ML20066D372: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.                                                                                                  .
        .-                                                                                                  Revision 1.-        1/8/82 OPERATING DATA REPORT DOCRET NO.
DATE 2anuarv 1          8, 1982 COSIPLETED IiY Bilal Sarsour TELEPliONE M19 ) 259-5000 Ext.
251 OPERATING STATUS
                          ,      Davis-Besse Unit #1                                  Notes April, 1981
: 2. Reporting Period:
: 3. Licensed Thermal Power (51Wt):
2772                          ,
: 4. Nameplate Rating (Gross SIWE):
925
: 5. Design Electrica! Rating (Net SIWE):
906
: 6. Maximum Dependable Capacity (Gross SIWE):          918 1
: 7. Masimum Dependable Capacity (Net 51We):            874
  .            8. If Chanys Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:
: 9. Power Level To which Restricted. If Any (Net SIWE):
: 10. Reasons For Restrictions.lf Any:
This Month            Yr to.Date            Cumulative 719                    2,879                24'.120
: 11. Ilours in Reporting Period
: 12. Number OfIlours Reactor Was Critical 69.5                    1,731.7            3 3,g3 4 ;            -
0                        34.8              2,513.4
: 13. Reactor Renrve Shutdown flours
: 14. Ilours Generator On-Line                              240.8                  1,593.4              10,935.7
: 15. Unit Reserve Shutdown I!ours                            0                          0                1,731.4 509,605              3,743,803          24,832.305 1          16. Gross Thermal Energy Generated (51Wil)
: 17. Gross Electrical Energy Generated IMWil) 170,048          ,
1,250,814            8.277.967 IS. Net Electrical Energy Generated (MWil) 155,299              1,165,669            7.699.518
: 19. Unit Service Factor                                    33.5                      55.3                    45.3
: 20. Unit Asailability Factor                                33.5                      55.3                    52.5
: 21. Unit Capacity Factor (Using MDC Net)              _
24.3                      45.5                    36.5
: 22. Unit Capacitv Factor IU>ing DER Net)                    23.8                      44.7                    35.2
: 23. Unit Forced Outage Rate
                                                                .        7.0                      34.1                    26.6
: 24. Shutdowns Scheduled Oser Next 6 Months (Ty pe. Date.and Duration of Each t:
B
: 25. If Shut Down At End Of Report Period. Estimated Date of St.'rtup:
: 26. Units in Test Status (Prior to Commercial Operation):                      Forecast              Achiesed INITI \ L CRITICA LITY INillAL ELECTRICITY COM\lERCI4L OPERATION 8211110303 820108 PDR ADOCK 05000346                                                                                                ("/771 R                          PDR
                                                                                  .}}

Latest revision as of 15:49, 21 December 2020

to Monthly Operating Rept for Apr 1981
ML20066D372
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1982
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20066D281 List:
References
NUDOCS 8211110303
Download: ML20066D372 (1)


Text

. .

.- Revision 1.- 1/8/82 OPERATING DATA REPORT DOCRET NO.

DATE 2anuarv 1 8, 1982 COSIPLETED IiY Bilal Sarsour TELEPliONE M19 ) 259-5000 Ext.

251 OPERATING STATUS

, Davis-Besse Unit #1 Notes April, 1981

2. Reporting Period:
3. Licensed Thermal Power (51Wt):

2772 ,

4. Nameplate Rating (Gross SIWE):

925

5. Design Electrica! Rating (Net SIWE):

906

6. Maximum Dependable Capacity (Gross SIWE): 918 1
7. Masimum Dependable Capacity (Net 51We): 874

. 8. If Chanys Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Level To which Restricted. If Any (Net SIWE):
10. Reasons For Restrictions.lf Any:

This Month Yr to.Date Cumulative 719 2,879 24'.120

11. Ilours in Reporting Period
12. Number OfIlours Reactor Was Critical 69.5 1,731.7 3 3,g3 4 ; -

0 34.8 2,513.4

13. Reactor Renrve Shutdown flours
14. Ilours Generator On-Line 240.8 1,593.4 10,935.7
15. Unit Reserve Shutdown I!ours 0 0 1,731.4 509,605 3,743,803 24,832.305 1 16. Gross Thermal Energy Generated (51Wil)
17. Gross Electrical Energy Generated IMWil) 170,048 ,

1,250,814 8.277.967 IS. Net Electrical Energy Generated (MWil) 155,299 1,165,669 7.699.518

19. Unit Service Factor 33.5 55.3 45.3
20. Unit Asailability Factor 33.5 55.3 52.5
21. Unit Capacity Factor (Using MDC Net) _

24.3 45.5 36.5

22. Unit Capacitv Factor IU>ing DER Net) 23.8 44.7 35.2
23. Unit Forced Outage Rate

. 7.0 34.1 26.6

24. Shutdowns Scheduled Oser Next 6 Months (Ty pe. Date.and Duration of Each t:

B

25. If Shut Down At End Of Report Period. Estimated Date of St.'rtup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITI \ L CRITICA LITY INillAL ELECTRICITY COM\lERCI4L OPERATION 8211110303 820108 PDR ADOCK 05000346 ("/771 R PDR

.