | p Event o |
| .g f. p Prevent R.currence j0 e
| | ,j g |
| m ggg ** Pert 8 gu <,
| | m. |
| 8 No significant sl:utdowns or power reductions. | | No. |
| ' Method:
| | Date gg_ |
| * Exhibit G - Instructior.s for Preparation of Data Ft Fotcod Reason: | | m Prevent R.currence |
| 1-m nual Entry Sheets for Licensee Event Report (f.ER) 5: Scheduled A-Equipment failure (Explain) 2-Manual Scram File (NUREG-0161) fHisintenance or Test C-Refueling 3-Automatic Scram D-Regulatory RestIiction 4-Conti.~ 4t bn from E-Operator Training E License Examination Previous Month Exhibit I - Same Source 5-toad Reduction | | ** Pert 8 gu e |
| * Report challenges to Power Operated Relief valves F-Adeinistrative 9-other (Explain) (forts ) and Pressuriser Code Safety valves (PCSVs> | | o j0 ggg 8 |
| G-operational Error (Explain)
| | No significant sl:utdowns or power reductions. |
| | ' Method: |
| | * Exhibit G - Instructior.s for Preparation of Data Ft Fotcod Reason: |
| | 1-m nual Entry Sheets for Licensee Event Report (f.ER) 5: Scheduled A-Equipment failure (Explain) fHisintenance or Test 2-Manual Scram File (NUREG-0161) |
| | C-Refueling 3-Automatic Scram D-Regulatory RestIiction 4-Conti.~ 4t bn from E-Operator Training E License Examination Previous Month Exhibit I - Same Source F-Adeinistrative 5-toad Reduction |
| | * Report challenges to Power Operated Relief valves G-operational Error (Explain) 9-other (Explain) |
| | (forts ) and Pressuriser Code Safety valves (PCSVs> |
| H-other (Explaini | | H-other (Explaini |
|
| |
|
Line 98: |
Line 125: |
| After completion of turbine valve testing, reactor power was slowly increased = | | After completion of turbine valve testing, reactor power was slowly increased = |
| to approximately 100 percent full power, which was achieved at 0300 hours on December 13, 1992; | | to approximately 100 percent full power, which was achieved at 0300 hours on December 13, 1992; |
| ~
| | ~ |
| ' Reactor power was maintained at approximately 100-percent full power until 2130 hours on December 14, 1992, vhen reactor power was reduced to approximately 90 percent of full power when boric acid was inadvertently added to the reactor coolant system due to the boric acid pumps' pneumatic discharge-control valve (MU23) leakage.
| | ' Reactor power was maintained at approximately 100-percent full power until 2130 hours on December 14, 1992, vhen reactor power was reduced to approximately 90 percent of full power when boric acid was inadvertently added to the reactor coolant system due to the boric acid pumps' pneumatic discharge-control valve (MU23) leakage. |
| At 0120 hours on Decemberf15, 1992, reactor pover vas slowly increased to-approximately 100 percent full power, which was achieved at 0500 hours on December 15, 1992, and maintained at this power level for the rest of the-month.}} | | At 0120 hours on Decemberf15, 1992, reactor pover vas slowly increased to approximately 100 percent full power, which was achieved at 0500 hours on December 15, 1992, and maintained at this power level for the rest of the-month.}} |
|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D5441999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Davis-Besse Nuclear Power Station.With ML20211R0811999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20210Q8541999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20209E6231999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195F4871999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20206M6341999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Davis-Besse Nuclear Station,Unit 1.With ML20205M2931999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Davis-Besse Nuclear Power Station.With ML20207J1461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20199E2501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20197J3441998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20195D0001998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20154H5801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20151W1611998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Dbnps.With ML20237B1681998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7451998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20249A4121998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7501998-04-30030 April 1998 Rev 2 to Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit ML20247F6721998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Davis-Bess Nuclear Power Station,Unit 1 ML20249A4141998-04-30030 April 1998 Revised Monthly Operating Rept for Apr 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216B4041998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20216C5131998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20202D3721998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20198K7931997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20203A3931997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Davis-Besse Nuclear Power Plant,Unit 1 ML20198S5371997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Davis-Besse Nuclear Power Station ML20217H7701997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20216H3261997-08-31031 August 1997 Monthly Operating Rept for August 1997 for DBNPS ML20217K0241997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Davis Besse Nuclear Power Station,Unit 1 ML20140H0441997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Davis-Besse Nuclear Power Station Unit 1 ML20141B9521997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Davis-Beese Nuclear Power Station Unit 1 ML20137T5271997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Davis-Besse Nuclear Power Station,Unit 1 ML20136G7221997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Davis-Besse Nuclear Station Unit 1 ML20134L9831997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Dbnps,Unit 1. W/Undated Ltr ML20133G0161996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20149M4071996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Davis-Besse Nuclear Power Station Unit 1 ML20134P9821996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20128Q0611996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Davis-Besse NPP, Unit 1 ML20117D5341996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20117D5411996-06-30030 June 1996 Revised MOR for June 1996 for Davis-Besse Nuclear Power Station,Unit 1 ML20116E0161996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Davis-Besse Nuclear Station Unit 1 ML20113B9111996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Davis-Beese Nuclear Power Station Unit 1 ML20117H7231996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Davis-Besse Unit 1 ML20112E6061996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for David-Besse Nuclear Power Station,Unit 1 ML20101G5251996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for DBNPS Unit 1 ML20149K7711996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Davis-Besse Nuclear Power Station.W/Undated Ltr ML20096C7971995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Davis-Besse Nuclear Power Station Unit 1 ML20095H3761995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Davis-Besse Nuclear Power Station Unit 1 ML20094L1041995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Davis-Besse Nuclear Power Station Unit 1 ML20093J2341995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Davis-Besse Nuclear Power Station ML20098A2651995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Davis-Besse Nuclear Power Station,Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K1231999-10-14014 October 1999 Revised Positions for DBNPS & PNPP QA Program ML20217D5441999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Davis-Besse Nuclear Power Station.With 05000346/LER-1998-011, :on 981014,manual Reactor Trip Occurred.Caused by Component Cooling Water Sys Leak.Breaker Being Installed Into D1 Bus cubicle.AACD1 Was Removed from Cubicle1999-09-0303 September 1999
- on 981014,manual Reactor Trip Occurred.Caused by Component Cooling Water Sys Leak.Breaker Being Installed Into D1 Bus cubicle.AACD1 Was Removed from Cubicle
ML20211R0811999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Davis-Besse Nuclear Power Station,Unit 1.With 05000346/LER-1999-003, :on 990727,failure to Perform Engineering Evaluation for Pressurizer Cooldown Rate Exceeding TS Limit Was Noted.Caused by Inadequate Procedural Guidance.Provided Required Reading for Operators.With1999-08-26026 August 1999
- on 990727,failure to Perform Engineering Evaluation for Pressurizer Cooldown Rate Exceeding TS Limit Was Noted.Caused by Inadequate Procedural Guidance.Provided Required Reading for Operators.With
ML20211B0271999-08-13013 August 1999 SER Accepting Second 10-year Interval Inservice Insp Requests for Relief RR-A16,RR-A17 & RR-B9 for Plant, Unit 1 ML20210Q8541999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20209E6231999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Davis-Besse Nuclear Power Station,Unit 1.With 05000346/LER-1998-013, :on 981105,safety Valve Rupture Disks May Induce Excessive Eccentric Loading of Pressurizer Vessel Nozzles.Caused by Failure of RCS Pressure Boundary.Plant Mod Was Implemented in May of 1999.With1999-06-24024 June 1999
- on 981105,safety Valve Rupture Disks May Induce Excessive Eccentric Loading of Pressurizer Vessel Nozzles.Caused by Failure of RCS Pressure Boundary.Plant Mod Was Implemented in May of 1999.With
ML20212H9961999-06-22022 June 1999 Safety Evaluation Supporting Amend 233 to License NPF-3 ML20195K2871999-06-16016 June 1999 Safety Evaluation Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves ML20207G6661999-06-0808 June 1999 Safety Evaluation Supporting Amend 232 to License NPF-3 ML20195F4871999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20206U7371999-05-19019 May 1999 Safety Evaluation Supporting Amend 231 to License NPF-3 ML20207E8011999-05-19019 May 1999 Non-proprietary Rev 2 to HI-981933, Design & Licensing Rept DBNPS Unit 1 Cask Pit Rack Installation Project ML20207F4351999-05-0404 May 1999 Rev 1 to DBNPS Emergency Preparedness Evaluated Exercise Manual 990504 ML20206M6341999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Davis-Besse Nuclear Station,Unit 1.With ML20205M2931999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Davis-Besse Nuclear Power Station.With 05000346/LER-1999-002, :on 990208,both Trains of Emergency Ventilation Sys Were Rendered Inoperable.Caused by Unattended Open Door. Door Was Immediately Closed Upon Discovery.With1999-03-0505 March 1999
- on 990208,both Trains of Emergency Ventilation Sys Were Rendered Inoperable.Caused by Unattended Open Door. Door Was Immediately Closed Upon Discovery.With
ML20207J1461999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Davis-Besse Nuclear Power Station,Unit 1.With ML20206U2441999-02-0909 February 1999 Safety Evaluation Supporting Amend 229 to License NPF-3 ML20199H5931999-01-20020 January 1999 Safety Evaluation Accepting Thermo-Lag Re Ampacity Derating Issues for Plant ML20204J6751998-12-31031 December 1998 1998 Annual Rept for Dbnps,Unit 1,PNPP,Unit 1 & BVPS Units 1 & 2 ML20199E2501998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20205K5781998-12-31031 December 1998 Waterhammer Phenomena in Containment Air Cooler Swss ML20206B0101998-12-31031 December 1998 1998 Annual Rept for Firstenergy Corp, for Perry Nuclear Power Plant & Davis-Besse Nuclear Power Station.Form 10-K Annual Rept to Us Securities & Exchange Commission for Fiscal Yr Ending 981231,encl ML20197J3441998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Davis-Besse Nuclear Power Station,Unit 1.With 05000346/LER-1998-012, :on 981018,reactor Trip Occurred from Approx 4% Power Due to ARTS Signal.Caused by Inadequate Design Drawing Resulting in Inadequate Procedure.Procedure Revised to Correct Deficiency.With1998-11-17017 November 1998
- on 981018,reactor Trip Occurred from Approx 4% Power Due to ARTS Signal.Caused by Inadequate Design Drawing Resulting in Inadequate Procedure.Procedure Revised to Correct Deficiency.With
05000346/LER-1998-009, :on 980909,RCS Pressurizer Spray Valve Was Not Functional with Two of Eight Body to Bonnet Nuts Missing. Caused by Less than Adequate Matl Separation Work Practices. Bonnet Nuts Replaced.With1998-11-13013 November 1998
- on 980909,RCS Pressurizer Spray Valve Was Not Functional with Two of Eight Body to Bonnet Nuts Missing. Caused by Less than Adequate Matl Separation Work Practices. Bonnet Nuts Replaced.With
05000346/LER-1998-011, :on 981014,manual RT Due to Ccws Leak Was Noted.Caused by Failure of One Letdown Cooler Rupture Disk. All Letdown Cooler Rupture Disks Were Replaced Prior to Plant Restart.With1998-11-13013 November 1998
- on 981014,manual RT Due to Ccws Leak Was Noted.Caused by Failure of One Letdown Cooler Rupture Disk. All Letdown Cooler Rupture Disks Were Replaced Prior to Plant Restart.With
ML20195D0001998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Davis-Besse Nuclear Power Station,Unit 1.With ML20155B6781998-10-28028 October 1998 Safety Evaluation Accepting Proposed Reduction in Commitment Changes in QA Program Matl Receipt Insp Process 05000346/LER-1998-010, :on 980924,manual Reactor Trip Was Noted.Caused by Misdiagnosed Failure of Main FW Control Valve Solenoid Valve.Faulty Solenoid valve,SVSP6B1,was Replaced & Tested. with1998-10-26026 October 1998
- on 980924,manual Reactor Trip Was Noted.Caused by Misdiagnosed Failure of Main FW Control Valve Solenoid Valve.Faulty Solenoid valve,SVSP6B1,was Replaced & Tested. with
05000346/LER-1998-008, :on 981001,documented Proceduralized Guidance for Initiation of Post LOCA B Dilution Flow Path.Caused by Design Analysis Oversight.Revised Procedures to Provide Active B Dilution Flow Path Guidance.With1998-10-0101 October 1998
- on 981001,documented Proceduralized Guidance for Initiation of Post LOCA B Dilution Flow Path.Caused by Design Analysis Oversight.Revised Procedures to Provide Active B Dilution Flow Path Guidance.With
ML20154H5801998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Davis-Besse Nuclear Power Station,Unit 1.With 05000346/LER-1998-007, :on 980824,CR Humidifier Ductwork Failure Caused Excessive Opening in Positive Pressure Boundary. Caused by Less than Adequate Fabrication.Evaluation of CR Humidifiers Conducted.With1998-09-22022 September 1998
- on 980824,CR Humidifier Ductwork Failure Caused Excessive Opening in Positive Pressure Boundary. Caused by Less than Adequate Fabrication.Evaluation of CR Humidifiers Conducted.With
ML20151W1611998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Dbnps.With 05000346/LER-1998-006, :on 980624,loss of Offsite Power Was Noted. Caused by Tornado Damage to Switchyard.Tested & Repaired Affected Electrical & Mechanical Equipment Necessary to Restore Two Offsite Power Sources1998-08-21021 August 1998
- on 980624,loss of Offsite Power Was Noted. Caused by Tornado Damage to Switchyard.Tested & Repaired Affected Electrical & Mechanical Equipment Necessary to Restore Two Offsite Power Sources
ML20237E3171998-08-21021 August 1998 ISI Summary Rept of Eleventh Refueling Outage Activities for Davis-Besse Nuclear Power Station ML20237B1681998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236U5011998-07-23023 July 1998 Special Rept:On 980624,Unit 1 Site Damaged by Tornado & High Winds.Alert Declared by DBNPS Staff,Dbnps Emergency Response Facilities Activiated & Special Insp Team Deployed to Site by Nrc,As Result of Event ML20236R1441998-07-15015 July 1998 SER Related to Quality Assurance Program Description Changes for Davis-Besse Nuclear Power Station,Unit 1 05000346/LER-1998-004, :on 980601,ductwork for Number 2 Control Room Humidifier Found Disconnected from Humidifier.Caused by Less than Adequate Connection at Humidifier Blower Housing. Ductwork Repaired1998-07-13013 July 1998
- on 980601,ductwork for Number 2 Control Room Humidifier Found Disconnected from Humidifier.Caused by Less than Adequate Connection at Humidifier Blower Housing. Ductwork Repaired
05000346/LER-1998-005, :on 980601,both Low Pressure Injection/Dhr Pumps Were Rendered Inoperable During Testing.Caused by Inadequate Self Checking,Communication & Procedure Usage Work Practices.Operations Mgt Reviewed Expectations1998-07-11011 July 1998
- on 980601,both Low Pressure Injection/Dhr Pumps Were Rendered Inoperable During Testing.Caused by Inadequate Self Checking,Communication & Procedure Usage Work Practices.Operations Mgt Reviewed Expectations
ML20236M9411998-07-0707 July 1998 Safety Evaluation Supporting Amend 225 to License NPF-3 ML20236K3981998-06-30030 June 1998 SER Accepting in Part & Denying in Part Relief Requests from Some of ASME Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Davis-Besse Nuclear Power Station,Unit 1 ML20236N7451998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Davis-Besse Nuclear Power Station,Unit 1 ML20236K4321998-06-30030 June 1998 Safety Evaluation Supporting Amend 224 to License NPF-03 ML20236K5131998-06-29029 June 1998 Safety Evaluation Accepting Proposed Alternate Emergency Operations Facility Location for Davis-Besse Nuclear Power Station,Unit 1 05000346/LER-1998-003, :on 980519,Mode 3 Entry Without Completion of Surveillance Requirement Occurred.Caused by Failure of I&C Technicians to Perform Each Sp as Written or Adherence. Revised Procedure1998-06-18018 June 1998
- on 980519,Mode 3 Entry Without Completion of Surveillance Requirement Occurred.Caused by Failure of I&C Technicians to Perform Each Sp as Written or Adherence. Revised Procedure
1999-09-30
[Table view] |
Text
_-
I t:
TOLEDO i
EDISON A Centerior Energy Company 6 0001 January 8, 1993 KB93-0081 i
l Docket No. 50-346
'l License No. NPF-3 U.S. Nuclear Regulatory Corrmission Document Control Desk Vashington, D.C.
20555 Gentlemen:
Monthly Operating Report December 1992 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit No. 1 for the month of December 1992.
If you have any questions, please contact Bilal Sarsour at (419) 321-7384.
Very truly yours, C)
. [/ -(c9 /
V M66<o a
Louis F. Storz h'
Plant Manager Davis-Besse Nuclear Power Station
.BMS/ tid Enclosures cc:
Mr. A. B. Davis Regional Administrator, Region III Mr. J. B. Hopkins NRC Senior Project Manager Mr. S. Stasek NRC Senior Resident Inspector 4
F r
930121015e 921231 PDR :ADOCK 05000346 PDR R
AVERAGE D AILY UNIT POWER LEVEL 50-346 DOCKET NO.
UNIT. Davis-Besse DATE January 8, 1993 COMPLETED BY Bilal Sarsour (419)321-7384-TELEPHONE December 1992 MONT11 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 885 883 g
g7 886 2
ig 887 886 883 3
gg 887 886 4
20 5
21 885 6
- )
885 887 7
23 885 886 g
24 884 887 9
25 888 885 10 26 887 885 j
37 886 884 12 28 885 880 13 79 884' 875 34 30 884 876 15 33 883 880 16 INSTRUCTIONS On this tormat. list the werage daily umt power toelin MWe Net for each day in the reporting anonth. Compute to the nearest whole mepwatt.
.(4 /77 )
7 1
t j
r OPERATING DATA REPORT 50-346 DOCKET NO.
DATE January 8. 1993 COMPLETED By.Bilal Sarsour TELEPil0NE (419)321-7384 1
OPERATING STAlUS j
Not'5 Davis-Besse fil
- 1. Unit Name:
December 1992
- 2. Reporting Period:
2772
- 3. Licensed Thermal Power (MWt):
925
- 4. Nameplate Rating (Gross MWe):
906
- 5. Design Electrical Rating (Net MWe):
921
- 6. Maximum Dependable Capacity (Gross MWe):
877
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Gise Reasons:
- 9. Power Lesel To Which Restricted,1f Any (Net MWe):
- 10. Reasons For Restrictions,if Any: _ _ _ _
This Month Yr. to-Date Cumulatise 744.0
-8,784.0 126,433 i1. Hours in Reporting Period 744.0 8.759.2 74,935
- 12. Number Of Hours Reactor Was Critical 0.0 24.8 5,532.0
- 13. Reactor Resene Shutdown Hours
- 14. Hours Generator On.Line 744.0 R 749.1 72.775.4
- 15. Unit Resene Shutdown Hours 0.0 0.0
- 1. 7 '! 2. 5
- 16. Gross Thermal Energy Generated lMWH) 2,059,707 24.069,830 180.679,123 17, Gross Electrical Energy Generated (MWH) 690.676 8.038.936 59.917.111 IK Net Electrical Energy Generated (MWH) 657,940 7,650.485-56.442.973 100.0 99.5 37.6
- 19. Unit Senice Factor 20.' Unit Availability Factor 100.0 99,5 58,9 100.8 99.3 50.9-
- 21. Unit Capacity Factor (Using MDC Net) 97.6 96.1 49.3
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0 0.47 92.9
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each):
Scheduled Maintenance and Refueling Outage - March 1, 1993 - June 1. 1993
- 25. If Snut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast.
Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION (W77 ).
tMIT SRL*TIO6etS AND POWER PIDUCTIcMS 50-346 oocrrr no.
tMIT MAME Davis-Besse #1 care Januarv 8, 1993 COMPIITED BY Bilal Sarsour December 1992 g3,,,
arscRT Mcerm 4d caus. 6 Corr.etiv.
4 M
o Licen=*e c
7 t.
a e o g;
c Action to g
c U
. f.
p Event o
,j g
m.
No.
Date gg_
m Prevent R.currence
o j0 ggg 8
No significant sl:utdowns or power reductions.
' Method:
- Exhibit G - Instructior.s for Preparation of Data Ft Fotcod Reason:
1-m nual Entry Sheets for Licensee Event Report (f.ER) 5: Scheduled A-Equipment failure (Explain) fHisintenance or Test 2-Manual Scram File (NUREG-0161)
C-Refueling 3-Automatic Scram D-Regulatory RestIiction 4-Conti.~ 4t bn from E-Operator Training E License Examination Previous Month Exhibit I - Same Source F-Adeinistrative 5-toad Reduction
- Report challenges to Power Operated Relief valves G-operational Error (Explain) 9-other (Explain)
(forts ) and Pressuriser Code Safety valves (PCSVs>
H-other (Explaini
e m e.
OperationalfSummary December 1992 Reactor power was maintained at approximately 100 percent full power until 0002 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> on December 13, 1992~ when a manual power reduction to-approximately 93 percent of full power was initiated to performLturbine valve testing and control rod drive exercise' testing.
After completion of turbine valve testing, reactor power was slowly increased =
to approximately 100 percent full power, which was achieved at 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> on December 13, 1992;
~
' Reactor power was maintained at approximately 100-percent full power until 2130 hours0.0247 days <br />0.592 hours <br />0.00352 weeks <br />8.10465e-4 months <br /> on December 14, 1992, vhen reactor power was reduced to approximately 90 percent of full power when boric acid was inadvertently added to the reactor coolant system due to the boric acid pumps' pneumatic discharge-control valve (MU23) leakage.
At 0120 hours0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> on Decemberf15, 1992, reactor pover vas slowly increased to approximately 100 percent full power, which was achieved at 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> on December 15, 1992, and maintained at this power level for the rest of the-month.