ML18067A756: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 22: Line 22:
In 1994, an Appendix R Enhancement Plan was established at Palisades to reconstitute Appendix R design bases. Implementing this Plan resulted in the
In 1994, an Appendix R Enhancement Plan was established at Palisades to reconstitute Appendix R design bases. Implementing this Plan resulted in the
(
(
                                                                                                                                              **
II development of a number of new engineering analyses. This LER condition was identified during validation of these analyses; an effort which is ongoing.
* II development of a number of new engineering analyses. This LER condition was identified during validation of these analyses; an effort which is ongoing.
ti')
ti')
~~~  
~~~  
Line 38: Line 37:
"Q          "'. ;  ,! -,
"Q          "'. ;  ,! -,
r ,I A\ ft._h \)-{ -~-~-~"--
r ,I A\ ft._h \)-{ -~-~-~"--
                                                            - -
                                                                 .*.)__,
                                                                 .*.)__,
O'-D.tn "l' \_ ;,., ':.:* ..)    .___:. *~<*'-*
O'-D.tn "l' \_ ;,., ':.:* ..)    .___:. *~<*'-*

Latest revision as of 10:02, 3 February 2020

Forwards LER 97-010-00 Re Inadequacy of App R Analysis. Commitments Made by Util,Listed
ML18067A756
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/30/1997
From: Thomas J. Palmisano
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18067A757 List:
References
NUDOCS 9711050108
Download: ML18067A756 (2)


Text

{{#Wiki_filter:Consumels Energy~ i I

                                                                                            -:31 :';   s 76.J :?296
                                                                                           ; _y    *;~. :~  :--s..: ]J]5 Thoma* J. Palmisano Site Vice President October 30, 1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT LICENSEE EVENT REPORT 97-010 - INADEQUACY IN'8H,13J.:J~.QJ2S~fi~NALYSIS RESULTS IN A CONDITION OUTSIDE THE DESIGN BASIS OF THE PLANT Licensee Event Report (LER) 97-010 is attached. This event is reportable to the NRC in accordance with 10 CFR 50.73(a)(2)(ii)(B) as a condition outside the plant design basis. This condition was found during a planned review of the 10 CFR 50, Appendix R program engineering analyses. This review determined an analysis contained errors which could potentially place the plant in a scenario which was not addressed with approved procedures.

In 1994, an Appendix R Enhancement Plan was established at Palisades to reconstitute Appendix R design bases. Implementing this Plan resulted in the ( II development of a number of new engineering analyses. This LER condition was identified during validation of these analyses; an effort which is ongoing. ti') ~~~

SUMMARY

OF COMMITMENTS ~~- 0'-0 This letter contains two new commitments and no revisions to existing commitments. -f'  !) { _,.,.,...,..--* ./

                                                                                                                                                     ,V -

~~ 1. A revision to the circuit and raceway schedule and to the schematic diagram will 08 be completed to identify the cable in the Atmospheric Steam Dump Valves ~< (ASDV) circuit that is routed from control panel EC01 to control panel EC 12.

o:

"Q "'. ; ,! -, r ,I A\ ft._h \)-{ -~-~-~"--

                                                               .*.)__,

O'-D.tn "l' \_ ;,., ':.:* ..) .___:. *~<*'-*

                                         .---*- .                                                                           ~

IIll\\\ ll\\\ \l\11 \lUI ll\11 \l\lllIll 1\ll

                                                      \          \
  • IQ IQ 7

2

2. The Appendix R Engineering Analysis will be updated with the results of the evaluation that four ASDVs and the Turbine Bypass Valve (TBV) could possibly
      *open in the postulated fire scenario.
     ~;;YL~

Thomas J. Palmisano Site Vice-President CC Administrator, Region 111, USNRC Project Manager, NRR, USNRC NRC Resident Inspector - Palisades Attachment}}