| title = Partially Withheld Insp Repts 50-321/86-06 & 50-366/86-06 on 860224-28 & 0318-19 (Ref 10CFR2.790(d) & 73.21).Violations Noted:Inadequate Compensatory Measures Following Alarm Failure After Computer Malfunctions
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06
| author name = Masnyk O, Mcguire D, Thompson D
| author name = Grace J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| addressee name =  
| addressee name = Oreilly J
| addressee affiliation =  
| addressee affiliation = GEORGIA POWER CO.
| docket = 05000321, 05000366
| docket = 05000321, 05000366
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = 50-321-86-06, 50-321-86-6, 50-366-86-06, 50-366-86-6, NUDOCS 8606040098
| document report number = NUDOCS 8706100009
| package number = ML20198K649
| title reference date = 05-18-1987
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| package number = ML20214S839
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1
}}
}}
Line 19: Line 20:


=Text=
=Text=
{{#Wiki_filter:, p Keco SAFEGUARDS INFORMATION UNITED STATES
{{#Wiki_filter:=
,  o  NUCLEAR REGULATORY COMMISSION
  -,
*'
JUN 021987 Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 Georgia ATTN: Mr.Power James P.Conpany'Reilly O
= ,
Senior Vich President-Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
pf  REGloN li f, f 101 MARIETTA STREET. N *'  t  ATLANTA, GEORGIA 30323
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/86-06 AND 50-366/86-06
\.v / * ..*  MAY 281986 Report Nos. 50-321/86-06 and 50-366/86-06 Licensee: Georgia Power Company P. O. Box 4545 Atlanta, Georgia 30302 Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Facility Name: Hatch Inspection Dates: February 24-28 and March 18-19, 1986 Inspectors:  b bMl  / h O. M. Hasnyk, Physical Gecurity Specialist
      '
        ,
Thank you for your response of May 18, 1987, to our Notice of Violation issued on May 18, 1986, concerning activities conducted at your Hatch facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
Dat'a ' Signed ' Q A$ so H. Thomp on, P5ysical Security Specialist h
      '6at( Signed Approved by: A _ S  7 [2 D. R. McGuire, Chief, Physical Security Section ' 'Date Signed Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unannounced inspection entailed 62 inspector-hours on site (five hours on backshift) by two inspectors, accompanied by D. R. McGuire, Chief, Physical Security Section Chief, inspecting: Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Records and Reports; Physical Barriers - Protected Area; Lighting; Compensatory Measures; Assessment Aids; Access Control - Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids -
Protected Area; Alarm Stations; Communications; and Personnal Training and Qualificatio Results: The licensee was found to be in compliance with regulatory requirements with the following exceptions:
86-06-01 Failure to maintain adequate documentatio Inadequate compensatory measure at temporary protected area gg  barrie meica E8' 86-06-04 Inadequate security system compute N mo 86-06-05 Inadequate compensatory measures following loss of alarm capability mg  in both central and secondary alarm stations.


l $8 g 86-06-06 Failure to report security events.
Sincerely, J. Nelson Grace Regional Administrator cc: J. T. Beckham, Vice President, Plant Hatch H. C. Nix, Site Operations General Manager A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing bcc: NRC Resident Ins)ector Executive Secretary Hug NRR /DRIS/SBh S. Jordan, Document Control Desk (RIDS IE04), 016 State of' Georgia gg61gg O
 
gg, PDR-RII RII RII i i RI RII OMas lb oc DThompson M
i O l g, 86-06-07 Failure to perform functional test following security computer g system failur tectosuns: cc:rt Ai,y urEcunos inrowanou SAFEGUARDS INFORMAy.> - upoxar n u n onrnis PAGE15 DECONTROLLED.
DMcGuire lipe J hr g
FCantrell
,
05 y 87 05/34/87 05/p/87 05g /87 / /87 g//-/87 RII RII R '/ RII RI A
VBroVnlee t/
LRey>es G n ns
    @
    'R odda st _
  /p/87 / /87 g/87 0 W /87 0/f/87
}}
}}

Latest revision as of 07:24, 4 May 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06
ML20214S837
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/02/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20214S839 List:
References
NUDOCS 8706100009
Download: ML20214S837 (1)


Text

=

-,

JUN 021987 Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 Georgia ATTN: Mr.Power James P.Conpany'Reilly O

Senior Vich President-Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/86-06 AND 50-366/86-06

'

Thank you for your response of May 18, 1987, to our Notice of Violation issued on May 18, 1986, concerning activities conducted at your Hatch facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely, J. Nelson Grace Regional Administrator cc: J. T. Beckham, Vice President, Plant Hatch H. C. Nix, Site Operations General Manager A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing bcc: NRC Resident Ins)ector Executive Secretary Hug NRR /DRIS/SBh S. Jordan, Document Control Desk (RIDS IE04), 016 State of' Georgia gg61gg O

gg, PDR-RII RII RII i i RI RII OMas lb oc DThompson M

DMcGuire lipe J hr g

FCantrell

,

05 y 87 05/34/87 05/p/87 05g /87 / /87 g//-/87 RII RII R '/ RII RI A

VBroVnlee t/

LRey>es G n ns

@

'R odda st _

/p/87 / /87 g/87 0 W /87 0/f/87