ML20125D254: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20125D254
| number = ML20125D254
| issue date = 10/12/1979
| issue date = 10/12/1979
| title = Forwards New Proposed Schedule for Responding to IE Bulletin 79-14.Contrary to Date Stated in 790831 Ltr,Results of Analyses Re Accessible Piping Will Be Provided on 791026
| title = Forwards New Proposed Schedule for Responding to IE Bulletin 79-14.Contrary to Date Stated in ,Results of Analyses Re Accessible Piping Will Be Provided on 791026
| author name = Trimble D
| author name = Trimble D
| author affiliation = ARKANSAS POWER & LIGHT CO.
| author affiliation = ARKANSAS POWER & LIGHT CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = IEB-79-14, NUDOCS 8001140200
| document report number = IEB-79-14, NUDOCS 8001140200
| title reference date = 08-31-1979
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
Line 25: Line 26:
Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPA-51 IE Bulletin 79-14 (File: 2-1510)
Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPA-51 IE Bulletin 79-14 (File: 2-1510)
Gentlemen:
Gentlemen:
Due to the necessity of rewalking portions of Seismic Category I Piping at ANO-1, the stress analyses of " accessible" piping are not complete at this time. We will provide you with the results of these analyses October 26, 1979. This is a change in the schedule provided to you in our letter dated August 31, 1979.
Due to the necessity of rewalking portions of Seismic Category I Piping at ANO-1, the stress analyses of " accessible" piping are not complete at this time. We will provide you with the results of these analyses October 26, 1979. This is a change in the schedule provided to you in our {{letter dated|date=August 31, 1979|text=letter dated August 31, 1979}}.
In addition, we need to change the due dates of Items 3 and 4 in the above mentioned schedule.        Enclosure 1 is our new proposed schedule for responding to IE Bulletin 79-14. We regret this slippage, but the time required to perform the stress analyses proved to be greater than we had                  i predicted.                                                                                <
In addition, we need to change the due dates of Items 3 and 4 in the above mentioned schedule.        Enclosure 1 is our new proposed schedule for responding to IE Bulletin 79-14. We regret this slippage, but the time required to perform the stress analyses proved to be greater than we had                  i predicted.                                                                                <
1 Very truly yours,
1 Very truly yours,

Latest revision as of 20:44, 22 September 2022

Forwards New Proposed Schedule for Responding to IE Bulletin 79-14.Contrary to Date Stated in ,Results of Analyses Re Accessible Piping Will Be Provided on 791026
ML20125D254
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/12/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-79-14, NUDOCS 8001140200
Download: ML20125D254 (2)


Text

~'

" FUK:hy .

. I LPDR e .e f 1 r ..

sjic j h _

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (5011371-.".000 October 12, 1979 l-109-13 Mr. K. V. Seyfrit, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Comission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Subject:

Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPA-51 IE Bulletin 79-14 (File: 2-1510)

Gentlemen:

Due to the necessity of rewalking portions of Seismic Category I Piping at ANO-1, the stress analyses of " accessible" piping are not complete at this time. We will provide you with the results of these analyses October 26, 1979. This is a change in the schedule provided to you in our letter dated August 31, 1979.

In addition, we need to change the due dates of Items 3 and 4 in the above mentioned schedule. Enclosure 1 is our new proposed schedule for responding to IE Bulletin 79-14. We regret this slippage, but the time required to perform the stress analyses proved to be greater than we had i predicted. <

1 Very truly yours,

. v pavidC.Trimble v' Manager, Licensing DCT:M0W:nak ,

Enclosure ec: Mr. Victor Stello, Jr., Director Mr. Norman C. Moseley, Director Office of Inspection and Enforcement Division of Reactor Operations U.S. Nuclear Regulatory Commission Inspection l Washington, D.C. 20555 Nuclear Regulatory Commission 4350 East West Highway l Mr. W. D. Johnson Bethesda, Maryland 20555 l U.S. Nuclear Regulatory Commission Post Office Boy. 2090 Russellville, Arkansas 72801 8 0 01 140 JLOO  ;

vs .esm::.s s:_

_ _ ss s-s ..

Q

~,

~

J' t

ENCLOSURE 1

1. By September 14, 1979 - (Complete)

Update all stress isometrics for " accessible" piping (Located outside the Reactor Building), make a detailed comparison with seismic calcu- i lations and determine whether or not any calculations need to be rerun.

Submit a list of items to be reanaly:ed and justification for all non-  !

conformances that are satisfactory. I

2. By October 26, 1979- d Complete all stress analysis work determined to be necessary under (1) -,

above.

i

3. By November 26, 1979 Update all stress isometrics for " inaccessible" piping (Located inside the Reactor Building), make a detailed comparison with seismic calcula-tions, and determine whether or not any calculations need to be rerun.

Submit a list of items to be reanaly:ed and justification for all non-conformances that are satisfactory.

4. By December 21, 1979 Complete all stress analysis work determined to be necessary under (3) above, and submit reports required by ISE Bulletin 79-14 Item 4.

90017013 l

l