ML20066D319: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:r Revision 1 - 1/8/82 - | ||
OPERATING DATA REPORT , | |||
DOCKET NO. 50-346 DATE _J_antiarv 8,19S2 COh!PLETED BY Biln1 Sarsour TELEP110NE 419-2 59-5000, E:<t. | |||
251 OPER ATING STATUS Davis-Besse Unit 1 Notes | |||
: 1. Unit Name: | |||
: 2. Reporting Period: February, 1981 | |||
: 3. Licensed Thermal Powcr (.\ !Wt): 2772 | |||
: 4. Nameplate Rating (Gross 51We): 925 | |||
: 5. Design Electrical Rating (Net SIWE): 906 | |||
: 6. Maximum Dependable Capacity (Gross 31Wel: 918 g | |||
: 7. Stasimum Dependable Capacity (Net 51We): 874 | |||
~ | |||
: 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Give Reasons: | |||
: 9. Power Lesel To Which Restricted. If Any (Net SIWE): | |||
: 10. Reasons For Restrictions.If Any: | |||
This Month Yr.-to-Date Cumulative II. Hours In Reporting Period 672 1,416 22;657 | |||
~ | |||
: 12. Number Of Hours Reactor Was Critical 619 753 10,835.6 | |||
: 13. Reactor Reserve Shutdown Hours 0 0 2,478.6 | |||
: 14. Hours Generator On.Line 608.1 736.0 10,078.3 | |||
: 15. Unit Rewne Shutdown Hours 0 0 1.731.4 | |||
* 1,604,655 1,796,528 22,885,030 . | |||
: 16. Gross Thermal Energy Generated (.\lWH) 1 17. Gross Electrical Energy Generated (51WHi 540,284 ,_, 602,718 7,629,871 | |||
: 18. Net Electrical Energy Generated (51WH) 512,173 563.902 '7,097,751 | |||
: 19. Unit Senice Factor 90.5 52.0 44.5 | |||
: 20. Unit Asailability Factor 90.5 52.0 52.1 | |||
: 21. Unit Capacity Factor (Using 51DC Net) 85.6 _ | |||
44.7 35.8 | |||
: 22. Unit Capacity Factor (Using DER Net) , | |||
84.1 44 34.6 | |||
: 23. Unit Forced Outage Rate 9.5 48.0 27.4 | |||
: 24. Shutdowns Scheduled Oser Next 6 5tonths (T3pe.Date.and Duration of Each : . | |||
: 25. If Shut Duan At Erid Of Report Period. Estimated Date of Startup: | |||
: 26. Units in Test Status (Prior :o Commercial Operationi: Force:.st Achiesed INITI A L CRITICA LITY INITIAL ELECTRICITY CO\lNIEftCIA1. OPER ATION 8211110280 820108 | |||
; R PDR ADOCK 05000346 ("/773 PDR L}} |
Latest revision as of 16:02, 21 December 2020
ML20066D319 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 01/08/1982 |
From: | Sarsour B TOLEDO EDISON CO. |
To: | |
Shared Package | |
ML20066D281 | List: |
References | |
NUDOCS 8211110280 | |
Download: ML20066D319 (1) | |
Text
r Revision 1 - 1/8/82 -
OPERATING DATA REPORT ,
DOCKET NO. 50-346 DATE _J_antiarv 8,19S2 COh!PLETED BY Biln1 Sarsour TELEP110NE 419-2 59-5000, E:<t.
251 OPER ATING STATUS Davis-Besse Unit 1 Notes
- 1. Unit Name:
- 2. Reporting Period: February, 1981
- 3. Licensed Thermal Powcr (.\ !Wt): 2772
- 4. Nameplate Rating (Gross 51We): 925
- 5. Design Electrical Rating (Net SIWE): 906
- 6. Maximum Dependable Capacity (Gross 31Wel: 918 g
- 7. Stasimum Dependable Capacity (Net 51We): 874
~
- 8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Lesel To Which Restricted. If Any (Net SIWE):
- 10. Reasons For Restrictions.If Any:
This Month Yr.-to-Date Cumulative II. Hours In Reporting Period 672 1,416 22;657
~
- 12. Number Of Hours Reactor Was Critical 619 753 10,835.6
- 13. Reactor Reserve Shutdown Hours 0 0 2,478.6
- 14. Hours Generator On.Line 608.1 736.0 10,078.3
- 15. Unit Rewne Shutdown Hours 0 0 1.731.4
- 1,604,655 1,796,528 22,885,030 .
- 16. Gross Thermal Energy Generated (.\lWH) 1 17. Gross Electrical Energy Generated (51WHi 540,284 ,_, 602,718 7,629,871
- 18. Net Electrical Energy Generated (51WH) 512,173 563.902 '7,097,751
- 19. Unit Senice Factor 90.5 52.0 44.5
- 20. Unit Asailability Factor 90.5 52.0 52.1
- 21. Unit Capacity Factor (Using 51DC Net) 85.6 _
44.7 35.8
- 22. Unit Capacity Factor (Using DER Net) ,
84.1 44 34.6
- 23. Unit Forced Outage Rate 9.5 48.0 27.4
- 24. Shutdowns Scheduled Oser Next 6 5tonths (T3pe.Date.and Duration of Each : .
- 25. If Shut Duan At Erid Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior :o Commercial Operationi: Force:.st Achiesed INITI A L CRITICA LITY INITIAL ELECTRICITY CO\lNIEftCIA1. OPER ATION 8211110280 820108