ML19269C902: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 19: | Line 19: | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
Commonwealth Edison | Commonwealth Edison | ||
* @ one First Neonal Plaza. Chicago, Address Reply to: Post Off.ce Box 767 Chicago, Illinois 60690 | * @ one First Neonal Plaza. Chicago, Address Reply to: Post Off.ce Box 767 Chicago, Illinois 60690 | ||
/ ) f.[(-w c /-litinois | / ) f.[(-w c /-litinois f-A, fc . | ||
f-A, fc . | |||
>) D w ye ,, | >) D w ye ,, | ||
February 2, 1979 fA o "J' ~ | February 2, 1979 fA o "J' ~ | ||
Line 38: | Line 35: | ||
k ff vu 7 9 0 2 20 0 OS2s | k ff vu 7 9 0 2 20 0 OS2s | ||
. Commonwealth Edison Mr. Harold R. Denton February 2,1979 In the case of balance of plant, we did not choose a standardized design because of our desire to make Carroll County an extension of our Byron and Braidwood design. The Byron and Braidwood design incorporates Edison's experience in construction, operation, and maintenance which has an impact over the life of the plant. Additionally, by using the same architect-engineer, we are able to capitalize on standard specifications and design concepts. It would be difficult to incorporate this feedback if we were to incorporate a standardized design in which we are not familiar. With our experience on the licensing of Byron and Braidwood, we have great confidence that the licensing requirements are understood and can be met. | |||
. Commonwealth Edison | |||
Mr. Harold R. Denton February 2,1979 In the case of balance of plant, we did not choose a standardized design because of our desire to make Carroll County an extension of our Byron and Braidwood design. The Byron and Braidwood design incorporates Edison's experience in construction, operation, and maintenance which has an impact over the life of the plant. Additionally, by using the same architect-engineer, we are able to capitalize on standard specifications and design concepts. It would be difficult to incorporate this feedback if we were to incorporate a standardized design in which we are not familiar. With our experience on the licensing of Byron and Braidwood, we have great confidence that the licensing requirements are understood and can be met. | |||
Commonwealth Edison supports standardization in the licensing process and feels that our plans for the Carroll County project incorporate standardization as much as practicable. | Commonwealth Edison supports standardization in the licensing process and feels that our plans for the Carroll County project incorporate standardization as much as practicable. | ||
Very truly yours, c . hl Cordell Reed Assistant Vice President | Very truly yours, c . hl Cordell Reed Assistant Vice President | ||
.}} | .}} |
Latest revision as of 19:05, 1 February 2020
ML19269C902 | |
Person / Time | |
---|---|
Site: | 05000545 |
Issue date: | 02/02/1979 |
From: | Reed C COMMONWEALTH EDISON CO. |
To: | Harold Denton Office of Nuclear Reactor Regulation |
References | |
PROJECT-559A NUDOCS 7902200055 | |
Download: ML19269C902 (2) | |
Text
.
Commonwealth Edison
- @ one First Neonal Plaza. Chicago, Address Reply to: Post Off.ce Box 767 Chicago, Illinois 60690
/ ) f.[(-w c /-litinois f-A, fc .
>) D w ye ,,
February 2, 1979 fA o "J' ~
/:72: -. a v)
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Denton:
I am responding to the question posed by Commi ssioner Bradford as to why Commonwealth Edison chose a custom ra...er than a standardized design for Carroll County Station's NSSS and balance of plant. In the case of the NSSS, we chose the Westinghouse 412 plant which is for a nominal 1200 MWe turbine and does not currently have a PDA. An alternative would have been the Westinghouse 414 plant which has a PDA but is for a 1300 MWe turbine. Reliability is a prime goal for Edison and we are concerned over potential startup problems with the 1300 MWe turbine-generators. Although several 1300 MWe units are on order, none will have had substantial operation before the Carroll County units will be committed to design and manufacturer. On this basis, we did not chose the standardized 414 plant.
Westinghouse also has a PDA for their RESAR 3S plant, which is a nominal 1200 MWe plant and is the same size as the Carroll County plant. We decided against the RESAR 3S plant because it did not have the integrated reactor protection system which we feel will substantially improve the reliability of the plant. Additionally, we have incorporated an advanced control system and new optimized 17x17 fuel which are not a part of the RESAR 3S plant. Edison and Westinghouse believe from a licensing standpoint that there are only small differences between the 412 plant that we bought and the 414 plant which has a PDA. Westinghouse is committed to applying for a PDA, and we believe it will be granted prior to the time needed for referencing on Carroll County.
Therefore, we did not consider that we were buying a custom NSSS design but in fact would have a standardized design by the time it was needed.
After the award of the NSSS, Edison and Westinghouse decided to seek a FPA-2 instead of a PDA for the 412 plant.
Westinghouse felt they had sufficient final design information and this would be a great opportunity to make one-stop lic ensing a reality. After discussions with the staff, we have concluded that a FDA-2 could not be reviewed and granted in time for referencir.g at the Carroll County construction permit stage. Therefore, Westinghouse will continue their pursuit for a PDA. It is our hope that after the PDA is obtained for the 412 plant, that the staff will continue the review for a FDA. g@
k ff vu 7 9 0 2 20 0 OS2s
. Commonwealth Edison Mr. Harold R. Denton February 2,1979 In the case of balance of plant, we did not choose a standardized design because of our desire to make Carroll County an extension of our Byron and Braidwood design. The Byron and Braidwood design incorporates Edison's experience in construction, operation, and maintenance which has an impact over the life of the plant. Additionally, by using the same architect-engineer, we are able to capitalize on standard specifications and design concepts. It would be difficult to incorporate this feedback if we were to incorporate a standardized design in which we are not familiar. With our experience on the licensing of Byron and Braidwood, we have great confidence that the licensing requirements are understood and can be met.
Commonwealth Edison supports standardization in the licensing process and feels that our plans for the Carroll County project incorporate standardization as much as practicable.
Very truly yours, c . hl Cordell Reed Assistant Vice President
.