{{#Wiki_filter:NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:              I 50-528 UNIT NAME:                PVNGS-1 DATE:                      1/14/98 COMPLETED BY:              J. D. Fulton TELEPHONE:                  602 250-3549 Reporting Period:            December 1997
: 1. Design Electrical Rating (Net MWe):        1265
: 2. Maximum Dependable Capacity (Net MWe):              1243 Unit 1 Generatin      Statistics                  This Month          Yr.,to Date        Cumulative
: 3. Hours Reactor was Critical                                                744.0              8,671.1          73,996.3
: 4. Hours Generator was On-Line                                              744.0              8,658.6          72,811.1
: 5. Unit Reserve Shutdown Hours                                                  0.0                  0.0                0.0
: 6. Net Electrical Ener        Generated    MWh                            934,524          10,737,706          86,203,268 UNIT SHUTDOWNS Outage                    Method of Duration                  Shutting Down              Cause and Corrective Action No.        Date          Type~      Hours        Reason~      Reactor3                    to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced          2Reason:                                            3Method:
S-Scheduled          A-Equipment Failure (Explain)                        1-Manual B-Maintenance or Test                              2-Manual Trip / Scram C-Refueling                                          3-Automatic Trip / Scram D-Regulatory Restriction                            4-Continuation E-Operator Training / License Examination          5-Other-(Explain)
F-Administrative 6-Operational Error (Explain)
H-Other (Explain)
 
==SUMMARY==
980i220042 980ii4 PDR    AOQCK      05000528 R                          PDR
 
e NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:              50-529 I
UNIT NAME:              PVNGS-2 DATE:                    1/1 4/98 COMPLETED BY:            J. D. Fulton TELEPHONE:                602 250-3549 Reporting Period:            December 1997
: 1. Design Electrical Rating (Net MWe):        1265
: 2. Maximum Dependable Capacity(NetMWe):              1243 Unit 2 Generatin    Statistics                  This Month          Yr. to Date        Cumulative
: 3. Hours Reactor was Critical                                              744.0              7,692.0          73,425.7
: 4. Hours Generator was On-Line                                            744.0              7,661.9          72,232.8
: 5. Unit Reserve Shutdown Hours                                                0.0                  0.0                0.0
: 6. Net Electrical Ener      Generated    MWh                            948,014            9,322,667          86,429,559 UNIT SHUTDOWNS Outage                    Method of Duration                Shutting Down              Cause and Corrective Action No.        Date        Type~      Hours      Reasons      Reactor3                    to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced        2Reason:                                          sMethod:
S-Scheduled        A-Equipment Failure (Explain)                      1-Manual B-Maintenance or Test                              2-Manual Trip / Scram C-Refueling                                        3-Automatic Trip / Scram D-Regulatory Restriction                          4-Continuation E-Operator Training /License Examination          5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)
 
==SUMMARY==
t NRC MONTHLYOPERATING DATA REPORT t
DOCKET NO.:            50-530 UNIT NAME:              PVNGS-3 DATE:                  1/14/98 COMPLETED BY:          J. D. Fulton TELEPHONE:              602 250-3549 Reporting Period:          December 1997
: 1. Design Electrical Rating (Net MWe):        1269
: 2. Maximum Dependable Capacity(Net MWe):              1247 Unit 3 Generatin    Statistics                  This Month          Yr. to Date        Cumulative Hours Reactor was Critical                                              744.0              7,868.9            69,325.7 Hours Generator was On-Line                                              744.0              7,822.1            68,499.6 Unit Reserve Shutdown Hours                                                0.0                  0.0                0.0 Net Electrical Ener    Generated    MWh                              933,789            9,453,826          82,752,971 UNIT SHUTDOWNS Outage                    Method of Duration                  Shutting Down              Cause and Corrective Action No.        Date        Types'ours              Reason~      Reactors                    to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced        ~Reason:                                          s Method:
S-Scheduled        A-Equipment Failure (Explain)                      1-Manual B-Maintenance or Test                              2-Manual Trip / Scram C-Refueling                                        3-Automatic Trip / Scram D-Regulatory Restriction                            4-Continuation E-Operator Training / License Examination          5-Other-(Explain)
F-Administrative 6-Operational Error (Explain)
H-Other (Explain)
 
==SUMMARY==
                                                              }}

Latest revision as of 02:28, 4 February 2020

Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3
ML17313A181
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/31/1997
From: Fulton J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17313A180 List:
References
NUDOCS 9801220042
Download: ML17313A181 (3)


Text

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: I 50-528 UNIT NAME: PVNGS-1 DATE: 1/14/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generatin Statistics This Month Yr.,to Date Cumulative
3. Hours Reactor was Critical 744.0 8,671.1 73,996.3
4. Hours Generator was On-Line 744.0 8,658.6 72,811.1
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Ener Generated MWh 934,524 10,737,706 86,203,268 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reason~ Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.

F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 6-Operational Error (Explain)

H-Other (Explain)

SUMMARY

980i220042 980ii4 PDR AOQCK 05000528 R PDR

e NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-529 I

UNIT NAME: PVNGS-2 DATE: 1/1 4/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity(NetMWe): 1243 Unit 2 Generatin Statistics This Month Yr. to Date Cumulative
3. Hours Reactor was Critical 744.0 7,692.0 73,425.7
4. Hours Generator was On-Line 744.0 7,661.9 72,232.8
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Ener Generated MWh 948,014 9,322,667 86,429,559 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reasons Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.

F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training /License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

t NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 1/14/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997

1. Design Electrical Rating (Net MWe): 1269
2. Maximum Dependable Capacity(Net MWe): 1247 Unit 3 Generatin Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,868.9 69,325.7 Hours Generator was On-Line 744.0 7,822.1 68,499.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Ener Generated MWh 933,789 9,453,826 82,752,971 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Types'ours Reason~ Reactors to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.

F-Forced ~Reason: s Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 6-Operational Error (Explain)

H-Other (Explain)

SUMMARY