ML12046A877: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 128: | Line 128: | ||
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM) | JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM) | ||
Operators Name: | Operators Name: | ||
Job Title: | Job | ||
==Title:== | |||
EO RO SRO STA SRO Cert JPM | |||
==Title:== | |||
Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 02 Task Number and | |||
==Title:== | |||
350901.23, Manual Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter K/A System K/A Number Importance (RO/SRO) 262002 2.1.30 4.4 4.0 Suggested Testing Environment: Plant Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes | |||
==References:== | ==References:== | ||
Line 135: | Line 144: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name: (Print) | Evaluators Name: (Print) | ||
Line 266: | Line 274: | ||
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM) | JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM) | ||
Operators Name: | Operators Name: | ||
Job Title: | Job | ||
==Title:== | |||
NLO RO SRO STA SRO Cert JPM | |||
==Title:== | |||
RSP - Div 1 LPCI Operation JPM Number: JPM454 Revision Number: 00 Task Number and | |||
==Title:== | |||
400301.02 Remote Shutdown Panel tasks that do NOT Require MCR Evacuation, Loss of Vital System Control ONLY (licensed task). | |||
K/A System K/A Number Importance (RO/SRO) 295016 AA1.07 4.2 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes | K/A System K/A Number Importance (RO/SRO) 295016 AA1.07 4.2 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes | ||
Line 273: | Line 290: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name: (Print) | Evaluators Name: (Print) | ||
Line 399: | Line 415: | ||
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM) | JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM) | ||
Operators Name: | Operators Name: | ||
Job Title: | Job | ||
==Title:== | |||
NLO RO SRO STA SRO Cert JPM | |||
==Title:== | |||
Emergency Initiation of the Div 2 DG Room CO2 System JPM Number: JPM455 Revision Number: 00 Task Number and | |||
==Title:== | |||
321301.56 Emergency Initiation of the Diesel Generator Rooms CO2 System. | |||
K/A System K/A Number Importance (RO/SRO) 286000 2.4.25 3.3 3.7 Suggested Testing Environment: Plant Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes | K/A System K/A Number Importance (RO/SRO) 286000 2.4.25 3.3 3.7 Suggested Testing Environment: Plant Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes | ||
Line 406: | Line 431: | ||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name: (Print) | Evaluators Name: (Print) |
Latest revision as of 18:03, 6 February 2020
ML12046A877 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 08/29/2011 |
From: | Operations Branch III |
To: | Exelon Nuclear |
References | |
JPM026 | |
Download: ML12046A877 (33) | |
Text
CLINTON POWER STATION Job Performance Measure Manual Transfer of Distribution Panel Loads (NSPS Solenoid / RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 02 Date: 02/18/2011 Developed By: T Pickley 02/18/2011 Instructor Date Validated By:
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
- 1. Task description and number, JPM description and number are identified.
- 2. Knowledge and Abilities (K/A) references are included.
- 3. Performance location specified. (in-plant, control room, simulator, or other)
- 4. Initial setup conditions are identified.
- 5. Initiating cue (and terminating cue if required) are properly identified.
- 6. Task standards identified and verified by SME review.
- 7. Critical steps meet the criteria for critical steps and are identified with asterisk an (*)
- 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:
Procedure Rev:
Procedure Rev:
- 9. Verify cues both verbal and visual are free of conflict.
- 10. Verify performance time is accurate
- 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date Page 2 of 11
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision Date Description 00 06/11/07 New JPM.
01 08/31/10 Updated Format. Updated Procedure Revision Number.
02 02/18/11 Updated Procedure Revision Number and K/A.
Page 3 of 11
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS:
- Manually Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter IAW CPS 3509.01, Rev 020b, INSTRUMENT POWER SYSTEM (IP).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- CPS 3509.01, Rev 020b, INSTRUMENT POWER SYSTEM (IP)
EVALUATOR INSTRUCTIONS:
- Amplifying cues are provided within the JPM steps.
- Provide examinee the procedure.
- Do NOT allow examinee to shine any type light into a panel.
- All pre-job briefings are completed.
Page 4 of 11
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
- Plant is in Mode 1.
- RPS Solenoid Inverter A has just been restored from a short maintenance period.
- The RPS Solenoid Inverter A has been energized per Section 8.3.6 steps 1 and 2.
It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.
- MSIV solenoid currents have been verified normal (solenoids are reset).
- The A and B solenoids for each Control Rod have been verified energized.
INITIATING CUE:
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus A FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.
START TIME:
Page 5 of 11
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CAUTION When the Inverter Transfer Switch is moved from the BYPASS position, it moves from the BYPASS position to the OFF position before moving to the INVERTER position. This will initiate a HALF SCRAM if the other bus is energized or a FULL SCRAM if the other bus is deenergized. This could cause a single rod scram if the other solenoid is deenergized. Also, 120 VAC Output Bkr, CB-3 will trip OFF due to the Power Monitor.
CPS No. 3509.01, Instrument Power System (IP) 8.3.4 Manual Transfer of Distribution Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter 8.3.4.1 Verify LOSS OF SYNC lamp not illuminated.
Standard: At RPS Solenoid Inverter A verifies the loss of sync lamp is not illuminated.
Cue: 1. Loss of sync lamp is not illuminated - (NOTE: Ensure operator is at RPS Solenoid Inverter A.)
Comments SAT UNSAT Comment Number Page 6 of 11
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM) 8.3.4.2 IF MSIVs are open, THEN Verify MSIV solenoids are reset using ammeters in NSPS Panels 1H13-P661 and P662. <<CM-5>>
Standard: Verifies MSIV Solenoids are reset.
Cue: 1. Stated in the initial conditions all solenoids were reset.
Comments SAT UNSAT Comment Number 8.3.4.3 (Modes 1 and 2 only)
Check A and B solenoids for each control rod to ensure they are energized prior to transferring sources (provided adequate time is available for the check).
Temperature should be greater than ambient.
Standard: Ensures all control rods A and B solenoids are energized.
Cue: 1. Stated in the initial conditions all solenoids were energized.
Comments SAT UNSAT Comment Number Page 7 of 11
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
- 8.3.4.4 Place TRANSFER SWITCH to INVERTER.
Standard: At RPS Solenoid Inverter A, places Transfer Switch To Inverter Position.
Cue: 1. Transfer switch is in the Inverter Position.
Comments As Found Position: BYPASS SAT UNSAT Comment Number 8.3.4.5 Push and then release:
Power Monitor RESET push-button.
Standard: At RPS Solenoid Inverter A, pushes then releases Power Monitor Reset push button.
Cue: 1. Power Monitor Reset pushbutton has been depressed then released.
Comments SAT UNSAT Comment Number 8.3.4.6 Verify power monitor alarms are out.
Standard: At RPS Solenoid Inverter A power monitor, verifies alarms are out.
Cue: 1. Power Monitor alarms are out.
Comments SAT UNSAT Comment Number Page 8 of 11
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
- 8.3.4.7 Place 120 VAC OUTPUT BKR, CB-3 to ON.
Standard: At RPS Solenoid Inverter A, places 120 vac Output Bkr, CB-3, to ON.
Cue: 1. 120 VAC Output Bkr, CB-3 is in the ON position.
Comments As Found Position: OFF SAT UNSAT Comment Number 8.3.4.8 IF Mngt or NSED recommends, THEN At 1C71-S005A(B), NSPS Sol Pwr Bypass Regul Xfmr:
Place AC INPUT (POWER) Bkr to OFF (down).
5006-3L(4L) will be in alarm when bkr is OFF.
Standard: Leaves the Bypass Regul Transformer energized and in standby or asks the MCR for direction on what status to leave the Bypass Regul Transformer in.
Cue: 1. If requested, as the MCR direct the operator to leave the Bypass Regul Transformer energized and in standby. DO NOT turn the AC Input Bkr to OFF.
Comments SAT UNSAT Comment Number TERMINATING CUES:
CPS 3509.01, Instrument Power (IP), Step 8.3.4 complete.
STOP TIME:
Page 9 of 11
JPM Number: JPM 026 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
Title:
Title:
Manual Transfer of Distribution Panel Loads (NSPS Solenoid/RPS) from ALTERNATE POWER to INVERTER JPM Number: JPM026 Revision Number: 02 Task Number and
Title:
350901.23, Manual Transfer of Distribution Load Panel Loads (NSPS Solenoid) (RPS) FROM Alternate Power TO the Inverter K/A System K/A Number Importance (RO/SRO) 262002 2.1.30 4.4 4.0 Suggested Testing Environment: Plant Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Faulted: Yes No Perform Alternate Path: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
CPS 3509.01, Rev 020b, INSTRUMENT POWER SYSTEM (IP)
EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: (Print)
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training)
Page 10 of 11
Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
- Plant is in Mode 1.
- RPS Solenoid Inverter A has just been restored from a short maintenance period.
- The RPS Solenoid Inverter A has been energized per Section 8.3.6 steps 1 and 2.
It is now desired to transfer the Dist. Panel loads back to the inverter per step 8.3.4.
- MSIV solenoid currents have been verified normal (solenoids are reset).
- The A and B solenoids for each Control Rod have been verified energized.
INITIATING CUE:
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
You are directed to manually Transfer Distribution Panel loads for RPS Solenoid Bus A FROM Alternate Power TO the Inverter per 3509.01, section 8.3.4.
Page 11 of 11
CLINTON POWER STATION Job Performance Measure RSP - Div 1 LPCI Operation JPM Number: JPM454 Revision Number: 00 Date: 07/26/2011 Developed By: W. Kiser 07/26/2011 Instructor Date Validated By:
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:
Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 11
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision Date Description 00 07/26/2011 New JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 11
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
Simulator Setup Instructions
- 1. Initialize to any suitable IC with the following:
- Reactor Scram.
- RPV depressurized.
- 2. When the above steps are completed for this and other JPMs to be run concurrently, then validate the concurrently run JPMs if applicable.
- 3. This completes the setup for this JPM.
- 5. Freeze Simulator.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 11
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
TASK STANDARDS:
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- JPM may be simulated or performed at the Simulator Remote Shutdown Panel (RSP).
- Amplifying cues are provided within the JPM steps.
- All pre-job briefings are completed.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 11
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
A plant transient has occurred.
You are the Extra RO. The plant is Shutdown and depressurized.
INITIATING CUE:
CAUTION All pre-job briefings are completed.
Inject to the RPV using CPS 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation Section 3.0, DIV 1 LPCI STARTUP.
MAXIMIZE flowrate.
Report to the CRS when Div 1 LPCI is injecting to the RPV at the maximum flowrate.
START TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 11
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation 3.1 Verify 1E12-F004A, RHR A Suppression Pool Suction Valve handswitch is in OPEN.
Standard: 1E12-F004A handswitch verified in OPEN.
Cue:
Comments SAT UNSAT Comment Number
- 3.2 Verify/place following transfer switches to EMERG:
a) C61-S6 d) C61-S9 b) C61-S7 e) C61-S12 c) C61-S8 f) C61-HS502 Standard: Transfer switches C61-S6, C61-S7, C61-S8, C61-S9, C61-S12 and C61-HS502 placed to EMERG.
Cue:
Comments SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 11
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
- 3.3 Open 1E12-F064A, RHR Pump A Min Flow Recirc Valve.
Standard: 1E12-F064A handswitch to OPEN then spring release. Red light LIT and Green light NOT LIT.
Cue:
Comments SAT UNSAT Comment Number
- 3.4 Start RHR Pump A, 1E12-C002A.
Standard: 1E12-C002A handswitch to START then spring release. Red light LIT and Green light NOT LIT.
Cue:
Comments SAT UNSAT Comment Number 3.5 Verify RHR Pump 1A Room Sply Fan, 1VY02C starts.
Standard: Verifies 1VY02C Red light LIT and Green light NOT LIT.
Cue:
Comments SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 11
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
- 3.6 WHEN RPV pressure < 472 psig, THEN Open 1E12-F042A, LPCI From RHR A Shutoff Valve.
Standard: Verify RPV pressure < 472 psig.
1E12-F042A handswitch to OPEN then spring release. Red light LIT and Green light NOT LIT.
Cue:
Comments As the CRS, if asked by the candidate if he/she should shut 1E12-F064A, direct the candidate to maximize flow.
SAT UNSAT Comment Number 3.7 WHEN RHR A flow 1100 gpm, THEN Shut 1E12-F064A, RHR Pump A Min Flow Recirc Valve.
Standard: Verify RHR A flow 1100 gpm.
1E12-F064A handswitch to CLOSE then spring release. Red light NOT LIT and Green light LIT.
Cue:
Comments SAT UNSAT Comment Number TERMINATING CUES:
Div 1 LPCI is injecting to the RPV IAW CPS No. 4003.01C006.
STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 11
JPM Number: JPM454 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
Title:
Title:
RSP - Div 1 LPCI Operation JPM Number: JPM454 Revision Number: 00 Task Number and
Title:
400301.02 Remote Shutdown Panel tasks that do NOT Require MCR Evacuation, Loss of Vital System Control ONLY (licensed task).
K/A System K/A Number Importance (RO/SRO) 295016 AA1.07 4.2 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes
References:
CPS No. 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: (Print)
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11
Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
A plant transient has occurred.
You are the Extra RO. The plant is Shutdown and depressurized.
INITIATING CUE:
CAUTION All pre-job briefings are completed.
Inject to the RPV using CPS 4003.01C006, Rev 0 RSP - Div 1 LPCI Operation Section 3.0, DIV 1 LPCI STARTUP.
MAXIMIZE flowrate.
Report to the CRS when Div 1 LPCI is injecting to the RPV at the maximum flowrate.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 11
CLINTON POWER STATION Job Performance Measure Emergency Initiation of the Div 2 DG Room CO2 System JPM Number: JPM455 Revision Number: 00 Date: 07/26/2011 Developed By: W. Kiser 07/26/2011 Instructor Date Validated By:
SME or Instructor Date Reviewed By:
Operations Representative Date Approved By:
Training Department Date SRRS: 3D.105 (when utilized for operator initial or continuing training)
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.
Prior to JPM usage, revalidate JPM using steps 8 and 12 below.
________ 1. Task description and number, JPM description and number are identified.
________ 2. Knowledge and Abilities (K/A) references are included.
________ 3. Performance location specified. (in-plant, control room, simulator, or other)
________ 4. Initial setup conditions are identified.
________ 5. Initiating cue (and terminating cue if required) are properly identified.
________ 6. Task standards identified and verified by SME review.
________ 7. Critical steps meet the criteria for critical steps and are identified with an asterisk
(*).
________ 8. Verify the procedure(s) referenced by this JPM reflects the current revision:
Procedure Rev:
Procedure Rev:
Procedure Rev:
________ 9. Verify cues both verbal and visual are free of conflict.
________ 10. Verify performance time is accurate
________ 11. If the JPM cannot be performed as written with proper responses, then revise the JPM.
________ 12. When JPM is initially validated, sign and date JPM cover page. Subsequent validations, sign and date below:
SME / Instructor Date SME / Instructor Date SME / Instructor Date SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 2 of 11
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
Revision Record (Summary)
Revision Date Description 00 07/26/2011 New JPM.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 3 of 11
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
READ TO THE OPERATOR I will explain the initial conditions, which step(s) to simulate or discuss, and provide the initiating cues. When you complete the task successfully, the objective of this Job Performance Measure will be satisfied.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
TASK STANDARDS:
- Emergency initiation of Division 2 Diesel Generator CO2 System complete (simulated discharging).
TOOLS, EQUIPMENT, OTHER SPECIAL REQUIREMENTS:
- None PROCEDURAL/
REFERENCES:
- Amplifying cues are provided within the JPM steps.
- Provide examinee the procedure.
- Do NOT allow examinee to shine any type light into a panel.
- All pre-job briefings are completed.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 4 of 11
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
A fire has been reported in the Division 2 Diesel Generator (Div 2 DG) Room. The Div 2 DG Room CO2 system did not automatically initiate.
The Div 2 DG Room is free of personnel and Extra Operators have been stationed at the Div 2 DG Room doors to ensure no personnel enter the room. When asked, the Extra Operators will also inform you when the Div 2 DG Room CO2 system initiates (begins discharging).
INITIATING CUE:
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
You are directed to manually initiate the Div 2 DG Room CO2 System using CPS 3213.01P001, Fire Protection CO2 Systems Operation.
Report to the CRS when the Div 2 DG Room CO2 System is discharging.
START TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 5 of 11
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
PERFORMANCE INFORMATION Critical steps are denoted with an asterisk (*) to the left of the step number and appear in BOLDED letters. Failure to meet the standards for a critical step constitutes failure of the Job Performance Measure. The sequence of steps is assumed unless denoted in the comments section of the JPM.
PERFORMANCE STEPS CPS 3213.01P001, Fire Protection CO2 Systems Operation Section 8.22, Manual Initiation of the Diesel Generator Rooms CO2 System 8.22.1 Perform/Ensure Performed a search and rescue of the area unless it is known to be free of personnel.
Standard: Asks Extra Operator of Div 2 DG Room status.
Cue:
Comments When requested, or if the candidate attempts to check for himself/herself, as Extra Operator report that the room is free of personnel.
SAT UNSAT Comment Number
- 8.22.2 Pull the Breakglass station and depress button to initiate discharge.
- 1HSCO002A, for DG1B Room CO2 Breakglass Station Standard: (SIMULATE) At 1HSCO002A Breakglass station pulled; button DEPRESSED.
Cue: Glass BROKEN. Button DEPRESSED.
Comments When requested, as Extra Operator report the Div 2 DG Room CO2 system did not discharge.
SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 6 of 11
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
BEGIN ALTERNATE PATH CPS 3213.01P001, Fire Protection CO2 Systems Operation Section 8.23, Redundant Manual Initiation of the Diesel Generator Rooms CO2 System
- 8.23.1/2 IF no discharge occurs by manual initiation of the Breakglass station, THEN OPEN Master Pilot Valve No. 1 per step 8.23.2.
(located across the corridor on 737 Control at 128-AA)
To operate 1USV-CO005, Master Pilot Valve No. 1, break glass and open the pilot which charges the CO2 lines from the CO2 storage tank up to the Selector Valves.
Standard: (SIMULATE) At 1USV-CO005 glass broken; pilot OPENED.
Cue: Glass BROKEN. Pilot OPENED.
Comments SAT UNSAT Comment Number
- 8.23.3 To initiate flow of CO2 from the CO2 Storage Tank to the DG room containing the hazard, open the Selector Valve for the applicable DG room.
- For DG1B Room, Open 1USV-CO002, Selector Pilot Valve, for 1 minute.
Standard: (SIMULATE) At 1USV-CO002 glass broken; pilot OPENED for 1 minute.
Cue: Glass BROKEN. Pilot OPENED.
Comments When requested, as Extra Operator report the Div 2 DG Room CO2 system did not discharge.
SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 7 of 11
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
CPS 3213.01P001, Fire Protection CO2 Systems Operation Section 8.24, Emergency Initiation of the Diesel Generator Rooms CO2 System 8.24.1 IF both methods of manual initiation fail to discharge, THEN initiate the CO2 system as follows:
Open/Check Open Master Pilot Valve No. 1.
Standard: (SIMULATE) At 1USV-CO005; pilot checked OPEN.
Cue: 1USV-CO005 OPEN Comments SAT UNSAT Comment Number 8.24.2 Open/Check Open the desired Selector Pilot Valve.
Standard: (SIMULATE) At 1USV-CO002; pilot checked OPEN.
Cue: 1USV-CO002 OPEN Comments SAT UNSAT Comment Number SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 8 of 11
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
- 8.24.3/4 Proceed to 1CO652, Remote Emergency Manual Valve (located at A & 126 at 737 Radwaste).
Open 1CO652, Remote Emergency Manual Valve, by breaking seal and pull lever down.
Standard: (SIMULATE) At 1CO652 Seal broken; lever pulled down.
Cue: Seal Broken. Lever in downward position.
Comments When requested, as Extra Operator report the Div 2 DG Room CO2 system IS discharging.
SAT UNSAT Comment Number TERMINATING CUES:
Div 2 DG Room CO2 System is discharging (simulated).
STOP TIME:
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 9 of 11
JPM Number: JPM455 Clinton Power Station Job Performance Measure (JPM)
Operators Name:
Job
Title:
Title:
Emergency Initiation of the Div 2 DG Room CO2 System JPM Number: JPM455 Revision Number: 00 Task Number and
Title:
321301.56 Emergency Initiation of the Diesel Generator Rooms CO2 System.
K/A System K/A Number Importance (RO/SRO) 286000 2.4.25 3.3 3.7 Suggested Testing Environment: Plant Actual Testing Environment: Simulator Plant Control Room Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
CPS No. 3213.01P001, Rev 0f Fire Protection CO2 Systems Operation EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: (Print)
Evaluators Signature: Date:
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 10 of 11
Clinton Power Station Job Performance Measure (JPM)
INITIAL CONDITIONS:
A fire has been reported in the Division 2 Diesel Generator (Div 2 DG) Room. The Div 2 DG Room CO2 system did not automatically initiate.
The Div 2 DG Room is free of personnel and Extra Operators have been stationed at the Div 2 DG Room doors to ensure no personnel enter the room. When asked, the Extra Operators will also inform you when the Div 2 DG Room CO2 system initiates (begins discharging).
INITIATING CUE:
CAUTION All pre-job briefings are completed.
No equipment or controls will be manipulated during this evaluation, only Simulated Actions will occur.
Do NOT shine any type light into a panel.
You are directed to manually initiate the Div 2 DG Room CO2 System using CPS 3213.01P001, Fire Protection CO2 Systems Operation.
Report to the CRS when the Div 2 DG Room CO2 System is discharging.
SRRS: 3D.105 (when utilized for operator initial or continuing training) Page 11 of 11