ML20263J080: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 15: | Line 15: | ||
| document type = DRAWINGS, DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S, ELECTRICAL DRAWINGS-APPLICANT'S FACILITY | | document type = DRAWINGS, DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S, ELECTRICAL DRAWINGS-APPLICANT'S FACILITY | ||
| page count = 1 | | page count = 1 | ||
| project = TAC:44673 | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:}} |
Latest revision as of 17:42, 14 March 2021
Letter Sequence Other | |
---|---|
TAC:44673, (Open) | |
Initiation
Administration Questions
Results
Other: ML20062A475, ML20204G206, ML20263D240, ML20263D295, ML20263D298, ML20263D301, ML20263D420, ML20263D425, ML20263D429, ML20263D430, ML20263D432, ML20263D440, ML20263D449, ML20263D456, ML20263D459, ML20263D463, ML20263D483, ML20263D494, ML20263D879, ML20263D883, ML20263D885, ML20263D888, ML20263D892, ML20263D894, ML20263D898, ML20263D901, ML20263D905, ML20263D908, ML20263D911, ML20263D913, ML20263D916, ML20263D918, ML20263D921, ML20263D924, ML20263D927, ML20263D930, ML20263D934, ML20263D938, ML20263D941, ML20263D944, ML20263D948, ML20263D951, ML20263D955, ML20263D957, ML20263D961, ML20263D965, ML20263D967, ML20263J056, ML20263J059, ML20263J062... further results | |
MONTHYEARML20263J0711972-07-10010 July 1972
[Table View]Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly D (48 of 50), as-built Project stage: Other ML20263J0731972-07-10010 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly a, as-built Project stage: Other ML20263J0781972-07-10010 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly C Project stage: Other ML20263J0751972-07-18018 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly B (46 of 50), as-built Project stage: Other ML20263J0831979-06-0606 June 1979 Piping & Instrument Diagram HP & Auxiliary Turbines System. Sheet 1 of 3.Revision Date Illegible Project stage: Other ML20263J0911980-04-21021 April 1980 Turbine Building Arfa II Conduit & Tray Arrangement Plan at Ground & Mezzanine Floor. Sheet 2 of 2 Project stage: Other ML20263J0951980-04-21021 April 1980 Plant Areas Conduit Arrangement Plan at Turbine Deck. Sheet 2 of 2 Project stage: Other ML20263J0991980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Mezzanine Floor. Sheet 2 of 2 Project stage: Other ML20263J1011980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Ground Floor. Sheet 1 of 1 Project stage: Other ML20263J1041980-04-21021 April 1980 Auxiliary Building Area - B Class II Conduits & Class I & II Tray Arrangement - Plan at Turbine Deck. Sheet 1 of 1 Project stage: Other ML20263J0631980-04-25025 April 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C Project stage: Other ML20263J1081980-08-10010 August 1980 Cm&D Equipment OTSG Level Sensing Project stage: Other ML20263J0861980-08-20020 August 1980 Figure 3.1-1 Auxiliary Feedwater System P&Jid Project stage: Other ML20263J0801980-09-0808 September 1980 Piping & Instrument Diagram HP & Auxiliary Turbines System. Revision Illegible Project stage: Other ML20263J0681980-09-10010 September 1980 885-NI/RPS - Schematic Main Feed Water Pump Trip Subassembly a Project stage: Other ML20263J0661980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly B Project stage: Other ML20263J0621980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly E Project stage: Other ML20263J0591980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C Project stage: Other ML20263J0561980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Sub Assembly Project stage: Other ML20263J1101981-02-20020 February 1981 EFIC Logic 1 Steam Generator a Level Input Project stage: Other ML20263J1141981-02-20020 February 1981 EFIC Logic 2 Steam Generator B Level Input Project stage: Other ML20263J1181981-02-20020 February 1981 EFIC Logic 3 Steam Generator Pressure Project stage: Other ML20263J1211981-02-20020 February 1981 Trip Logic Project stage: Other ML20263J1241981-02-20020 February 1981 EFIC Logic 6 Vector Logic Project stage: Other ML20263J1261981-02-20020 February 1981 EFIC Logic 12 Steam Generator Control Project stage: Other ML20263J1291981-02-20020 February 1981 EFIC Logic 5 Initiate Logic Project stage: Other ML20263J1321981-02-20020 February 1981 EFIC Trip Test Philosophy Project stage: Other ML20263J1421981-02-20020 February 1981 EFIC Symbology Project stage: Other ML20263J0881981-09-0808 September 1981 Anticipatory Reactor Trip System Instrument Installation. Sheet 1 of 2 Project stage: Other ML20263J1481981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 7.No Revision Date Project stage: Other ML20263J1531981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 6.No Revision Date Project stage: Other ML20062A4751982-07-27027 July 1982 Responds to NRC 820711 Telcon Re Annunciation of Manual Bypass of Auxiliary Feedwater Auto Initiation.New Control Sys Will Annunciate in Control Room When Auxiliary Feedwater Auto Initiator Is Bypassed Project stage: Other ML20058G7731982-07-27027 July 1982 Responds to NRC 820721 Request for Addl Info Re TMI Action Item II.E.1.2 Concerning Auxiliary Feedwater Sys Flow Indication.Currently Installed Indicator Will Be Replaced W/Safety Grade Differential Pressure Flow Indicator Project stage: Request ML20263D9651982-09-0101 September 1982 B&W Emergency Feedwater Initiation and Control System (EFIC) Wiring Diagram. Sheet 6 of 7.Consists of 3 Aperture Cards Project stage: Other ML20263D9611982-09-0101 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 5 of 7.Consists of 2 Aperture Cards Project stage: Other ML20263D9571982-09-0101 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 4 of 7.Consists of 2 Aperture Cards Project stage: Other ML20263D9671982-09-0101 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 7 of 7.Consists of 2 Aperture Cards Project stage: Other ML20263D9511982-09-0202 September 1982 B&W Emergency Feedwater Initiation and Control System (EFIC) Wiring Diagram. Sheet 2 of 7.Consists of 2 Aperture Cards Project stage: Other ML20263D9481982-09-0202 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 1 of 7.Consists of 2 Aperture Cards Project stage: Other ML20263D9551982-09-0606 September 1982 B&W Emergency Feedwater Initiation & Control System (EFIC) Wiring Diagram. Sheet 3 of 7.Consists of 2 Aperture Cards Project stage: Other ML20263D8831982-12-23023 December 1982 Marked-up Elem Diag Efic Matrix a Cont and EFW Act a, Interim Drawing.Sheet EF-15.No Revision Date Project stage: Other ML20263D8791982-12-23023 December 1982 Marked-up Elem Diag Mot Drvn Emg Fd Wtr PP3A (EFP-1) Auto Ckt, Interim Drawing.Sheet EF-14.No Revision Date Project stage: Other ML20263D4941982-12-23023 December 1982 Marked-up Elem Diag Mot Drvn Emg Fd PP3A(EFP-1) 416OV Es Swgr 3A & 3A3, Interim Drawing.Sheet EF-01B.No Revision Date. Actual Drawing Number Is B-208-026/EF-01B Project stage: Other ML20263D4831982-12-23023 December 1982 Marked-up Elem Diag Motor Driven Emerg Feed-PP3A, Interim Drawing.Sheet EF-01A.No Revision Date. Actual Drawing Number Is B-208-026/EF-01A Project stage: Other ML20263D4631982-12-23023 December 1982 Marked-up Elem Diag-Index Emergency Feedwater Sys, Interim Drawing.Sheet EF-00.No Revision Date Project stage: Other ML20263D4591982-12-23023 December 1982 Marked-up Alarm Point List Emergency Feedwater Sys, Interim Drawing.No Revision Date Project stage: Other ML20263D4561982-12-23023 December 1982 Marked-up Elem Diag Turb Driven Emer Feed Pp Inlet Iso Vlv ASV-5, Interim Drawing.Sheet AS-01.No Revision Date Project stage: Other ML20263D4491982-12-23023 December 1982 Marked-up Alarm Pt List Aux Steam Sys (As), Interim Drawing.No Revision Date Project stage: Other ML20263D4401982-12-23023 December 1982 Marked-up Elem Diag Main St Line Rupture Press Matrix Select I, Interim Drawing.Sheet FW-47.No Revision Date Project stage: Other ML20263D4321982-12-23023 December 1982 Marked-up Elem Diag Efic Matrices Stm Gen A/Act 1 Mn Stm and Mn Feedwater Isol, Interim Drawing.Sheet FW-58.No Revision Date Project stage: Other 1980-09-10 |
ML20263J080 | |
Person / Time | |
---|---|
Site: | Rancho Seco |
Issue date: | 09/08/1980 |
From: | BAILEY CONTROLS CO. (SUBS. OF BABCOCK & WILCOX CO.), SACRAMENTO MUNICIPAL UTILITY DISTRICT |
To: | SACRAMENTO MUNICIPAL UTILITY DISTRICT |
Shared Package | |
ML20010G015 | List:
|
References | |
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.1, TASK-2.E.1.2, TASK-2.K.2, TASK-TM M-530, TAC-44673, NUDOCS 8109230079 | |
Download: ML20263J080 (1) | |
Similar Documents at Rancho Seco | |
---|---|
Category:DRAWINGS
MONTHYEARML20265D0011988-01-19019 January 1988
[Table view]Drawing Change Notice 0AF to P&I Diagram Tdi Diesel Generator System - Train A. Sheet 1 of 2 ML20265D0051988-01-19019 January 1988 Drawing Change Notice 0AF to P&I Diagram Tdi Diesel Generator System - Train A. Sheet 2 of 2 ML20265D0101988-01-19019 January 1988 Drawing Change Notice 0N to P&I Diagram Tdi Diesel Generator System - Train B. Sheet 2 of 2 ML20265D0201988-01-19019 January 1988 Drawing Change Notice 0N to P&I Diagram Tdi Diesel Generator System - Train B. Sheet 1 of 2 ML20265C9971987-12-30030 December 1987 Drawing Change Notice 1AI to P&I Diagram Tdi Diesel Generator System - Train A. Sheet 1 of 1 ML20265D0151987-12-30030 December 1987 Drawing Change Notice 0S to P&I Diagram Tdi Diesel Generator System - Train B. Sheet 1 of 1 ML20265C9921987-10-31031 October 1987 Drawing Change Notice 1R to P&I Diagram Tdi Diesel Fuel Oil System. Sheet 1 of 1 ML20266J8931987-10-0101 October 1987 Drawing Change Notice 1AB to P&I Diagram Tdi Diesel Generator SYS-TRAIN A. Sheet 1 of 4 ML20259G1451987-06-0303 June 1987 Site Plan ML20266G0821987-04-28028 April 1987 Elementary Diagram:Electrical Auxiliaries. Sheet 2A.Rev Date Illegible ML20266G0771986-11-14014 November 1986 Elementary Diagram:Reactor Coolant Pump P-210A. Sheet 1 ML20266H6291986-10-0202 October 1986 Control Logic Diagram Diesel Generator System Jacket Water Keepwarm Pumps. Sheet 3.No Rev Date ML20266H4311986-10-0202 October 1986 Control Logic Diagram,New Diesel Fuel Oil System Alarms. No Rev Date ML20266H5251986-10-0202 October 1986 Control Logic Diagram,Diesel Gen Building HVAC Essential Control Room Ahu. No Rev Date ML20266H5281986-10-0202 October 1986 Control Logic Diagram Diesel Generator Building HVAC Normal Ahu. No Rev Date ML20266H5511986-10-0202 October 1986 Control Logic Diagram Diesel Gen Building HVAC Building Exhaust Fans. No Rev Date ML20266H5551986-10-0202 October 1986 Main One Line Diagram,Final Configuration,Sacramento Municipal Utility District ML20266H5591986-10-0202 October 1986 Grade Level Plan at El 0 Ft 0 Inches. No Rev Date ML20266H5641986-10-0202 October 1986 Mezzanine Level Plan at El 18 Ft 6 Inches. No Rev Date ML20266H5701986-10-0202 October 1986 Exterior Elevations. No Rev Date ML20266H6251986-10-0202 October 1986 Control Logic Diagram Diesel Generator System Lube Oil Keepwarm Pumps. Sheet 2.No Rev Date ML20266H6211986-10-0202 October 1986 Control Logic Diagram Diesel Generator Radiator Fans. Sheet 1.No Rev Date ML20266H6201986-10-0202 October 1986 Lighting & Communications Plan - Roof El 34 Ft 6 Inches. Sheet 3.No Rev Date ML20266H6161986-10-0202 October 1986 Lighting & Communication Radiator Yard Area. Sheet 5.No Rev Date ML20266H6131986-10-0202 October 1986 Lighting & Communications Plan El 18 Ft 6 Inches. Sheet 2. No Rev Date ML20266H6081986-10-0202 October 1986 Plot Plan Station Grounding. Sheet 2.Rev Date Illegible ML20266H6041986-10-0202 October 1986 Lighting & Communications Plan El 0 Ft 0 Inches. Sheet 1. No Rev Date ML20266H5851986-10-0202 October 1986 Site Plan. No Rev Date ML20266H5811986-10-0202 October 1986 Finish & Door Schedules and Details. No Rev Date ML20266H5681986-10-0202 October 1986 Roof Plan and Details. No Rev Date ML20266H5731986-10-0202 October 1986 Building Sections. No Rev Date ML20266H5771986-10-0202 October 1986 Door Plan and System Schedule. No Rev Date ML20266H5481986-09-15015 September 1986 P & I Diagram Diesel Generator System-Train B. Sheet 3 of 4 ML20266H5441986-09-15015 September 1986 P & I Diagram Diesel Generator System-Train A. Sheet 2 of 4 ML20266H5401986-09-15015 September 1986 P & I Diagram Diesel Generator Sustem-Train A. Sheet 1 of 4 ML20266H5351986-09-15015 September 1986 P & I Diagram New Diesel Fuel Oil System ML20266H4501986-09-15015 September 1986 P&I Diagram,Diesel Generator System - Train B. Sheet 4 of 4 ML20266H4401985-11-0404 November 1985 Wiring Diagram,Diesel Generator Bldg Fire Protection System. Sheet 23 ML20266H4441985-09-0101 September 1985 One Line Diagram,4160 Volt System. Sheet 8 ML20266H4561985-06-29029 June 1985 P & I Diagram Nseb,Tsc and DG Buildings,Fire Protection Water Systems. Sheet 2 ML20266H5061985-06-15015 June 1985 Exhaust Intake & Crankcase Vacuum Piping Schematic ML20261C3111985-04-0505 April 1985 One Line Diagram:480 Volt System. Sheet 8A.Rev Date Illegible ML20261C3151985-04-0505 April 1985 One Line Diagram:125 Volt DC System ML20266H5311984-10-18018 October 1984 P & I Diagram Diesel Generator Building HVAC Systems ML20264C8951984-07-0808 July 1984 Elementary Diagram:Reactor Auxiliaries. Sheet 9 ML20266H5221984-03-29029 March 1984 General Arrangement,Sacramento Municipal Utility District. Sheet 2 ML20266H4231984-03-21021 March 1984 Diesel Generator Building, as-built ML20261C3191984-02-0505 February 1984 One Line Diagram:120 Volt AC System. Sheet 1 ML20261C3061984-01-24024 January 1984 One Line Diagram:480 Volt System. Sheet 8 ML20266H5141984-01-18018 January 1984 Installation Drawing DSR-48 1988-01-19 Category:DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S MONTHYEARML20265D0011988-01-19019 January 1988
[Table view]Drawing Change Notice 0AF to P&I Diagram Tdi Diesel Generator System - Train A. Sheet 1 of 2 ML20265D0051988-01-19019 January 1988 Drawing Change Notice 0AF to P&I Diagram Tdi Diesel Generator System - Train A. Sheet 2 of 2 ML20265D0101988-01-19019 January 1988 Drawing Change Notice 0N to P&I Diagram Tdi Diesel Generator System - Train B. Sheet 2 of 2 ML20265D0201988-01-19019 January 1988 Drawing Change Notice 0N to P&I Diagram Tdi Diesel Generator System - Train B. Sheet 1 of 2 ML20265C9971987-12-30030 December 1987 Drawing Change Notice 1AI to P&I Diagram Tdi Diesel Generator System - Train A. Sheet 1 of 1 ML20265D0151987-12-30030 December 1987 Drawing Change Notice 0S to P&I Diagram Tdi Diesel Generator System - Train B. Sheet 1 of 1 ML20265C9921987-10-31031 October 1987 Drawing Change Notice 1R to P&I Diagram Tdi Diesel Fuel Oil System. Sheet 1 of 1 ML20266J8931987-10-0101 October 1987 Drawing Change Notice 1AB to P&I Diagram Tdi Diesel Generator SYS-TRAIN A. Sheet 1 of 4 ML20266H5481986-09-15015 September 1986 P & I Diagram Diesel Generator System-Train B. Sheet 3 of 4 ML20266H4501986-09-15015 September 1986 P&I Diagram,Diesel Generator System - Train B. Sheet 4 of 4 ML20266H5351986-09-15015 September 1986 P & I Diagram New Diesel Fuel Oil System ML20266H5401986-09-15015 September 1986 P & I Diagram Diesel Generator Sustem-Train A. Sheet 1 of 4 ML20266H5441986-09-15015 September 1986 P & I Diagram Diesel Generator System-Train A. Sheet 2 of 4 ML20266H4561985-06-29029 June 1985 P & I Diagram Nseb,Tsc and DG Buildings,Fire Protection Water Systems. Sheet 2 ML20266H5061985-06-15015 June 1985 Exhaust Intake & Crankcase Vacuum Piping Schematic ML20266H5311984-10-18018 October 1984 P & I Diagram Diesel Generator Building HVAC Systems ML20266H5111983-10-0606 October 1983 Lube Oil Piping Schematic ML20266H5091983-10-0404 October 1983 Jacket Water Piping Schematic ML20263T4991983-04-0606 April 1983 Auxiliary Feedwater System P&Id ML20262H6461982-08-0303 August 1982 P&I Diagram:Reactor Coolant System. Sheet 1 of 2 ML20262H6491982-08-0303 August 1982 P&I Diagram:Reactor Coolant System. Sheet 2 of 2 ML20262H6531982-06-15015 June 1982 Piping and Instrument Diagram Make-up and Purification System. Sheet 2 of 3 ML20262H6501982-06-15015 June 1982 Piping and Instrument Diagram:Make-up and Purification System. Sheet 1 of 3 ML20262H6581981-12-0101 December 1981 P&I Diagram:Decay Heat Removal System ML20262H6561981-07-27027 July 1981 Piping and Instrument Diagram:Make-up and Purification System. Sheet 3 of 3 ML20263T5041981-02-20020 February 1981 EFIC Organization ML20263J0801980-09-0808 September 1980 Piping & Instrument Diagram HP & Auxiliary Turbines System. Revision Illegible ML20263J0861980-08-20020 August 1980 Figure 3.1-1 Auxiliary Feedwater System P&Jid ML20263J0911980-04-21021 April 1980 Turbine Building Arfa II Conduit & Tray Arrangement Plan at Ground & Mezzanine Floor. Sheet 2 of 2 ML20263J0831979-06-0606 June 1979 Piping & Instrument Diagram HP & Auxiliary Turbines System. Sheet 1 of 3.Revision Date Illegible 1988-01-19 Category:ELECTRICAL DRAWINGS-APPLICANT'S FACILITY MONTHYEARML20266G0821987-04-28028 April 1987
[Table view]Elementary Diagram:Electrical Auxiliaries. Sheet 2A.Rev Date Illegible ML20266G0771986-11-14014 November 1986 Elementary Diagram:Reactor Coolant Pump P-210A. Sheet 1 ML20266H6131986-10-0202 October 1986 Lighting & Communications Plan El 18 Ft 6 Inches. Sheet 2. No Rev Date ML20266H6081986-10-0202 October 1986 Plot Plan Station Grounding. Sheet 2.Rev Date Illegible ML20266H6041986-10-0202 October 1986 Lighting & Communications Plan El 0 Ft 0 Inches. Sheet 1. No Rev Date ML20266H5551986-10-0202 October 1986 Main One Line Diagram,Final Configuration,Sacramento Municipal Utility District ML20266H6201986-10-0202 October 1986 Lighting & Communications Plan - Roof El 34 Ft 6 Inches. Sheet 3.No Rev Date ML20266H4401985-11-0404 November 1985 Wiring Diagram,Diesel Generator Bldg Fire Protection System. Sheet 23 ML20266H4441985-09-0101 September 1985 One Line Diagram,4160 Volt System. Sheet 8 ML20261C3151985-04-0505 April 1985 One Line Diagram:125 Volt DC System ML20261C3111985-04-0505 April 1985 One Line Diagram:480 Volt System. Sheet 8A.Rev Date Illegible ML20264C8951984-07-0808 July 1984 Elementary Diagram:Reactor Auxiliaries. Sheet 9 ML20261C3191984-02-0505 February 1984 One Line Diagram:120 Volt AC System. Sheet 1 ML20261C3061984-01-24024 January 1984 One Line Diagram:480 Volt System. Sheet 8 ML20261C3011984-01-0707 January 1984 One Line Diagram:480 Volt System. Sheet 1 ML20264C8941984-01-0303 January 1984 Schematic Diagram,Reactor Trip - Subassembly A. Sheet 1 ML20261C2971983-09-0707 September 1983 One Line Diagram:4160 Volt System. Sheet 2 ML20263M6301983-03-0909 March 1983 Tray Lay-out Fire Area 34. No Drawing Date ML20264C8971982-10-14014 October 1982 Schematic Diagram - Reactor Coolant Pump Monitor Channel - Subassembly a ML20264C8981982-10-14014 October 1982 Schematic Diagram Bistable Trip String,Module Interlock Test Trip Subassembly a ML20261C1311982-01-18018 January 1982 EFIC Logic 12 Steam Generator Control ML20263J1531981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 6.No Revision Date ML20263J1481981-09-0808 September 1981 One Line Diagram 4160 Volt System. Sheet 7.No Revision Date ML20263J0881981-09-0808 September 1981 Anticipatory Reactor Trip System Instrument Installation. Sheet 1 of 2 ML20263J1181981-02-20020 February 1981 EFIC Logic 3 Steam Generator Pressure ML20263J1421981-02-20020 February 1981 EFIC Symbology ML20263J1321981-02-20020 February 1981 EFIC Trip Test Philosophy ML20263J1291981-02-20020 February 1981 EFIC Logic 5 Initiate Logic ML20263J1261981-02-20020 February 1981 EFIC Logic 12 Steam Generator Control ML20263J1241981-02-20020 February 1981 EFIC Logic 6 Vector Logic ML20263J1211981-02-20020 February 1981 Trip Logic ML20263J1141981-02-20020 February 1981 EFIC Logic 2 Steam Generator B Level Input ML20263J1101981-02-20020 February 1981 EFIC Logic 1 Steam Generator a Level Input ML20262H6431980-10-14014 October 1980 Elementary Diagram:Reactor Auxiliaries. Sheet 65 ML20263J0561980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Sub Assembly ML20263J0681980-09-10010 September 1980 885-NI/RPS - Schematic Main Feed Water Pump Trip Subassembly a ML20263J0661980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly B ML20263J0591980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C ML20263J0621980-09-10010 September 1980 885-NI/RPS - Schematic Turbine Trip Subassembly E ML20263J0801980-09-0808 September 1980 Piping & Instrument Diagram HP & Auxiliary Turbines System. Revision Illegible ML20263J0861980-08-20020 August 1980 Figure 3.1-1 Auxiliary Feedwater System P&Jid ML20263J1081980-08-10010 August 1980 Cm&D Equipment OTSG Level Sensing ML20263J0631980-04-25025 April 1980 885-NI/RPS - Schematic Turbine Trip Subassembly C ML20263J0911980-04-21021 April 1980 Turbine Building Arfa II Conduit & Tray Arrangement Plan at Ground & Mezzanine Floor. Sheet 2 of 2 ML20263J0991980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Mezzanine Floor. Sheet 2 of 2 ML20263J1011980-04-21021 April 1980 Turbine Building Area Conduit & Tray Arrangement Plan at Ground Floor. Sheet 1 of 1 ML20263J1041980-04-21021 April 1980 Auxiliary Building Area - B Class II Conduits & Class I & II Tray Arrangement - Plan at Turbine Deck. Sheet 1 of 1 ML20263J0951980-04-21021 April 1980 Plant Areas Conduit Arrangement Plan at Turbine Deck. Sheet 2 of 2 ML20263J0831979-06-0606 June 1979 Piping & Instrument Diagram HP & Auxiliary Turbines System. Sheet 1 of 3.Revision Date Illegible ML20263J0751972-07-18018 July 1972 Schematic Diagram:Bistable Trip String,Module Interlock, Test Trip Subassembly B (46 of 50), as-built 1987-04-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20263J080&oldid=3215423"