ML20155J562: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20155J562
| number = ML20155J562
| issue date = 10/18/1988
| issue date = 10/18/1988
| title = Ack Receipt of 880712 Ltr Responding to 880613 Notice of Violations & Proposed Imposition of Civil Penalty.Violation Denied in Response Did,In Fact,Occur as Stated & Sufficient Basis Not Provided for Retraction of Violation
| title = Ack Receipt of Responding to 880613 Notice of Violations & Proposed Imposition of Civil Penalty.Violation Denied in Response Did,In Fact,Occur as Stated & Sufficient Basis Not Provided for Retraction of Violation
| author name = Lieberman J
| author name = Lieberman J
| author affiliation = NRC OFFICE OF SPECIAL PROJECTS
| author affiliation = NRC OFFICE OF SPECIAL PROJECTS
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = EA-88-094, EA-88-94, NUDOCS 8810260371
| document report number = EA-88-094, EA-88-94, NUDOCS 8810260371
| title reference date = 07-12-1988
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
Line 22: Line 23:
Division of UNC Resources, Inc.
Division of UNC Resources, Inc.
ATTN: Mr. N.C. Kaufman President l-      67 Sandy Desert Road Uncasville, Connecticut 06382 l        Gentlemen:
ATTN: Mr. N.C. Kaufman President l-      67 Sandy Desert Road Uncasville, Connecticut 06382 l        Gentlemen:
We have received your letter dated July 12, 1988, in response to the Notice of
We have received your {{letter dated|date=July 12, 1988|text=letter dated July 12, 1988}}, in response to the Notice of
;        Violations and Proposed Imposition of Civil Penalty sent to you with our letter dated June 13, 1988. Our letter and Notice described violations identified during the NRC inspection conducted during the period February 19 - March 18, 1988.
;        Violations and Proposed Imposition of Civil Penalty sent to you with our {{letter dated|date=June 13, 1988|text=letter dated June 13, 1988}}. Our letter and Notice described violations identified during the NRC inspection conducted during the period February 19 - March 18, 1988.
l        In your response to the Notice, you (1) provided a check for $12,500 in full payment of the civil penalty; and (2) denied one of the seven violations (Item E  '
l        In your response to the Notice, you (1) provided a check for $12,500 in full payment of the civil penalty; and (2) denied one of the seven violations (Item E  '
in the Notice). Af ter careful consideration of your response, and for the reasons discussed herein, we have concluded that the violation denied in your response did, in fact, occur as stated, and sufficient basis was not provided for retraction of the violation.
in the Notice). Af ter careful consideration of your response, and for the reasons discussed herein, we have concluded that the violation denied in your response did, in fact, occur as stated, and sufficient basis was not provided for retraction of the violation.

Latest revision as of 18:31, 9 December 2021

Ack Receipt of Responding to 880613 Notice of Violations & Proposed Imposition of Civil Penalty.Violation Denied in Response Did,In Fact,Occur as Stated & Sufficient Basis Not Provided for Retraction of Violation
ML20155J562
Person / Time
Site: 07000371
Issue date: 10/18/1988
From: Lieberman J
NRC OFFICE OF SPECIAL PROJECTS
To: Kaufman N
UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
References
EA-88-094, EA-88-94, NUDOCS 8810260371
Download: ML20155J562 (3)


Text

~ ~

/ o. UNITED STATES l 8 A NUCLEAR REGULATORY COMMISSION f <

,E wassinoic N. o. c. sosse

', OCTJ.8 M3 Docket No.70-371 License No SNM-368 EA 88-94 UNC Naval Products, Inc.

Division of UNC Resources, Inc.

ATTN: Mr. N.C. Kaufman President l- 67 Sandy Desert Road Uncasville, Connecticut 06382 l Gentlemen:

We have received your letter dated July 12, 1988, in response to the Notice of

Violations and Proposed Imposition of Civil Penalty sent to you with our letter dated June 13, 1988. Our letter and Notice described violations identified during the NRC inspection conducted during the period February 19 - March 18, 1988.

l In your response to the Notice, you (1) provided a check for $12,500 in full payment of the civil penalty; and (2) denied one of the seven violations (Item E '

in the Notice). Af ter careful consideration of your response, and for the reasons discussed herein, we have concluded that the violation denied in your response did, in fact, occur as stated, and sufficient basis was not provided for retraction of the violation.

With regard to Item E, you stated in your reply that the cited license section was not considered to apply to non-routine operations such as vacuum cleaner cleaning as discussed in urdocumented conversations with NRC licensing personnel. We are not aware of the undocumented conversations with NRC licen-sing personnel. Furthermore, whether or not this is a routine or non-routine operation is not the controlling issue. Due to improper hood face velocity measuretrents made by your staff, the hood was not effective as an engineering control device in controlling the generation of airborne contamination.

We have reviewed your corrective actions described in your response concerning the individual violations set forth in the Not :e and your plans for (1) per-forming an assessment of your radiation protecuen prooram, particularly, with regard to your performance iriprovement program, and (2) instituting appro,nriate corrective measures to upgrade the program based on the assessment findings.

No further response is reouired. These actions will be examined during a future inspection of your licensed facility.

8810260371 6:01018 PDR ADOCK 07000371 gg C PDC

&h

OCT 181988 UNC Naval Products, Inc. In accordance with Section 2.790 of the NaC's "Rules of Practice," Part 2 Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.

Your ccoperation with us is appricfated.

Sincerely, t

e -_ -- -

v James Lieberman, Director Office of Enforcement 4

i r

'l d

1

.)

a i  :

l l

l l

1

OCT Jg yggg UNC Naval Products, Inc.

- DISTRIBUTION:

Region I lEcket Room (with concurrences)

W. Russell, Regional Administrator, RI J. Allan, Deputy Regional Administrator, RI J. Gutierrez, Regional Attorney, RI l R. Cunningham, NMSS/DFCMACUS S. Ebneter, Director, DRSS R. Bellamy, Director, FRSSB W. Pasciak, Director, ERPS M. Shanbaky, Chief, FRPS J. Roth, Project Manager R. Loesch, FRPS -

J. Taylor, DEDO J. Lieberman, OE E. Flack, OE D. Holody, RI L. Chandler, OGC Enforcement Coordinators RII, RIII, RIV RV B. Hayes, 01 S. Connelly, 01 E. Jordan, AE0D F. Ingram, GP .

Public Document Room (PDR) localPublicDocumentRoom(LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut Day File EA File DCS l

l kW OE5km9 DD:0E 0: ?

EFlack HWong ilberman 10/n /88 10/ /3/88 1 'fi1/88 R2 %m W. Avl 94LA m(o nt n 6